Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01108
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7570 W SAXTON DR
Project NameThe Kensington Apartments ACTI
Customer NumberBLD15-01118 - 01137,16-00539 & 540
ePlanReview 
Description
(KENSINGTON APARTMENTS – ACTIVITY CENTER) The activity center building does not have a fire sprinkler system. The drawings are filed under BLD15-01107 in ePlanReview. To construct a 1,821 square foot assembly and pool equipment building to serve the occupants of an apartment complex. Work is to include concrete footings, concrete foundations, concrete slab on grade floors, 2 x 6 exterior bearing walls, shear walls and holdowns, an engineered truss roof system, fiber-cement board siding, manufactured stone veneer, asphalt/fiberglass shingles, exterior windows, exterior doors, interior 2 x 4 nonbearing walls, toilet rooms accessible to the disabled, interior doors, a gas fireplace, millwork, and finishes. This building is required to comply as Type V-A construction. This was the option chosen by the Architect to avoid parapets at exterior walls that are too close to Building Q. All exterior and interior bearing walls are required to be of 1-hr fire-resistance-rated construction. The roof/ceiling is required to comply as a 1-hr fire-resistance-rated roof/ceiling assembly. All openings, penetrations, and ducts are required to be properly protected. Special Inspection is required for soils and concrete. A 1-hr incidental use separation wall will be provided to separate the pool equipment room from the rest of the building. The design for the roof trusses is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/17/20178/10/2017 DONE
Mailed 8-11-17
Third Notice 6/17/20177/12/2017 DONE
Mailed 7-13-17
Third Notice 5/15/20176/12/2017 DONE
Mailed 6-13-17
Second Notice 3/19/20175/10/2017 DONE
Mailed 5-11
First Notice 2/4/20173/9/2017 DONE
Permanent Occupancy  1/25/2017 DONE
DetailsChristina Prado
BLD-Final1/20/20171/20/20171/20/2017PPASS
DetailsTony Young
Ed Phone #: ###-####
PubWorks Occupancy Approval12/28/201612/28/201612/28/2016 DONE
DetailsTiffany Lowery
BLD-Final11/18/201611/21/201611/21/2016PNR
DetailsTony Young
Ed Phone #: ###-####,, needing temp glass
Zoning Approval11/21/201611/21/201611/21/2016 PASS
DetailsJosh Wilson
BLD-Final11/17/201611/18/201611/18/2016PNR
DetailsTony Young
Ed Phone #: ###-####,, needs tempered glass
BLD-Conference11/16/201611/18/201611/18/2016PPEND
DetailsTony Young
Ed Phone #: ###-####,, zoning finals ?s
Print Occupancy Form  11/18/2016 DONE
BLD-Final11/16/201611/17/201611/17/2016ANR
DetailsTony Young
Ed Phone #: ###-####
BLD-Final11/15/201611/16/201611/16/2016APART
DetailsTony Young
Ed Phone #: ###-####,, temp occ ok,, needs zoning,, temp glass,, signage,, drain burn protectors
BLD-Final11/9/201611/10/201611/10/2016ANR
DetailsJim Sly
Ed Phone #: ###-####
Need Zoning.......and?
FIRE-Final Inspection11/10/201611/10/201611/10/2016PPASS
DetailsKatie Marron
Life Safety Passed. Verified exit signs/emergency lighting, fire extinguishers and exit hardware.
