BLD-Framing/Rough-in | 9/8/2015 | 9/9/2015 | 9/9/2015 | A | PASS |
Dave Hannah
|
|
|
Noah Phone #: ###-####
|
BLD-Footing | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 5/8/2015 | 5/8/2015 | 5/8/2015 | P | CANC |
Dave Hannah
|
|
|
Cap Phone #: ###-####
|
Plan assigned to (LEG) Tisha | 4/10/2015 | | 4/14/2015 | | DONE |
Tisha Gallop
|
|
|
walk in
|
Plan resubmittals received | | | 4/14/2015 | | DONE |
Tisha Gallop
|
|
|
received 3 copies of plan sheets L1.3 & L1.4
|
Routing - PLAN CHECK | 4/14/2015 | | 4/14/2015 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 4/14/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/14/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/14/2015 | | DONE |
|
|
|
All requirements met
|
Telephone call | | | 4/14/2015 | | DONE |
|
|
|
called Matt to let know permit is ready and how much is owed-left message on his phone
|
Issue PAID IN FULL permit | | | 4/14/2015 | | DONE |
|
|
|
|
Routing Walk-In PW FloodPlain | 4/13/2015 | 4/13/2015 | 4/13/2015 | A | CANC |
Jim Wyllie
|
|
|
Per Jim Wylie no floodplain review required for this project.
|
Routing - PLAN CHECK | 4/13/2015 | | 4/13/2015 | | FAIL |
Tisha Gallop
|
|
|
e-mailed plan review report to Matthew Long.
|
1st review completed | | | 4/13/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 4/8/2015 | 4/8/2015 | 4/8/2015 | P | PASS |
Matthew A Halitsky
|
|
|
|
Routing Walk-In (BLD) | 4/8/2015 | 4/8/2015 | 4/8/2015 | P | FAIL |
Tisha Gallop
|
|
|
needs 3 sets full size plans stamped by engineer, separate application for pergola, headers and shear called out on plans.
|
Application received | | 4/8/2015 | | | |
|
|
|
|