Permit Information
Permit NumberBLD15-01121
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7364 W SAXTON DR
Project NameThe Kensington Apartments D
Customer NumberBLD15-01118 - BLD15-01137
ePlanReview 
Description
(THE KENSINGTON APARTMENTS - BUILDING D) The drawings are filed under BLD15-01118 in ePlanReview. The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 44,518 square foot four story apartment building (11,390 sq. ft. 1st story with two 3.c units, two 3.b units, three 2.c units, and one 2.g unit, 11,390 sq. ft. 2nd story with four 3.b units, three 2.c units, and one 2.g unit, 11,390 sq. ft. 3rd story with four 3.b units, three 2.c units, and one 2.g unit, 11,390 sq. ft. 4th story with four 2.d units, three 2.c units, and one 2.g unit) An elevator is provided in this building that serves all stories. All units in this building are required to comply as Type B dwelling units. Of those Type B dwelling units, 2 will also comply as Type A units. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, a 2-hr elevator shaft, 1-hr dwelling unit separations, .5-hr minimum fire-resistance-rated corridors with 20 minute smoke- and draft-control doors, exterior exit stairways fire rated like the corridors, steel stairways with concrete treads, interior nonbearing walls, millwork, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval1/8/20181/8/20181/8/2018 DONE
DetailsTiffany Lowery
Zoning Approval1/8/20181/8/20181/8/2018 PASS
DetailsKatelyn Menuge
Permanent Occupancy  1/8/2018 DONE
DetailsChristina Prado
FIRE-Final Inspection1/4/20181/5/20181/5/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.
FIRE-Final Inspection1/3/20181/4/20181/4/2018AFAIL
DetailsJim Page
Modifications required for audio/visual devices on fire alarm system in apartment restrooms that are ADA compliant, when fire alarm modifications are complete then permit can be finaled for life fire safety.
BLD-Final1/3/20181/4/20181/4/2018APASS
DetailsJim Sly
Ed Phone #: ###-####
Structural final.......OK.
BLD-Final1/3/20181/3/20181/3/2018PNR
DetailsTony Young
Ed Phone #: ###-####
BLD-Energy code compliance10/23/201710/24/201710/24/2017APASS
DetailsTony Young
1st floor // Ed Phone #: ###-####,, ok pending trades
BLD-Wall cover10/23/201710/23/201710/24/2017PPART
DetailsTony Young
1st floor // Ed Phone #: ###-####
BLD-Conference10/20/201710/20/201710/21/2017PDONE
DetailsTony Young
1st floor Fire Clucking- ED Phone #: ###-####
BLD-Framing/Rough-in10/19/201710/19/201710/20/2017PPASS
DetailsTony Young
1st floor- ED Phone #: ###-####
BLD-Other10/19/201710/19/201710/20/2017PPART
DetailsTony Young
1st floor Fire Clucking- ED Phone #: ###-####,,, needs to fix a couple spot
BLD-Energy code compliance10/3/201710/4/201710/4/2017APASS
DetailsMike Jordan
Ed Phone #: ###-####. 2nd. floor, eight units ok.
BLD-Other10/2/201710/3/201710/3/2017APART
DetailsJim Sly
Ed-fire caulking Phone #: ###-####
8 Units
BLD-Framing/Rough-in10/2/201710/3/201710/3/2017APART
DetailsJim Sly
Ed Phone #: ###-####
8 units
BLD-Energy code compliance9/6/20179/7/20179/8/2017PPASS
DetailsTony Young
3rd floor... insulation // Ed Phone #: ###-####
BLD-Framing/Rough-in9/6/20179/6/20179/6/2017PPASS
DetailsTony Young
3rd floor // Ed Phone #: ###-####
BLD-Other9/6/20179/6/20179/6/2017PPASS
DetailsTony Young
3rd floor... fire colcking // Ed Phone #: ###-####
BLD-Energy code compliance9/6/20179/6/20179/6/2017PPART
DetailsTony Young
3rd floor... insulation // Ed Phone #: ###-####,, south side units ok
BLD-Framing/Rough-in8/25/20178/28/20178/28/2017APART
DetailsTony Young
Floors 1 and 2 // Ed Phone #: ###-####,, prerock areas ok
BLD-Energy code compliance8/24/20178/25/20178/25/2017PNR
DetailsTony Young
Floors 1 and 2 // Ed Phone #: ###-####
BLD-Energy code compliance8/23/20178/23/20178/23/2017PPART
DetailsTony Young
3rd floor // Ed Phone #: ###-####,, ceiling pre-rock ok
BLD-Framing/Rough-in8/21/20178/21/20178/21/2017PPART
DetailsBrandon Shaw
Framing and fire caulkings on 1st floor
OK to insulate
BLD-Other8/21/20178/21/20178/21/2017PPART
DetailsBrandon Shaw
Framing and fire caulkings on 1st floor
