StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7470 W SAXTON DR
Project NameThe Kensington Apartments G
Customer NumberBLD15-01118 - BLD15-01137
ePlanReview 
Description
(THE KENSINGTON APARTMENTS - BUILDING G) The drawings are filed under BLD15-01118 in ePlanReview. The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 39,150 square foot four story apartment building (10,031 sq. ft. 1st story with four 3.b units and four 1.c units, 10,031 sq. ft. 2nd story with four 3.b units and four 1.c units, 10,031 sq. ft. 3rd story with four 3.b units and four 1.c units, 9,057 sq. ft. 4th story with four 2.d units and four 1.c units). All ground floor units are required to comply as Type B dwelling units. No elevator is provided in this building. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, 1-hr dwelling unit separations, .5-hr minimum fire-resistance-rated corridors with 20 minute smoke- and draft-control doors, exterior exit stairways fire rated like the corridor, steel stairways with concrete treads, interior nonbearing walls, millwork, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval11/30/201711/30/201711/30/2017 DONE
DetailsTiffany Lowery
Permanent Occupancy  11/30/2017 DONE
DetailsChristina Prado
Zoning Approval11/21/201711/21/201711/21/2017 DONE
DetailsAndrea Tuning
BLD-Final8/7/20178/8/20178/8/2017APASS
DetailsTony Young
Ed Phone #: ###-####
FIRE-Final Inspection8/2/20178/2/20178/2/2017PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags, knox box is mounted next to fire sprinkler riser room, signage for fire sprinkler riser room will be installed afetr door is painted. Final life fire safety inspection passed/complete.
BLD-Energy code compliance6/6/20176/7/20176/7/2017APASS
DetailsTony Young
1st floor // Ed Phone #: ###-####
BLD-Framing/Rough-in6/2/20176/5/20176/5/2017APART
DetailsTony Young
First floor // Ed Phone #: ###-####,, drop areas ok
BLD-Energy code compliance5/22/20175/22/20175/23/2017PPASS
DetailsTony Young
2nd floor // Ed Phone #: ###-####
BLD-Other5/18/20175/19/20175/19/2017APART
DetailsTony Young
2nd // Ed Phone #: ###-####,, fire caulking done,, need one more layer of rock in the chase lid
BLD-Framing/Rough-in5/18/20175/19/20175/19/2017APART
DetailsTony Young
2nd floor - Ed Phone #: ###-####,, ok to insulate
BLD-Energy code compliance5/17/20175/18/20175/18/2017APASS
DetailsTony Young
Ed-3rd floor Phone #: ###-####
BLD-Footing5/17/20175/18/20175/18/2017APART
DetailsTony Young
Ed-play ground equipment Phone #: ###-####,, special inspector on site,, 4 pad footings
BLD-Energy code compliance5/16/20175/16/20175/16/2017PPART
DetailsTony Young
Ed-3rd floor Phone #: ###-####,, floor ceiling ok
BLD-Framing/Rough-in5/15/20175/16/20175/16/2017APART
DetailsTony Young
Ed-3rd floor Phone #: ###-####,, 3rd floor ok to insulate,, ceiling/floor ok to cover
BLD-Energy code compliance5/4/20175/5/20175/5/2017APART
DetailsTony Young
4th floor - Ed Phone #: ###-####,, 4th ok
BLD-Framing/Rough-in5/2/20175/3/20175/3/2017PPASS
DetailsTony Young
Ed-4th floor Phone #: ###-####,, ok to insulate
BLD-Other5/2/20175/3/20175/3/2017APEND
DetailsTony Young
Ed-tinting Phone #: ###-####-4th floor,, need fire sprinkler insp
BLD-Other4/26/20174/27/20174/27/2017PPASS
DetailsJim Sly
Fire caulking & framing level 3 - Ed Phone #: ###-####
BLD-Other4/26/20174/26/20174/26/2017PPART
DetailsTony Young
Fire caulking & framing level 2 and 3 - Ed Phone #: ###-####/// level 2 ok to insulate pre-rock areas,, 3 is not ready
BLD-Other4/25/20174/26/20174/26/2017ANR
DetailsTony Young
Fire caulking & framing level 2 and 3 - Ed Phone #: ###-####
