BLD-Final | 7/13/2016 | 7/14/2016 | 7/14/2016 | A | PASS |
Tony Young
|
|
|
Tom Phone #: ###-####
|
DOC - Permit Finaled | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 7/13/2016 | 7/13/2016 | 7/13/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | NR |
Jim Sly
|
|
|
Tom Phone #: ###-#### Called Tom and told him that he needs public works final prior to calling for Bldg final.
|
BLD-Aging Inspection | 6/10/2016 | 6/10/2016 | 6/10/2016 | | PEND |
Tony Young
|
|
|
|
OVERRIDE | | | 5/31/2016 | | |
|
|
|
|
Telephone call | | | 5/31/2016 | | DONE |
|
|
|
called Tom to let know plan mod is ready-as per Tisha G. no fees due-please do not re issue
|
CHANGE STATUS TO (ISS) | | | 5/31/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/31/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 5/24/2016 | | 5/31/2016 | | DONE |
Tisha Gallop
|
|
|
plan mod received 5/24; routed to hillside
|
Routing - PLAN CHECK | 5/24/2016 | | 5/31/2016 | | PASS |
Tisha Gallop
|
|
|
revised grading plan
|
Routing PW Grading-Hillside | 5/24/2016 | | 5/31/2016 | | PASS |
Jason C. Taylor
|
|
|
Approved (with conditions) revised grading plan. JCT
|
Case Summary (BLD) | | | 5/31/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2016 | | DONE |
|
|
|
no fees for plan mod
|
Permit Ready to Issue | | | 5/31/2016 | | DONE |
|
|
|
PLEASE DO NOT RE-ISSUE-this was a plan mod and as per Tisha G. no fees charges.
|
Plan resubmittals received | | | 5/24/2016 | | DONE |
|
|
|
Plan Mod-One copy of sheet 1 of 2. Taken to Tisha
|
Construction Site Erosion | 5/10/2016 | 5/10/2016 | 5/10/2016 | | FAIL |
Jason C. Taylor
|
|
|
NO OCCUPANCY OR TEMPORARY OCCUPANCY UNTIL PW APPROVAL...JCT
|
BLD-Energy code compliance | 1/27/2016 | 1/28/2016 | 1/28/2016 | P | PASS |
Tony Young
|
|
|
Tom Phone #: ###-####
|
BLD-Energy code compliance | 1/27/2016 | 1/27/2016 | 1/27/2016 | P | NR |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 1/27/2016 | 1/27/2016 | 1/27/2016 | P | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####,, ok to insulate
|
BLD-Framing/Rough-in | 1/26/2016 | 1/26/2016 | 1/26/2016 | P | PASS |
Jim Sly
|
|
|
Tom Phone #: ###-#### OK to insulate after Electrical Rough in approval.
|
Plan Modification Accepted | | | 1/26/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/26/2016 | | 1/26/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Framing/Rough-in | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, ok to insulate pending mechanical pass
|
BLD-Framing/Rough-in | 1/22/2016 | 1/25/2016 | 1/25/2016 | A | PEND |
Tony Young
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 1/22/2016 | 1/22/2016 | 1/22/2016 | P | NR |
Tony Young
|
|
|
Tom Phone #: ###-####,, walk through only,, need mech pass
|
BLD-Framing/Rough-in | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | NR |
Tony Young
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 1/21/2016 | 1/21/2016 | 1/21/2016 | P | NR |
Tony Young
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | NR |
Tony Young
|
|
|
Tom Phone #: ###-####,, need trades 1st
|
BLD-Framing/Rough-in | 1/19/2016 | 1/20/2016 | 1/20/2016 | P | NR |
Tony Young
|
|
|
Tom Phone #: ###-####,, need trades 1st
|
BLD-Wall cover | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PART |
Tony Young
|
|
|
fire rated soffit; Scott Phone #: ###-####,, work in progress,, ok
|
BLD-Other | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PART |
Tony Young
|
|
|
fire rated soffit; Scott Phone #: ###-####,, work in progress,, ok so far
|
BLD-Wall Bracing | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####,, exterior ok
|
BLD-Foundation | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PART |
Tony Young
|
|
|
TOm Phone #: ###-####,, rear retaining house wall ok
|
BLD-Footing | 7/21/2015 | 7/22/2015 | 7/22/2015 | A | DONE |
Tony Young
|
|
|
Please call ahead for access - Tom Phone #: ###-####
|
BLD-Foundation | 7/21/2015 | 7/21/2015 | 7/21/2015 | P | PART |
Tony Young
|
|
|
