Permit Information
Permit NumberBLD15-01112
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7568 W SAXTON DR
Project NameThe Kensington Apartments O
Customer NumberBLD15-01107 IN EPLAN
ePlanReview 
Description
(THE KENSINGTON APARTMENTS - BUILDING O) The drawings are filed under BLD15-01107 in ePlanReview. The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 19,568 square foot four story apartment building (5,243 sq. ft. 1st story with four 2.c units, 5,192 sq. ft. 2nd story with four 2.c units, 5,192 sq. ft. 3rd story with four 2.c units, and 3,941 sq. ft. 4th story with four 1.d units). All ground floor units are required to comply as Type B dwelling units. No elevator is provided in this building. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, 1-hr dwelling unit separations, .5-hr minimum fire-resistance-rated corridors with 20 minute smoke- and draft-control doors, exterior exit stairways fire rated like the corridor, steel stairways with concrete treads, interior nonbearing walls, millwork, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  3/28/2017 DONE
DetailsChristina Prado
BLD-Final3/22/20173/23/20173/23/2017PPASS
DetailsTony Young
Ed Phone #: ###-####
FIRE-Final Inspection3/22/20173/23/20173/23/2017APASS
DetailsJim Page
Final life fire safety inspection passed/complete
BLD-Aging Inspection3/8/20173/8/20173/10/2017 PASS
DetailsTony Young
Temporary Occupancy1/30/20174/30/20171/30/2017 DONE
DetailsChristina Prado
Print Occupancy Form  1/30/2017 DONE
BLD-Aging Inspection1/6/20171/6/20171/11/2017 PEND
DetailsTony Young
PubWorks Occupancy Approval12/28/201612/28/201612/28/2016 DONE
DetailsTiffany Lowery
Print Occupancy Form  11/18/2016 DONE
BLD-Final8/29/20168/30/20168/31/2016APEND
DetailsTony Young
Ed Phone #: ###-####
BLD-Final8/26/20168/29/20168/29/2016ANR
DetailsTony Young
Ed Phone #: ###-####,,still need stairs reworked
BLD-Final8/25/20168/26/20168/26/2016APEND
DetailsTony Young
Ed Phone #: ###-####
BLD-Final8/24/20168/25/20168/25/2016APART
DetailsTony Young
Ed Phone #: ###-####,, temp occ ok,, need door labels, guard rail permanent fix, stair permanent fix rise and run, and final letter of ok on all special inspections, and full sign off from fire sprinkler
BLD-Final8/24/20168/24/20168/24/2016PDEFR
DetailsTony Young
Ed Phone #: ###-####,, to AM
BLD-Framing/Rough-in8/23/20168/24/20168/24/2016ADONE
DetailsTony Young
Ed Phone #: ###-####,, walk through on final... frame has been done
FIRE-Final Inspection8/23/20168/24/20168/24/2016APART
DetailsJim Page
Partial final life fire safety inspection passed/complete, fire sprinkler inspection is partially complete, reference to activites under FIR16-00028 for fire sprinkler comments. Dry standpipe inspection for this building is complete. Partial final inspection complete for fire alarm system, reference activities under FIR16-00400 for fire alarm comments. A partial final for life fire safety inspection is complete, monitored heat trace associated with fire alarm and fire sprinkler system needs to be installed and inspected/passed for life fire safety to be finaled. Fire extinguishers are in place with current inspection tags. A 60 day TCO is authorized per conversation with Scott Arellano.
Zoning Approval8/23/20168/23/20168/23/2016 PASS
DetailsJosh Wilson
FIRE-Final Inspection8/18/20168/19/20168/19/2016AFAIL
DetailsJim Page
Need to have fire sprinkler and fire alarm permits finaled, apartments need to have suite identification installed.
BLD-Final8/18/20168/19/20168/19/2016PNR
DetailsJim Sly
Ed Phone #: ###-####
Need ACHD Zoning Etc........
BLD-Footing8/16/20168/17/20168/17/2016APART
DetailsJim Sly
Ed Phone #: ###-####
2 light pole footings.....OK.