BLD-Other4/24/20174/25/20174/25/2017APART
DetailsTony Young
Fire caulking & framing - Ed Phone #: ###-####,, 1st floor ok to insulate now
BLD-Other4/24/20174/24/20174/24/2017PNR
DetailsTony Young
Fire caulking & framing - Ed Phone #: ###-####,, walk through,, still missing some areas
BLD-Other4/21/20174/24/20174/24/2017ANR
DetailsTony Young
Fire caulking & framing - Ed Phone #: ###-####
BLD-Other4/21/20174/21/20174/24/2017PNR
DetailsTony Young
Fire caulking & framing - Ed Phone #: ###-####
BLD-Framing/Rough-in4/20/20174/21/20174/21/2017ANR
DetailsTony Young
Fire caulking & framing - Ed Phone #: ###-####,, pre rock areas,, not ready,, need to re-fire caulk properly
BLD-Framing/Rough-in4/20/20174/20/20174/20/2017PDEFR
DetailsTony Young
Fire caulking & framing - Ed Phone #: ###-####
BLD-Energy code compliance2/23/20172/24/20172/24/2017PCANC
DetailsTony Young
Ed//Shear inspection Phone #: ###-####
BLD-Wall Bracing2/23/20172/24/20172/24/2017ACANC
DetailsTony Young
Ed//Shear inspection Phone #: ###-####
BLD-Framing/Rough-in2/22/20172/23/20172/23/2017APART
DetailsTony Young
Ed//Shear inspection Phone #: ###-####,, exterior shear ok after nailing marked areas
BLD-Energy code compliance2/21/20172/22/20172/22/2017APASS
DetailsJim Sly
Insulation plumbing walls // Ed Phone #: ###-####
BLD-Wall Bracing2/21/20172/22/20172/22/2017APART
DetailsJim Sly
Shear // Ed Phone #: ###-####
INTERIOR
BLD-Other2/3/20172/6/20172/6/2017APART
DetailsTony Young
Roof nailing - Ed Phone #: ###-####,, no inspection made,, weather and 4 story issues,, ok pending self certification
Routing - PUBLIC WORKS10/10/2016 10/10/2016 PASS
DetailsRachael Beierle
Issue PAID IN FULL permit  5/20/2016 DONE
Print Occupancy Form  5/20/2016 DONE
Place hold on job4/8/2016 5/20/2016 DONE
DetailsCarlos Velazquez
Multiple permits under one ePlan case -
DO NOT ISSUE without the following permits: BLD15-01121 thru BLD15-01128, BLD15-01130, BLD15-01335 thru BLD15-01137, BLD16-00539 & BLD16-00540
Telephone call  4/22/2016 DONE
Left a message for Royce that these five permits are going to be 20 days their expiration date and that he would need to send in a request for a 180 day extension because normally if we don't hear back from anyone we expire the permits 20 days after the expiration date. Left the permit numbers and Jason B's email.
Extend Review Timeline  4/22/2016 DONE
1st 180 days approved by Jason B. See documents
Telephone call  4/20/2016 DONE
Spoke with Brenda and she informed me that James is the project manager and is acutally here in Boise, but they didn't have his new cell phone in the system so she transferred me to Royce, his assistant. Left Royce a message stated that there are five permits for the Kennsington Apartments that are 17 days past their expiration date and they would need to send in a request for an extension if they are not ready to pick them up. Asked Royce to give me a call as well so that I know he recieved my message and understood what I was saying
Telephone call  4/14/2016 DONE
Left a message for James informing him that some of the permits were picked up except for 5 of them. Informed him that, that is ok but he would need to send in a request for an extension to Jason B since they are past their expiration date.
Telephone call  4/11/2016 DONE
Left a message for James, with Bach Homes, informing him that the Kensington Apartment permits are 8 days past their expiration date and recommended he request another extension for 180 days. Also informed him that if he does request the extension it will be the final one that can be given.
