Permanent Occupancy | | | 8/10/2017 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval | 8/7/2017 | 8/7/2017 | 8/7/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH14-00349
|
BLD-Final | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####
|
PubWorks Occupancy Approval | 6/29/2017 | 6/29/2017 | 6/29/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, temp occ ok
|
FIRE-Final Inspection | 5/16/2017 | 5/16/2017 | 5/16/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place. Final life fire safety inspection passed/complete.
|
Print Occupancy Form | | | 4/17/2017 | | DONE |
|
|
|
|
BLD-Energy code compliance | 3/21/2017 | 3/22/2017 | 3/22/2017 | A | PASS |
Tony Young
|
|
|
Ed 1,2,3 floors Phone #: ###-####
|
BLD-Framing/Rough-in | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | PASS |
Tony Young
|
|
|
Ed 1,2,3 floors Phone #: ###-####,, need a couple straps,, firecaulking around main sprinkler line inside above the doors
|
BLD-Energy code compliance | 3/14/2017 | 3/14/2017 | 3/14/2017 | P | PASS |
Tony Young
|
|
|
2nd & 3rd floors; Ed Phone #: ###-####
|
BLD-Energy code compliance | 3/9/2017 | 3/10/2017 | 3/10/2017 | A | PART |
Tony Young
|
|
|
1st and 2nd floor Engery // Ed Phone #: ###-####,, drop areas ok
|
BLD-Energy code compliance | 3/8/2017 | 3/8/2017 | 3/8/2017 | P | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, 4th floor ok
|
BLD-Energy code compliance | 3/7/2017 | 3/8/2017 | 3/8/2017 | A | NR |
Tony Young
|
|
|
Ed Phone #: ###-####,, 4th floor
|
BLD-Other | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | DONE |
Tony Young
|
|
|
Ed Phone #: ###-####,, fire caulking in drops areas all floors,,
|
BLD-Framing/Rough-in | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, fire caulking ok,, ok to insulate drops areas
|
BLD-Energy code compliance | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PART |
Tony Young
|
|
|
1st - 4th floor // Ed Phone #: ###-####,, seal pack ok
|
BLD-Other | 3/3/2017 | 3/6/2017 | 3/6/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, fire caulking in drops areas all floors,, // frame corrections made ok,, work in progress on fire caulking
|
BLD-Framing/Rough-in | 3/2/2017 | 3/3/2017 | 3/3/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, pre insulation areas for drops,, ok to start fire caulking and insulation after trades rough pass,, need to verify fire caulking
|
BLD-Wall Bracing | 12/1/2016 | 12/2/2016 | 12/2/2016 | P | PART |
Jim Sly
|
|
|
Shear // Ed Phone #: ###-#### Select interior walls ok to insulate and cover
|
BLD-Wall Bracing | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####,, exterior ok
|
Routing - PUBLIC WORKS | 10/10/2016 | | 10/10/2016 | | PASS |
Rachael Beierle
|
|
|
|
BLD-Concrete | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, slab work,, pending special inspection report
|
BLD-Foundation | 7/28/2016 | 7/29/2016 | 7/29/2016 | A | PASS |
Mike Jordan
|
|
|
Ed Phone #: ###-####
|
BLD-Footing | 7/19/2016 | 7/19/2016 | 7/19/2016 | P | PASS |
Phil Shearer
|
|
|
Ed Phone #: ###-####.
|
Issue PAID IN FULL permit | | | 4/13/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/11/2016 | | DONE |
|
|
|
Left a message for James, with Bach Homes, informing him that the Kensington Apartment permits are 8 days past their expiration date and recommended he request another extension for 180 days. Also informed him that if he does request the extension it will be the final one that can be given.
