First Notice | 7/22/2016 | 7/22/2016 | 5/5/2020 | | DONE |
Tony Young
|
|
|
This permit finaled on the web by Samantha Tallman
|
First Notice | 7/22/2016 | 7/22/2016 | 5/5/2020 | | DONE |
Tony Young
|
|
|
This permit finaled on the web by Samantha Tallman
|
First Notice | 1/13/2016 | 1/13/2016 | 5/5/2020 | | DONE |
Jim Sly
|
|
|
This permit finaled on the web by Samantha Tallman
|
BLD-Aging Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/21/2016 | 7/21/2016 | 7/22/2016 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 3/8/2016 | 3/9/2016 | 3/9/2016 | A | PASS |
Tony Young
|
|
|
Cory Phone #: ###-####
|
BLD-Final | 3/8/2016 | 3/8/2016 | 3/8/2016 | P | PEND |
Tony Young
|
|
|
Cory Phone #: ###-####,, ok pending zoning
|
Zoning Approval | 3/8/2016 | 3/8/2016 | 3/8/2016 | | DONE |
Matthew A Halitsky
|
|
|
|
Zoning Approval | 2/17/2016 | 2/17/2016 | 2/17/2016 | | FAIL |
Matthew A Halitsky
|
|
|
Not ready for final.
|
FIRE-Final Inspection | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, fire/smoke/CO2 detectors are stand-alone, fire extinguishers are in place, point of contact Cory, phone number ###-#### will contact licensed contractor to have inspections on fire extinguishers current before final building inspection. Life ifre safety inspection passed/compete.
|
CHANGE STATUS TO (ISS) | | | 2/12/2016 | | DONE |
|
|
|
Need final inspections from fire, zoning and building.
|
BLD-Conference | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Sly
|
|
|
Cory Phone #: ###-####
|
DOC - Permit Finaled | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | PART |
Tony Young
|
|
|
Corey Phone #: ###-####,, walk through with plan reviewer,, need one hour wall construction on exterior walls,, need one hour for supports in basement
|
BLD-Energy code compliance | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | PASS |
Tony Young
|
|
|
Corey Phone #: ###-####
|
BLD-Framing/Rough-in | 11/19/2015 | 11/20/2015 | 11/20/2015 | A | PASS |
Tony Young
|
|
|
Cory
|
BLD-Conference | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | PART |
Tony Young
|
|
|
Cory Phone #: ###-####,, exterior stair ?s,, preferably need new code compliant stairs
|
BLD-Conference | 11/16/2015 | 11/16/2015 | 11/16/2015 | A | PASS |
Tony Young
|
|
|
11 am conf with engineer and insulator
|
BLD-Conference | 11/3/2015 | 11/5/2015 | 11/5/2015 | A | PEND |
Tony Young
|
|
|
Corry Phone #: ###-####,, walk through,, take plan reviewer
|
BLD-Conference | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | PEND |
Tony Young
|
|
|
Corry Phone #: ###-####,, walk through,, take plan reviewer
|
BLD-Conference | 10/30/2015 | 11/2/2015 | 11/2/2015 | P | DEFR |
Tony Young
|
|
|
Corry Phone #: ###-####,, walk through,, take plan reviewer
|
BLD-Conference | 10/29/2015 | 10/30/2015 | 10/30/2015 | A | PEND |
Tony Young
|
|
|
Corry Phone #: ###-####,, need to have architect or engineer of record to come out and provide details and approval for as built
|
BLD-Footing | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | PASS |
Dave Hannah
|
|
|
Corey Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/17/2015 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 8/17/2015 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 4/22/2015 | 4/22/2015 | 8/13/2015 | | PASS |
Carl D Madsen
|
|
|
First review completed Level 3 due 5/13
|
Plan resubmittals received | | | 8/13/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/13/2015 | | 8/13/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/13/2015 | | DONE |
|
|
|
Needs; ACHD approval, RP, GC Form, Revised Certificate of Value-all requirements met see letter for the ACHD
|
Plan resubmittals received | | | 7/27/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/27/2015 | | 7/27/2015 | | FAIL |
Carl D Madsen
|
|
|
The final review of this project is pending a lot consolidation. Review will be completed once the lot consolidation has been recorded with ADA County.
|
Routing Off Site - STRUCTURAL | 6/17/2015 | | 6/27/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/17/2015 | | 6/27/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/22/2015 | | 5/14/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/22/2015 | | 5/14/2015 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 5/14/2015 | | FAIL |
|
|
|
|
Routing - FIRE | 4/22/2015 | 4/22/2015 | 5/5/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - Design Review | 4/22/2015 | | 4/24/2015 | | PASS |
Sarah Schafer
|
|
|
DRH14-00336
|
Routing - MECHANICAL | 4/22/2015 | | 4/23/2015 | | PASS |
Troy James
|
|
|
Residential Addition with "Ductless systems"
Ductless heat pump with two indoor heads. Manual j report not required. Field inspector to verify mechanical work for code compliance.
|
Routing - PUBLIC WORKS | 4/22/2015 | | 4/22/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 4/22/2015 | | 4/22/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 4/22/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/22/2015 | | DONE |
|
|
|
|
Routing PW Drainage | 4/22/2015 | | 4/22/2015 | | PASS |
Brian Murphy
|
|
|
|
Application received | | | 4/8/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 8 2015 2:43PM
|