Print Occupancy Form  11/10/2016 DONE
BLD-Aging Inspection8/26/20168/26/20168/26/2016 PEND
DetailsTony Young
BLD-Aging Inspection8/25/20168/25/20168/26/2016 PASS
DetailsTony Young
BLD-Energy code compliance4/12/20164/13/20164/13/2016APASS
DetailsJim Sly
Ed Phone #: ###-####
BLD-Framing/Rough-in3/25/20163/25/20163/25/2016PPASS
DetailsTony Young
re-inspection ok,, ok to insulate
BLD-Framing/Rough-in3/21/20163/22/20163/22/2016ANR
DetailsTony Young
Ed Phone #: ###-####,, correction posted on truss engineering
BLD-Footing11/25/201511/30/201511/30/2015APART
DetailsTony Young
Ed Phone #: ###-####,, ok pending special inspection
Issue PAID IN FULL permit  11/24/2015 DONE
Inspection Record Card- Bld  11/24/2015 DONE
OVERRIDE  11/20/2015  
Routing Off Site - STRUCTURAL11/12/2015 11/20/2015 PASS
DetailsCarl Westfall
Jan Welch
Routing - PLAN CHECK11/11/2015 11/20/2015 PASS
DetailsCarl Westfall
Plan Reviewer's activity  11/20/2015 DONE
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  11/20/2015 DONE
Permit Ready to Issue  11/20/2015 DONE
all requirments met
Plan assigned to (CJW)5/21/2015 11/20/2015 PASS
DetailsCarl Westfall
ACTIVITY CENTER BUILDING
Routing - PLUMBING11/12/2015 11/19/2015 PASS
DetailsBill VanDegrift
Routing - MECHANICAL11/17/2015 11/17/2015 PASS
DetailsTroy James
Plan resubmittals received  11/11/2015 DONE
DetailsCarl Westfall
Plan resubmittals requested  10/28/2015 DONE
Routing Off Site - STRUCTURAL10/10/2015 10/27/2015 FAIL
DetailsCarl Westfall
Jan Welch
Routing - MECHANICAL10/10/2015 10/23/2015 FAIL
DetailsTroy James
Routing - PLUMBING10/10/2015 10/22/2015 FAIL
DetailsDaryl Spivey
see bld15-01107
Routing - PLAN CHECK10/20/2015 10/21/2015 PASS
DetailsCarl Westfall
Architect chose option to make the building Type V-A construction to avoid parapets
Routing PW Drainage10/10/2015 10/20/2015 PASS
DetailsJason C. Taylor
Project approved under GRD15-00018 ODI 3398. JCT
Routing - PLANNING10/10/2015 10/20/2015 PASS
DetailsDavid Moser
Routing - PLAN CHECK10/8/2015 10/16/2015 FAIL
DetailsCarl Westfall
Fire rate wall required because the building is too close to Building Q
Routing - Design Review10/10/2015 10/13/2015 PASS
DetailsJosh Wilson
Routing - FIRE10/10/2015 10/12/2015 FAIL
DetailsKatie Marron
Hazardous Material Inventory statement not provided. Report attached to case and emailed to architect.
Routing PW Sewer Rating10/10/2015 10/12/2015 PASS
DetailsJennifer Bruner
Routing PW Sewer Design10/10/2015 10/12/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - PUBLIC WORKS10/10/2015 10/12/2015 PASS
DetailsJennifer Bruner
1st work flow broke. Please route to all those in Public works who need to see it.
Plan resubmittals received  10/8/2015 DONE
DetailsCarl Westfall
Routing PW Drainage9/21/2015 9/21/2015 PASS
DetailsJason C. Taylor
Plan resubmittals requested  8/5/2015 DONE
Workflow in ePlanReview completed
Routing PW Drainage6/1/2015 8/5/2015 FAIL
DetailsJason C. Taylor
Route to Impact Fee Review7/25/20157/28/20157/28/2015 PASS
DetailsCindy M. Gould
1st review completed  7/25/2015 DONE
Routing - PLAN CHECK5/21/2015 7/25/2015 FAIL
DetailsCarl Westfall
Routing Off Site - STRUCTURAL5/21/2015 6/8/2015 FAIL
DetailsCarl Westfall
Jan Welch
Routing PW Sewer Design5/21/2015 6/4/2015 FAIL
DetailsKyle S. Rosenmeyer
Separate sewer review underway in Public Works.
Routing PW Drainage5/21/2015 6/1/2015  
DetailsBrian Murphy
Re-assigned to Jason Taylor
Routing - FIRE5/21/2015 6/1/2015 FAIL
DetailsScott Arellano
Emailed comments to architect and attached to plans.
Routing - MECHANICAL5/21/2015 6/1/2015 FAIL
DetailsTroy James
Routing - PLANNING Land Div5/21/2015 5/28/2015 PASS
DetailsDave Abo
Routing PW Sewer Rating5/21/2015 5/28/2015 PASS
DetailsBeverly Mountain
Routing PW Solid Waste5/21/2015 5/28/2015 PASS
DetailsMegan Durrell
Routing - PLUMBING5/21/2015 5/27/2015 FAIL
DetailsDaryl Spivey
Routing - Design Review5/21/2015 5/27/2015 PASS
DetailsJosh Wilson
DRH14-00349
Routing - Erosion and Sediment5/21/2015 5/26/2015 PASS
DetailsEvan Jenkins
(ACTIVITY CENTER)
Routing PW Street Lights5/21/2015 5/26/2015 PASS
DetailsMike D Hedge
Routing - Addressing5/21/2015 5/21/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/21/2015 5/21/2015 PASS
DetailsBeverly Mountain
Intake Approval  5/21/2015 PASS
Pending Assignment by TLW5/21/2015 5/21/2015 DONE
DetailsTim L. Woodard
Plan Reviewer's activity  5/20/2015 PASS
Plan intake approved
Intake Approval  5/15/2015 FAIL
Intake Approval  5/6/2015 FAIL
Application received  4/9/2015 DONE
Application submitted via PDS Online on Apr 9 2015 3:20PM