Permit Ready to Issue  4/8/2016 DONE
DetailsChristina Prado
All requirements met
PLANS/APPL TAKEN TO FRONT DESK  4/7/2016 DONE
Routing - PLAN CHECK3/31/2016 4/7/2016 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL4/1/2016 4/7/2016 PASS
DetailsCarl Westfall
Dave Haugland
Plan assigned to (CJW)7/20/2015 4/7/2016 PASS
DetailsCarl Westfall
Building G - Phase 2
Routing PW Drainage4/1/2016 4/5/2016 PASS
DetailsJason C. Taylor
Routing - FIRE4/1/2016 4/5/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Routing PW Sewer Design4/1/2016 4/5/2016 PASS
DetailsKyle S. Rosenmeyer
Routing PW Street Lights4/1/2016 4/5/2016 PASS
DetailsTom Marshall
Routing PW Solid Waste4/1/2016 4/4/2016 PASS
DetailsMegan Durrell
Routing - PUBLIC WORKS4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing PW Sewer Rating4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing - Addressing4/1/2016 4/1/2016 PASS
DetailsLaura Hunter
Plan resubmittals received  3/31/2016 DONE
Plan resubmittals requested  3/9/2016 DONE
Routing Off Site - STRUCTURAL2/22/2016 3/8/2016 FAIL
DetailsCarl Westfall
Dave Haugland
Routing - PLANNING Land Div2/22/2016 3/1/2016 PASS
DetailsTodd Tucker
Routing - PLUMBING2/22/2016 3/1/2016 PASS
DetailsBill VanDegrift
Routing PW Solid Waste2/22/2016 2/29/2016 PASS
DetailsMegan Durrell
Routing PW Drainage2/22/2016 2/26/2016 FAIL
DetailsJason C. Taylor
Routing - PLAN CHECK2/17/2016 2/25/2016 FAIL
DetailsCarl Westfall
Routing - MECHANICAL2/22/2016 2/25/2016 PASS
DetailsTroy James
Routing PW Sewer Design2/22/2016 2/25/2016 PASS
DetailsKyle S. Rosenmeyer
Routing - PUBLIC WORKS2/22/2016 2/24/2016 PASS
DetailsJennifer Bruner
Routing - FIRE2/22/2016 2/24/2016 FAIL
DetailsKatie Marron
Attached updated plan review report to case. Emailed design professional.
Routing - Addressing2/22/2016 2/24/2016 PASS
DetailsLaura Hunter
Routing - Design Review2/22/2016 2/24/2016 PASS
DetailsJosh Wilson
Routing PW Sewer Rating2/22/2016 2/24/2016 PASS
DetailsJennifer Bruner
Plan resubmittals received  2/17/2016 DONE
Extend Review Timeline  12/17/2015 DONE
DetailsCarl Westfall
Request approved by Jason Blais, Building Official. See attached document under BLD15-01118.
Routing PW Drainage9/21/2015 9/21/2015 PASS
DetailsJason C. Taylor
Route to Impact Fee Review8/27/20158/30/20158/28/2015 PASS
DetailsCindy M. Gould
1st review completed  8/27/2015 DONE
Plan resubmittals requested  8/27/2015 DONE
Routing - PLAN CHECK7/22/2015 8/26/2015 FAIL
DetailsCarl Westfall
Revised drawings required
Routing Off Site - STRUCTURAL7/22/2015 8/19/2015 FAIL
DetailsCarl Westfall
Dave Haugland
Routing PW Drainage7/23/2015 8/6/2015 FAIL
DetailsJason C. Taylor
Routing PW Sewer Design7/23/2015 8/6/2015 PASS
DetailsKyle S. Rosenmeyer
Sewer approved under separate Public Works project.
Routing - PLUMBING7/22/2015 8/5/2015 FAIL
DetailsDaryl Spivey
Routing PW Sewer Rating7/23/2015 7/27/2015 PASS
DetailsJennifer Bruner
Routing - Addressing7/22/2015 7/24/2015 PASS
DetailsEmily Dixon
Routing - FIRE7/22/20157/22/20157/23/2015 FAIL
DetailsKatie Marron
Comments attached to case and emailed to architect.
Routing - Design Review7/22/2015 7/23/2015 PASS
DetailsJosh Wilson
Routing - PUBLIC WORKS7/22/2015 7/23/2015 PASS
DetailsJennifer Bruner
Routing PW Solid Waste7/23/2015 7/23/2015 PASS
DetailsMegan Durrell
Routing - PLANNING Land Div7/22/2015 7/23/2015 PASS
DetailsDave Abo
Routing - MECHANICAL7/22/2015 7/23/2015 PASS
DetailsTroy James
Pending Assignment by TLW7/22/2015 7/22/2015 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment7/22/2015 7/22/2015 PASS
Details
Intake Approval  7/20/2015 PASS
Intake Approval  6/25/2015 FAIL
DetailsCarl Westfall
(6-23-15) Drawings submitted in ePlanReview.

(6-25-15) Please refer to the circled items on the plan intake checklist and resolve them as noted.
Application received  4/9/2015 DONE
Application submitted via PDS Online on Apr 9 2015 3:20PM
First Notice 12/10/2017   
Routing PW Solid Waste10/10/2016    
DetailsEvan Carpenter