Permit Information
Permit NumberBLD15-01109
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7570 W SAXTON DR
Project NameThe Kensington Apartments FIRE
Customer NumberBLD15-01107 IN EPLAN
ePlanReview 
Description
(KENSINGTON APARTMENTS –FIREPLACE PAVILION) The fireplace pavilion does not have a fire sprinkler system. The drawings are filed under BLD15-01107 in ePlanReview. To construct a 258 square foot building (350 square foot projected roof area) to serve the occupants of an apartment complex. Work is to include 8” x 8” wood columns treated for ground contact, 24” concrete footings that extend 48” below grade for each column, a concrete slab on grade, an engineered wood roof truss systems, wood roof beams, wood roof sheathing, manufactured stone veneer, Hardie board siding, standing seam metal roofing used as siding, and roof shingles. The pavilion is open to the outside on all sides and is not conditioned. A gas fireplace will be constructed below the roof and is required to comply as a radiant heating system. Special Inspection is required for soils and concrete. The design for the roof trusses is a deferred submittal item. Although not covered by permit, the playground equipment and surrounding area is required to be accessible to the disabled by 2012 IBC Section 1109.15.2 and ICC A117.1-2009 Section 1108. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  1/24/2018 DONE
DetailsChristina Prado
Per approved inspections
BLD-Final1/19/20181/22/20181/22/2018APASS
DetailsTony Young
Ed Phone #: ###-####
Issue PAID IN FULL permit  1/19/2016 DONE
DetailsChristina Prado
Print Occupancy Form  1/19/2016 DONE
DetailsChristina Prado
Extend Review Timeline  12/22/2015 DONE
1st 180 day extension granted by Jason B
Routing Off Site - STRUCTURAL11/12/2015 11/20/2015 PASS
DetailsCarl Westfall
Jan Welch
Routing - PLAN CHECK11/11/2015 11/20/2015 PASS
DetailsCarl Westfall
Plan Reviewer's activity  11/20/2015 DONE
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  11/20/2015 DONE
Permit Ready to Issue  11/20/2015 DONE
all requirments met
Pending Assignment by TLW5/21/2015 11/20/2015 PASS
DetailsTim L. Woodard
Plan assigned to (CJW)5/21/2015 11/20/2015 PASS
DetailsCarl Westfall
FIREPLACE PAVILION
Routing - PLUMBING11/12/2015 11/19/2015 PASS
DetailsBill VanDegrift
Routing - MECHANICAL11/12/2015 11/17/2015 PASS
DetailsTroy James
Plan resubmittals received  11/11/2015 DONE
DetailsCarl Westfall
Plan resubmittals requested  10/28/2015 DONE
Routing Off Site - STRUCTURAL10/10/2015 10/27/2015 FAIL
DetailsCarl Westfall
Jan Welch
Routing - MECHANICAL10/10/2015 10/23/2015 PASS
DetailsTroy James
Routing - PLUMBING10/10/2015 10/22/2015 FAIL
DetailsDaryl Spivey
see bld15-01107
Routing - PLAN CHECK10/20/2015 10/21/2015 PASS
DetailsCarl Westfall
Van accessible parking space shown. Item #2 resolved.
Routing - PLANNING10/10/2015 10/20/2015 PASS
DetailsDavid Moser
Routing PW Drainage10/10/2015 10/20/2015 PASS
DetailsJason C. Taylor
Project approved under GRD15-00018 ODI 3398. JCT
Routing - PLAN CHECK10/8/2015 10/16/2015 FAIL
DetailsCarl Westfall
Item #2 not resolved
Routing - Design Review10/10/2015 10/13/2015 PASS
DetailsJosh Wilson
Routing - FIRE10/10/2015 10/12/2015 PASS
DetailsKatie Marron
Plans were reviewed for fire department access and water supply. No comments required.
Routing PW Sewer Rating10/10/2015 10/12/2015 PASS
DetailsJennifer Bruner
Routing PW Sewer Design10/10/2015 10/12/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - PUBLIC WORKS10/10/2015 10/12/2015 PASS
DetailsJennifer Bruner
The 1st work flow broke. Please route this to all those in Public Works who need to see it.
Plan resubmittals received  10/8/2015 DONE
DetailsCarl Westfall
Routing PW Drainage9/21/2015 9/21/2015 PASS
DetailsJason C. Taylor
Routing PW Drainage6/1/2015 8/5/2015 FAIL
DetailsJason C. Taylor
Plan resubmittals requested  8/5/2015 DONE
Workflow in ePlanReview completed
Route to Impact Fee Review7/29/20158/1/20157/30/2015 PASS
DetailsCindy M. Gould
1st review completed  7/29/2015 DONE
Routing - PLAN CHECK5/21/2015 7/29/2015 FAIL
DetailsCarl Westfall
Revised drawings required
Routing Off Site - STRUCTURAL5/21/2015 6/8/2015 FAIL
DetailsCarl Westfall
Routing PW Sewer Design5/21/2015 6/4/2015 FAIL
DetailsKyle S. Rosenmeyer
Separate sewer review underway in Public Works.
Routing PW Drainage5/21/2015 6/1/2015  
DetailsBrian Murphy
Re-assigned to Jason Taylor
Routing - FIRE5/21/2015 6/1/2015 PASS
DetailsScott Arellano
No comments
Routing PW Sewer Rating5/21/2015 5/28/2015 PASS
DetailsBeverly Mountain
Routing PW Solid Waste5/21/2015 5/28/2015 PASS
DetailsMegan Durrell
Routing - PLANNING Land Div5/21/2015 5/28/2015 PASS
DetailsDave Abo
Routing - Design Review5/21/2015 5/27/2015 PASS
Details
DRH14-00349
Routing - Erosion and Sediment5/21/2015 5/26/2015 PASS
DetailsEvan Jenkins
(FIREPLACE PAVILION)
Routing PW Street Lights5/21/2015 5/26/2015 PASS
DetailsMike D Hedge
Street lights to be addressed in submittal #2
Intake Approval  5/21/2015 PASS
Routing - Addressing5/21/2015 5/21/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/21/2015 5/21/2015 PASS
DetailsBeverly Mountain
Plan Reviewer's activity  5/20/2015 PASS
Plan intake approved
Intake Approval  5/15/2015 FAIL
Intake Approval  5/6/2015 FAIL
Application received  4/9/2015 DONE
Application submitted via PDS Online on Apr 9 2015 3:20PM