BLD-Framing/Rough-in6/2/20166/3/20166/3/2016APART
DetailsTony Young
3rd floor framing - Ed Phone #: ###-####,, insulation ok also on 3rd floor
BLD-Framing/Rough-in6/2/20166/2/20166/3/2016PPART
DetailsTony Young
3rd floor framing - Ed Phone #: ###-####,, 3rd floor ok to cover
BLD-Framing/Rough-in6/1/20166/2/20166/2/2016ANR
DetailsTony Young
3rd floor framing - Ed Phone #: ###-####,, needs mech 1st
BLD-Energy code compliance5/31/20166/1/20166/1/2016APART
DetailsTony Young
2nd & 3rd floor insulation - Ed Phone #: ###-####,, 2nd floor ok to cover,, need mech on 3rd,, then ok
BLD-Framing/Rough-in5/31/20166/1/20166/1/2016APART
DetailsTony Young
3rd floor framing - Ed Phone #: ###-####,, needs mechanical 1st
BLD-Framing/Rough-in5/31/20165/31/20165/31/2016PPART
DetailsJim Sly
Ed-2nd floor blg 0 Phone #: ###-####
Fir downs and insulation 2nd floor......OK to rock pending all trades....OK
BLD-Energy code compliance5/26/20165/27/20165/27/2016PPASS
DetailsTony Young
Ed// 1st floor Phone #: ###-####
BLD-Framing/Rough-in5/26/20165/27/20165/27/2016PPASS
DetailsTony Young
Ed// 1st floor Phone #: ###-####
BLD-Energy code compliance5/25/20165/26/20165/26/2016APART
DetailsTony Young
Ed// 1st floor Phone #: ###-####,, work in progress,, need mech
BLD-Framing/Rough-in5/25/20165/26/20165/26/2016APART
DetailsTony Young
Ed// 1st floor Phone #: ###-####,, ok pending mechanical
BLD-Energy code compliance5/6/20165/9/20165/9/2016APART
DetailsTony Young
Insulation // Ed Phone #: ###-####,, ok to cover drop down areas,, need fire sprinkler pass on other areas
BLD-Framing/Rough-in5/2/20165/3/20165/3/2016PPASS
DetailsJim Sly
Ed Phone #: ###-####
BLD-Framing/Rough-in4/28/20164/29/20164/29/2016APART
DetailsTony Young
Prior to insulation - Ed Phone #: ###-####,, ok to cover areas for furr downs
BLD-Conference4/29/20164/29/20164/29/2016PPART
DetailsJim Sly
Prior to insulation - Ed Phone #: ###-####
Met with superintendant, framer, fire caulker and Tony Young .....Walk thru.....1st of several bldgs.
BLD-Wall Bracing3/25/20163/25/20163/25/2016PPASS
DetailsTony Young
building 0,, exterior ok after some fixes
BLD-Energy code compliance3/17/20163/18/20163/18/2016APASS
DetailsTony Young
Ed-interior insulation for plumbing walls Phone #: ###-####
BLD-Wall Bracing3/16/20163/17/20163/17/2016APART
DetailsTony Young
Ed-interior shear Phone #: ###-####,, plumbing walls ok to insulate
BLD-Other3/10/20163/11/20163/11/2016APASS
DetailsTony Young
Roof // Ed Phone #: ###-####,, roof nailing appears ok
BLD-Footing1/21/20161/21/20161/21/2016PPART
DetailsJim Sly
Barry Phone #: ###-####
OK pending Geotek special inspection, tests and approvals.
BLD-Foundation1/7/20161/8/20161/8/2016APART
DetailsMike Jordan
Barry Phone #: ###-####. Work in progress. Pending special inspection.
BLD-Footing1/7/20161/8/20161/8/2016APART
DetailsMike Jordan
Barry Phone #: ###-####. Work in progress. Pending special inspection.
