PubWorks Occupancy Approval | 11/30/2017 | 11/30/2017 | 11/30/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 11/30/2017 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/29/2017 | | DONE |
Christina Prado
|
|
|
Needs PW Final and CO issued, finaled by mistake on 11/16
|
Zoning Approval | 11/21/2017 | 11/21/2017 | 11/21/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 11/15/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Brandon Shaw
|
|
|
Ed Phone #: ###-####
|
DOC - Permit Finaled | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by the fire sprinkler riser room, permanent addressing will be installed when received. Final life fire safety inspection passed/complete.
|
BLD-Framing/Rough-in | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | PASS |
Tony Young
|
|
|
for garages // Ed ###-####,, garages ok now
|
BLD-Energy code compliance | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, upper floor ok to cover,, garage needs trades, and other work 1st
|
BLD-Framing/Rough-in | 9/20/2017 | 9/21/2017 | 9/21/2017 | A | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####,, ok to insulate
|
BLD-Framing/Rough-in | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, working on the seal package,, other minor fixes needed,, walk through with Ed
|
Print Occupancy Form | | | 4/17/2017 | | DONE |
|
|
|
|
BLD-Wall Bracing | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####,, exterior ok
|
BLD-Aging Inspection | 10/7/2016 | 10/7/2016 | 10/10/2016 | | PASS |
Tony Young
|
|
|
|
Routing - PUBLIC WORKS | 10/10/2016 | | 10/10/2016 | | PASS |
Rachael Beierle
|
|
|
|
BLD-Foundation | 6/2/2016 | 6/2/2016 | 6/3/2016 | P | PEND |
Tony Young
|
|
|
Ed-stem wall Phone #: ###-####,, SI report pend
|
BLD-Footing | 5/25/2016 | 5/26/2016 | 5/26/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, SI on site
|
Issue PAID IN FULL permit | | | 4/13/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/11/2016 | | DONE |
|
|
|
Left a message for James, with Bach Homes, informing him that the Kensington Apartment permits are 8 days past their expiration date and recommended he request another extension for 180 days. Also informed him that if he does request the extension it will be the final one that can be given.
|
Permit Ready to Issue | | | 4/8/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/31/2016 | | 4/7/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 4/1/2016 | | 4/7/2016 | | PASS |
Carl Westfall
|
|
|
Dave Haugland
|
Plan assigned to (CJW) | 7/20/2015 | | 4/7/2016 | | PASS |
Carl Westfall
|
|
|
Building F - Phase 2
|
Routing PW Drainage | 4/1/2016 | | 4/5/2016 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - FIRE | 4/1/2016 | | 4/5/2016 | | PASS |
Katie Marron
|
|
|
No change to previous approval
|
Routing PW Sewer Design | 4/1/2016 | | 4/5/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Street Lights | 4/1/2016 | | 4/5/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 4/1/2016 | | 4/4/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing - PUBLIC WORKS | 4/1/2016 | | 4/1/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Sewer Rating | 4/1/2016 | | 4/1/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 4/1/2016 | | 4/1/2016 | | PASS |
Laura Hunter
|
|
|
|
Plan resubmittals received | | | 3/31/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/9/2016 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/22/2016 | | 3/8/2016 | | FAIL |
Carl Westfall
|
|
|
Dave Haugland
|
Routing - PLANNING Land Div | 2/22/2016 | | 3/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLUMBING | 2/22/2016 | | 3/1/2016 | | PASS |
Bill VanDegrift
|
|
|
|
Routing PW Solid Waste | 2/22/2016 | | 2/29/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Drainage | 2/22/2016 | | 2/26/2016 | | FAIL |
Jason C. Taylor
|
|
|
|
Routing - PLAN CHECK | 2/17/2016 | | 2/25/2016 | | FAIL |
Carl Westfall
|
|
|
|
Routing PW Sewer Design | 2/22/2016 | | 2/25/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2016 | | 2/24/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - FIRE | 2/22/2016 | | 2/24/2016 | | PASS |
Katie Marron
|
|
|
No change from previous appoval.
|
Routing - Addressing | 2/22/2016 | | 2/24/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 2/22/2016 | | 2/24/2016 | | PASS |
Josh Wilson
|
|
|
OK PER MODIFICATION DRH15-00313 JGW 2-24-16
|
Routing PW Sewer Rating | 2/22/2016 | | 2/24/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plan resubmittals received | | | 2/17/2016 | | DONE |
|
|
|
|
Routing - MECHANICAL | 2/22/2016 | | 2/15/2016 | | PASS |
Troy James
|
|
|
|
Extend Review Timeline | | | 12/17/2015 | | DONE |
Carl Westfall
|
|
|
Request approved by Jason Blais, Building Official. See attached document under BLD15-01118.
|
Routing PW Drainage | 9/21/2015 | | 9/21/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Route to Impact Fee Review | 8/27/2015 | 8/30/2015 | 8/28/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 8/27/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 8/27/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/22/2015 | | 8/26/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing Off Site - STRUCTURAL | 7/22/2015 | | 8/19/2015 | | FAIL |
Carl Westfall
|
|
|
Dave Haugland
|
Routing PW Drainage | 7/23/2015 | | 8/6/2015 | | FAIL |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Design | 7/23/2015 | | 8/6/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Sewer approved under separate Public Works project.
|
Routing - PLUMBING | 7/22/2015 | | 8/5/2015 | | FAIL |
Daryl Spivey
|
|
|
|
Routing PW Sewer Rating | 7/23/2015 | | 7/27/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - FIRE | 7/22/2015 | 7/22/2015 | 7/24/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Addressing | 7/22/2015 | | 7/24/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 7/22/2015 | | 7/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Design Review | 7/22/2015 | | 7/23/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Solid Waste | 7/23/2015 | | 7/23/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing - PLANNING Land Div | 7/22/2015 | | 7/23/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - MECHANICAL | 7/22/2015 | | 7/23/2015 | | PASS |
Troy James
|
|
|
|
Pending Assignment by TLW | 7/22/2015 | | 7/22/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 7/22/2015 | | 7/22/2015 | | PASS |
Andy J. Long
|
|
|
|
Intake Approval | | | 7/20/2015 | | PASS |
|
|
|
|
Intake Approval | | | 6/25/2015 | | FAIL |
Carl Westfall
|
|
|
(6-23-15) Drawings submitted in ePlanReview.
(6-25-15) Please refer to the circled items on the plan intake checklist and resolve them as noted.
|
Application received | | | 4/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 9 2015 3:20PM
|
Routing PW Solid Waste | 10/10/2016 | | | | |
Evan Carpenter
|
|
|
|