BLD-Framing/Rough-in8/18/20178/18/20178/18/2017PPASS
DetailsJim Sly
barry-framing and fire caulk-2nd and 3rd floor Phone #: ###-####
BLD-Framing/Rough-in8/15/20178/15/20178/15/2017PPART
DetailsTony Young
Berry Phone #: ###-#### ,, insulation behind tubs/shower areas ok after fireblocking plate lines
BLD-Energy code compliance8/14/20178/15/20178/15/2017APASS
DetailsTony Young
Ed 4th floor insulation Phone #: ###-####
BLD-Energy code compliance8/14/20178/14/20178/14/2017PNR
DetailsTony Young
Ed 4th floor insulation Phone #: ###-####,, needs sprinkler passed 1st
BLD-Energy code compliance8/11/20178/14/20178/14/2017ANR
DetailsTony Young
Ed Phone #: ###-####, 4th floor
BLD-Framing/Rough-in8/11/20178/11/20178/12/2017PDEFR
DetailsTony Young
Ed Phone #: ###-####
BLD-Other8/11/20178/11/20178/12/2017PDEFR
DetailsTony Young
Ed Phone #: ###-####
BLD-Wall Bracing7/31/20177/31/20178/1/2017PPASS
DetailsTony Young
Elevator shear // Ed Phone #: ###-####
BLD-Energy code compliance6/8/20176/8/20176/9/2017PPASS
DetailsTony Young
Ed-plumbing wall insulation Phone #: ###-####
BLD-Wall Bracing6/2/20176/5/20176/5/2017APART
DetailsTony Young
Ed Phone #: ###-####,, sill plates on interior for pre rock
BLD-Wall Bracing6/1/20176/1/20176/1/2017PPART
DetailsTony Young
exterior shear - Ed Phone #: ###-####, exterior only,, not breeze ways, work in progress,, ok after re-doing some areas
BLD-Footing12/29/201612/30/201612/30/2016APART
DetailsJim Storey
Ed Phone #: ###-#### ok w si
BLD-Footing12/27/201612/28/201612/28/2016APART
DetailsTony Young
Ed Phone #: ###-####, slab work,, ok pending trades,, special inspection results,, cold weather provisions in effect
BLD-Footing12/20/201612/21/201612/21/2016APEND
DetailsTony Young
Ed Phone #: ###-####,, special inspection
BLD-Footing12/7/201612/8/201612/8/2016APASS
DetailsJim Sly
Ed Phone #: ###-####
OK pending Geotech special inspections, tests and approvals.
BLD-Footing10/13/201610/14/201610/14/2016APEND
DetailsTony Young
Ed Phone #: ###-####,, special inspection reports
Routing - PUBLIC WORKS10/10/2016 10/10/2016 PASS
DetailsRachael Beierle
Issue PAID IN FULL permit  5/20/2016 DONE
Print Occupancy Form  5/20/2016 DONE
Print Occupancy Form  5/20/2016 DONE
Place hold on job4/8/2016 5/20/2016 DONE
DetailsCarlos Velazquez
Multiple permits under one ePlan case -
DO NOT ISSUE without the following permits: BLD15-01121 thru BLD15-01128, BLD15-01130, BLD15-01335 thru BLD15-01137, BLD16-00539 & BLD16-00540
Telephone call  4/22/2016 DONE
Left a message for Royce that these five permits are going to be 20 days their expiration date and that he would need to send in a request for a 180 day extension because normally if we don't hear back from anyone we expire the permits 20 days after the expiration date. Left the permit numbers and Jason B's email.
Extend Review Timeline  4/22/2016 DONE
1st 180 days approved by Jason B. See documents
Telephone call  4/20/2016 DONE
Spoke with Brenda and she informed me that James is the project manager and is acutally here in Boise, but they didn't have his new cell phone in the system so she transferred me to Royce, his assistant. Left Royce a message stated that there are five permits for the Kennsington Apartments that are 17 days past their expiration date and they would need to send in a request for an extension if they are not ready to pick them up. Asked Royce to give me a call as well so that I know he recieved my message and understood what I was saying
Telephone call  4/14/2016 DONE
Left a message for James informing him that some of the permits were picked up except for 5 of them. Informed him that, that is ok but he would need to send in a request for an extension to Jason B since they are past their expiration date.
Telephone call  4/11/2016 DONE
Left a message for James, with Bach Homes, informing him that the Kensington Apartment permits are 8 days past their expiration date and recommended he request another extension for 180 days. Also informed him that if he does request the extension it will be the final one that can be given.