|
Permit Ready to Issue | | | 4/8/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/31/2016 | | 4/7/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 4/1/2016 | | 4/7/2016 | | PASS |
Carl Westfall
|
|
|
Dave Haugland
|
Plan assigned to (CJW) | 7/20/2015 | | 4/7/2016 | | PASS |
Carl Westfall
|
|
|
Building J - Phase 2
|
Routing PW Drainage | 4/1/2016 | | 4/5/2016 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - FIRE | 4/1/2016 | | 4/5/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing PW Sewer Design | 4/1/2016 | | 4/5/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Street Lights | 4/1/2016 | | 4/5/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 4/1/2016 | | 4/4/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing - PUBLIC WORKS | 4/1/2016 | | 4/1/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Sewer Rating | 4/1/2016 | | 4/1/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 4/1/2016 | | 4/1/2016 | | PASS |
Laura Hunter
|
|
|
|
Plan resubmittals received | | | 3/31/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/9/2016 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/22/2016 | | 3/8/2016 | | FAIL |
Carl Westfall
|
|
|
Dave Haugland
|
Routing - PLANNING Land Div | 2/22/2016 | | 3/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLUMBING | 2/22/2016 | | 3/1/2016 | | PASS |
Bill VanDegrift
|
|
|
|
Routing PW Solid Waste | 2/22/2016 | | 2/29/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Drainage | 2/22/2016 | | 2/26/2016 | | FAIL |
Jason C. Taylor
|
|
|
|
Routing - PLAN CHECK | 2/17/2016 | | 2/25/2016 | | FAIL |
Carl Westfall
|
|
|
|
Routing - MECHANICAL | 2/22/2016 | | 2/25/2016 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Design | 2/22/2016 | | 2/25/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2016 | | 2/24/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - FIRE | 2/22/2016 | | 2/24/2016 | | FAIL |
Katie Marron
|
|
|
Attached updated report to case. Contacted applicant.
|
Routing - Addressing | 2/22/2016 | | 2/24/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 2/22/2016 | | 2/24/2016 | | PASS |
Josh Wilson
|
|
|
OK PER MODIFICATION DRH15-00313 JGW 2-24-16
|
Routing PW Sewer Rating | 2/22/2016 | | 2/24/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plan resubmittals received | | | 2/17/2016 | | DONE |
|
|
|
|
Extend Review Timeline | | | 12/17/2015 | | DONE |
Carl Westfall
|
|
|
Request approved by Jason Blais, Building Official. See attached document under BLD15-01118.
|
Routing PW Drainage | 9/21/2015 | | 9/21/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Route to Impact Fee Review | 8/27/2015 | 8/30/2015 | 8/28/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 8/27/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 8/27/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/22/2015 | | 8/26/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing Off Site - STRUCTURAL | 7/22/2015 | | 8/19/2015 | | FAIL |
Carl Westfall
|
|
|
|
Routing PW Drainage | 7/23/2015 | | 8/6/2015 | | FAIL |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Design | 7/23/2015 | | 8/6/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Sewer approved under separate Public Works project.
|
Routing - PLUMBING | 7/22/2015 | | 8/5/2015 | | FAIL |
Daryl Spivey
|
|
|
|
Routing PW Sewer Rating | 7/23/2015 | | 7/27/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 7/22/2015 | | 7/24/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - FIRE | 7/22/2015 | 7/22/2015 | 7/23/2015 | | FAIL |
Katie Marron
|
|
|
Comments attached to case and emailed to architect.
|
Routing - Design Review | 7/22/2015 | | 7/23/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS | 7/22/2015 | | 7/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Solid Waste | 7/23/2015 | | 7/23/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing - PLANNING Land Div | 7/22/2015 | | 7/23/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - MECHANICAL | 7/22/2015 | | 7/23/2015 | | PASS |
Troy James
|
|
|
|
Pending Assignment by TLW | 7/22/2015 | | 7/22/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 7/22/2015 | | 7/22/2015 | | PASS |
Andy J. Long
|
|
|
|
Intake Approval | | | 7/20/2015 | | PASS |
|
|
|
|
Intake Approval | | | 6/25/2015 | | FAIL |
Carl Westfall
|
|
|
(6-23-15) Drawings submitted in ePlanReview.
(6-25-15) Please refer to the circled items on the plan intake checklist and resolve them as noted.
|
Application received | | | 4/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 9 2015 3:20PM
|
Routing PW Solid Waste | 10/10/2016 | | | | |
Evan Carpenter
|
|
|
|