Please call ahead for access - Tom Phone #: ###-####,, will come back in am for plans
|
Plan assigned to (JG) | 7/7/2015 | 7/7/2015 | 7/8/2015 | | PASS |
Javier Guzman
|
|
|
modified footings
|
Routing - PLAN CHECK | 7/7/2015 | | 7/8/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Grading-Hillside | 7/7/2015 | | 7/8/2015 | | PASS |
Jason C. Taylor
|
|
|
No revisions needed. Grading will remain the same. JCT
|
Case Summary (BLD) | | | 7/8/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/8/2015 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 6/30/2015 | 6/30/2015 | 6/30/2015 | | DONE |
Jason C. Taylor
|
|
|
*ENTIRE FOUNDATION**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 6/23/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/8/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/8/2015 | | DONE |
|
|
|
|
Telephone call | | | 6/8/2015 | | DONE |
|
|
|
Spoke with Tom informing him permit is ready and what the fee is
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/8/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 6/8/2015 | | DONE |
|
|
|
NEED GC form HOME OWNER IS GC AND RP
|
Plan assigned to (LEG) Tisha | 5/12/2015 | | 6/8/2015 | | DONE |
Tisha Gallop
|
|
|
1st review 6/2; plan check
|
Case Summary (BLD) | | | 6/7/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/7/2015 | | 6/7/2015 | | PASS |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 6/5/2015 | | DONE |
|
|
|
Two copies of 8x10 Unter MFG. Two copies of sheets 1 of 12, 7 of 12, 8 of 12, 9 of 12 and 10 of 12. Taken to Tisha
|
1st review completed | | | 6/2/2015 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 5/21/2015 | | 6/2/2015 | | FAIL |
Tisha Gallop
|
|
|
see plan review report in documents
|
Routing - PLANNING | 5/13/2015 | | 6/2/2015 | | PASS |
Ted Vanegas
|
|
|
|
Routing - FIRE | 5/14/2015 | | 5/21/2015 | | PASS |
Scott Arellano
|
|
|
No separate comments attached to plans. This structure is required to maintain a 30 foot defensible space perimeter from wildland fire fuel loading in accordance with BMC 7-01-69 section 4920.
|
Routing - MECHANICAL | 5/15/2015 | | 5/15/2015 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 5/14/2015 | | 5/14/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A, Class A roof, Permit for the construction of a new 3038 sq. ft., two story (first story 1610 sq. ft., second story 1428 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 104 sq. ft. of covered patio/porch and a 700 sq. ft. attached garage
|
Routing - MECHANICAL | | | 5/14/2015 | | FAIL |
Troy James
|
|
|
emailed correction to idaho hvac
|
Routing PW Sewer Rating | 5/12/2015 | | 5/13/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 5/12/2015 | | 5/12/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 5/12/2015 | | 5/12/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Flood Plain | 5/12/2015 | | 5/12/2015 | | PASS |
Jason C. Taylor
|
|
|
No requirements as house is now outside of floodplain. JCT
|
Intake Approval | | | 5/12/2015 | | PASS |
Christina Prado
|
|
|
|
Routing PW Grading-Hillside | 5/12/2015 | | 5/12/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
CHANGE STATUS TO (REV) | | | 5/12/2015 | | DONE |
Christina Prado
|
|
|
CFH approved, plans can now be routed
|
Routing PW Grading-Hillside | | | 4/16/2015 | | FAIL |
Jason C. Taylor
|
|
|
Needs Cat II Application. Jason Taylor ###-####.
|
Routing PW Flood Plain | 4/13/2015 | | 4/16/2015 | | FAIL |
Jim Wyllie
|
|
|
Needs revised plans. Jason Taylor ###-####.
|
Routing - FRONT DESK | 4/16/2015 | | 4/16/2015 | | PASS |
Carlos Velazquez
|
|
|
permit changed to pending status until corrected plans are submitted
|
CHANGE STATUS TO (PND) | | | 4/16/2015 | | DONE |
|
|
|
see notes from JCT dated 4-16-15
|
Plans ACCEPTED BY PLAN TECH | | | 4/9/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/9/2015 | | FAIL |
Christina Prado
|
|
|
per Jason Taylor; new plans must be submitted prior to review
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | 4/9/2015 | | | |
|
|
|
|