Permit Ready to Issue  4/8/2016 DONE
DetailsChristina Prado
All requirements met
PLANS/APPL TAKEN TO FRONT DESK  4/7/2016 DONE
Routing - PLAN CHECK3/31/2016 4/7/2016 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL4/1/2016 4/7/2016 PASS
DetailsCarl Westfall
Dave Haugland
Plan assigned to (CJW)7/20/2015 4/7/2016 PASS
DetailsCarl Westfall
Building D - Phase 2
Routing PW Drainage4/1/2016 4/5/2016 PASS
DetailsJason C. Taylor
Routing - FIRE4/1/2016 4/5/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Routing PW Sewer Design4/1/2016 4/5/2016 PASS
DetailsKyle S. Rosenmeyer
Routing PW Street Lights4/1/2016 4/5/2016 PASS
DetailsTom Marshall
Routing PW Solid Waste4/1/2016 4/4/2016 PASS
DetailsMegan Durrell
Routing - PUBLIC WORKS4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing PW Sewer Rating4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing - Addressing4/1/2016 4/1/2016 PASS
DetailsLaura Hunter
Plan resubmittals received  3/31/2016 DONE
Plan resubmittals requested  3/9/2016 DONE
Routing Off Site - STRUCTURAL2/22/2016 3/8/2016 FAIL
DetailsCarl Westfall
Dave Haugland
Routing - PLANNING Land Div2/22/2016 3/1/2016 PASS
DetailsTodd Tucker
Routing - PLUMBING2/22/2016 3/1/2016 PASS
DetailsBill VanDegrift
Routing PW Solid Waste2/22/2016 2/29/2016 PASS
DetailsMegan Durrell
Routing - PLAN CHECK2/17/2016 2/25/2016 FAIL
DetailsCarl Westfall
Routing PW Sewer Design2/22/2016 2/25/2016 PASS
DetailsKyle S. Rosenmeyer
Routing - PUBLIC WORKS2/22/2016 2/24/2016 PASS
DetailsJennifer Bruner
Routing - FIRE2/22/2016 2/24/2016 FAIL
DetailsKatie Marron
Attached updated report to case. Contacted applicant.
Routing - Addressing2/22/2016 2/24/2016 PASS
DetailsLaura Hunter
Routing - Design Review2/22/2016 2/24/2016 PASS
DetailsJosh Wilson
OK PER MODIFICATION DRH15-00313 JGW 2-24-16
Routing PW Sewer Rating2/22/2016 2/24/2016 PASS
DetailsJennifer Bruner
Plan resubmittals received  2/17/2016 DONE
Routing - MECHANICAL2/22/2016 2/15/2016 PASS
DetailsTroy James
Extend Review Timeline  12/17/2015 DONE
DetailsCarl Westfall
Request approved by Jason Blais, Building Official. See attached document under BLD15-01118.
Routing PW Drainage9/21/2015 9/21/2015 PASS
DetailsJason C. Taylor
Route to Impact Fee Review8/27/20158/30/20158/28/2015 PASS
DetailsCindy M. Gould
1st review completed  8/27/2015 DONE
Plan resubmittals requested  8/27/2015 DONE
Routing - PLAN CHECK7/22/2015 8/26/2015 FAIL
DetailsCarl Westfall
Revised drawings required
Routing Off Site - STRUCTURAL7/22/2015 8/19/2015 FAIL
DetailsCarl Westfall
Dave Haugland
Routing PW Drainage7/23/2015 8/6/2015 FAIL
DetailsJason C. Taylor
Routing PW Sewer Design7/23/2015 8/6/2015 PASS
DetailsKyle S. Rosenmeyer
Sewer approved under separate Public Works project.
Routing - PLUMBING7/22/2015 8/5/2015 FAIL
DetailsDaryl Spivey
Routing PW Sewer Rating7/23/2015 7/27/2015 PASS
DetailsJennifer Bruner
Routing - FIRE7/22/20157/22/20157/23/2015 FAIL
DetailsKatie Marron
Comments attached to case and emailed to architect.
Routing - Design Review7/22/2015 7/23/2015 PASS
DetailsJosh Wilson
Routing - MECHANICAL7/22/2015 7/23/2015 PASS
DetailsTroy James
Routing PW Solid Waste7/23/2015 7/23/2015 PASS
DetailsMegan Durrell
Routing - PLANNING Land Div7/22/2015 7/23/2015 PASS
DetailsDave Abo
Routing - Addressing7/22/2015 7/23/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS7/22/2015 7/23/2015 PASS
DetailsJennifer Bruner
Pending Assignment by TLW7/22/2015 7/22/2015 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment7/22/2015 7/22/2015 PASS
DetailsAndy J. Long
Intake Approval  7/20/2015 PASS
Intake Approval  6/25/2015 FAIL
DetailsCarl Westfall
(6-23-15) Drawings submitted in ePlanReview.

(6-25-15) Please refer to the circled items on the plan intake checklist and resolve them as noted.
Application received  4/9/2015 DONE
Application submitted via PDS Online on Apr 9 2015 3:20PM
Routing PW Drainage2/22/2016 2/16/2015 FAIL
DetailsJason C. Taylor
First Notice 1/18/2018   
Routing PW Solid Waste10/10/2016    
DetailsEvan Carpenter