BLD-Footing11/25/201511/30/201511/30/2015APART
DetailsTony Young
Ed Phone #: ###-####,, pending special inspection
Issue PAID IN FULL permit  11/24/2015 DONE
Inspection Record Card- Bld  11/24/2015 DONE
OVERRIDE  11/20/2015  
Routing - PLAN CHECK11/11/2015 11/20/2015 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL11/12/2015 11/20/2015 PASS
DetailsCarl Westfall
Jan Welch
Plan Reviewer's activity  11/20/2015 DONE
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  11/20/2015 DONE
Permit Ready to Issue  11/20/2015 DONE
all requirments met
Plan assigned to (CJW)5/21/2015 11/20/2015 PASS
DetailsCarl Westfall
Building O (1st review done)
Routing - PLUMBING11/12/2015 11/19/2015 PASS
DetailsBill VanDegrift
Routing - MECHANICAL11/12/2015 11/17/2015 PASS
DetailsTroy James
Plan resubmittals received  11/11/2015 DONE
DetailsCarl Westfall
Plan resubmittals requested  10/28/2015 DONE
Routing Off Site - STRUCTURAL10/10/2015 10/27/2015 FAIL
DetailsCarl Westfall
Jan Welch
Routing - MECHANICAL10/10/2015 10/23/2015 PASS
DetailsTroy James
Routing - PLUMBING10/10/2015 10/22/2015 FAIL
DetailsDaryl Spivey
see bld15-01107
Routing PW Drainage10/10/2015 10/20/2015 PASS
DetailsJason C. Taylor
Project approved under GRD15-00018 ODI 3398. JCT
Routing - PLANNING10/10/2015 10/20/2015 PASS
DetailsDavid Moser
Routing - PLAN CHECK10/8/2015 10/16/2015 PASS
DetailsCarl Westfall
Drawings approved with redlines after the 2nd IBC plan review
Routing - Design Review10/10/2015 10/13/2015 PASS
DetailsJosh Wilson
Routing - FIRE10/10/2015 10/12/2015 FAIL
DetailsKatie Marron
Comments not adequately addressed. Report attached to case and emailed to architect.
Routing PW Sewer Rating10/10/2015 10/12/2015 PASS
DetailsJennifer Bruner
Routing PW Sewer Design10/10/2015 10/12/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - PUBLIC WORKS10/10/2015 10/12/2015 PASS
DetailsJennifer Bruner
The 1st work flow broke. Please route this to all those in Public Works who need to see it.
Plan resubmittals received  10/8/2015 DONE
Routing PW Drainage9/21/2015 9/21/2015 PASS
DetailsJason C. Taylor
Routing PW Drainage6/1/2015 8/5/2015 FAIL
DetailsJason C. Taylor
Plan resubmittals requested  8/5/2015 DONE
Workflow in ePlanReview completed
Route to Impact Fee Review6/20/20156/23/20156/25/2015 PASS
DetailsCindy M. Gould
1st review completed  6/20/2015 DONE
Routing - PLAN CHECK5/21/2015 6/20/2015 FAIL
DetailsCarl Westfall
Revised drawings required.
Routing Off Site - STRUCTURAL5/21/2015 6/8/2015 FAIL
DetailsCarl Westfall
Jan Welch
Routing PW Sewer Design5/21/2015 6/4/2015 FAIL
DetailsKyle S. Rosenmeyer
Separate sewer review underway in Public Works.
Routing - FIRE5/21/2015 6/2/2015 FAIL
DetailsScott Arellano
Emailed comments to architect and attached to plans
Routing PW Drainage5/21/2015 6/1/2015  
DetailsBrian Murphy
Re-assigned to Jason Taylor
Routing - MECHANICAL5/21/2015 6/1/2015 FAIL
DetailsTroy James
Routing - PLANNING Land Div5/21/2015 5/28/2015 PASS
DetailsDave Abo
Routing PW Sewer Rating5/21/2015 5/28/2015 PASS
DetailsBeverly Mountain
Routing PW Solid Waste5/21/2015 5/28/2015 PASS
DetailsMegan Durrell
Routing - PLUMBING5/21/2015 5/27/2015 FAIL
DetailsDaryl Spivey
Routing - Design Review5/21/2015 5/27/2015 PASS
DetailsJosh Wilson
DRH14-00349
Routing PW Street Lights5/21/2015 5/26/2015 PASS
DetailsMike D Hedge
Street lights to be addressed in submittal #2
Routing - Erosion and Sediment5/21/2015 5/26/2015 PASS
DetailsEvan Jenkins
(APARTMENT BUILDING O)
Routing - Addressing5/21/2015 5/21/2015 PASS
DetailsEmily Dixon
Address corrected to 7568 W Saxton Dr.
Routing - PUBLIC WORKS5/21/2015 5/21/2015 PASS
DetailsBeverly Mountain
Intake Approval  5/21/2015 PASS
Pending Assignment by TLW5/21/2015 5/21/2015 DONE
DetailsTim L. Woodard
Plan Reviewer's activity  5/20/2015 PASS
Plan intake approved
Intake Approval  5/15/2015 FAIL
Intake Approval  5/6/2015 FAIL
Application received  4/9/2015 DONE
Application submitted via PDS Online on Apr 9 2015 3:20PM
First Notice 4/7/2017