Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01127
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7430 W SAXTON DR
Project NameThe Kensington Apartments K
Customer NumberBLD15-01118 - BLD15-01137
ePlanReview 
Description
(THE KENSINGTON APARTMENTS - BUILDING K) The drawings are filed under BLD15-01118 in ePlanReview. Building is required to comply with the 2012 IRC. A fire sprinkler system is not required per State Amendment. To construct a 3,418 square foot two story building having two dwelling units (1,805 square foot 1st story and 1,613 square foot 2nd story). Each dwelling unit (4.a) has 2 stories and each dwelling unit has a total floor area of about 1,626 square feet (833 square foot 1st story and 793 square foot 2nd story). Neither dwelling unit is required to comply as a Type B or as a Type A dwelling unit. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, a dwelling unit separation wall, interior egress stairways, interior nonbearing walls, millwork, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  8/10/2017 DONE
DetailsChristina Prado
Zoning Approval7/31/20177/31/20177/31/2017 PASS
DetailsKatelyn Menuge
PubWorks Occupancy Approval6/29/20176/29/20176/29/2017 DONE
DetailsTiffany Lowery
BLD-Final5/1/20175/2/20175/2/2017ADONE
DetailsTony Young
Ed Phone #: ###-####,, late am
BLD-Final5/1/20175/2/20175/2/2017PPASS
DetailsTony Young
Ed Phone #: ###-####
FIRE-Final Inspection5/1/20175/2/20175/2/2017APASS
DetailsJim Page
No fire sprinklers, smoke/carbon monoxide detectors are stand alone per unit and not monitored. Final life fire safety inspection passed/complete.
Print Occupancy Form  4/17/2017 DONE
BLD-Energy code compliance1/31/20172/1/20172/1/2017APASS
DetailsTony Young
Insulation // Ed Phone #: ###-####
BLD-Energy code compliance1/30/20171/31/20171/31/2017ANR
DetailsMike Jordan
ed Phone #: ###-####
BLD-Framing/Rough-in1/26/20171/27/20171/27/2017APASS
DetailsJim Sly
Phone #: ###-####
BLD-Energy code compliance12/22/201612/23/201612/23/2016APART
DetailsTony Young
One wall // Ed Phone #: ###-####,, firewall ok to cover
BLD-Wall Bracing12/7/201612/8/201612/8/2016APASS
DetailsJim Sly
Shear // Ed Phone #: ###-####
BLD-Wall Bracing11/21/201611/21/201611/21/2016PNR
DetailsTony Young
Shear // Ed Phone #: ###-####,, needs nailing,, straps,, etc.,,
BLD-Framing/Rough-in10/4/201610/4/201610/10/2016PDONE
DetailsTony Young
roof nailing Apt K duplex call Ed with questions. Phone #: ###-####
Routing - PUBLIC WORKS10/10/2016 10/10/2016 PASS
DetailsRachael Beierle
BLD-Footing7/18/20167/18/20167/18/2016PPASS
DetailsDave Hannah
Ed Phone #: ###-####
BLD-Footing6/23/20166/24/20166/24/2016APASS
DetailsJim Sly
Ed Phone #: ###-####
Issue PAID IN FULL permit  4/13/2016 DONE
Telephone call  4/11/2016 DONE
Left a message for James, with Bach Homes, informing him that the Kensington Apartment permits are 8 days past their expiration date and recommended he request another extension for 180 days. Also informed him that if he does request the extension it will be the final one that can be given.
Permit Ready to Issue  4/8/2016 DONE
DetailsChristina Prado
All requirements met
PLANS/APPL TAKEN TO FRONT DESK  4/7/2016 DONE
Routing - PLAN CHECK3/31/2016 4/7/2016 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL4/1/2016 4/7/2016 PASS
DetailsCarl Westfall
Dave Haugland
Plan assigned to (CJW)7/20/2015 4/7/2016 PASS
DetailsCarl Westfall
Building K - Phase 2
Routing PW Drainage4/1/2016 4/5/2016 PASS
DetailsJason C. Taylor
Routing - FIRE4/1/2016 4/5/2016 PASS
DetailsKatie Marron
No change to previous approval
Routing PW Solid Waste4/1/2016 4/5/2016 PASS
DetailsMegan Durrell
Routing PW Sewer Design4/1/2016 4/5/2016 PASS
DetailsKyle S. Rosenmeyer
Routing PW Street Lights4/1/2016 4/5/2016 PASS
DetailsTom Marshall
Routing - PUBLIC WORKS4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing PW Sewer Rating4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing - Addressing4/1/2016 4/1/2016 PASS
DetailsLaura Hunter
Plan resubmittals received  3/31/2016 DONE
Plan resubmittals requested  3/9/2016 DONE
Routing Off Site - STRUCTURAL2/22/2016 3/8/2016 FAIL
DetailsCarl Westfall
Dave Haugland
Routing - PLANNING Land Div2/22/2016 3/1/2016 PASS
DetailsTodd Tucker
Routing - PLUMBING2/22/2016 3/1/2016 PASS
DetailsBill VanDegrift
Routing PW Solid Waste2/22/2016 2/29/2016 PASS
DetailsMegan Durrell
Routing PW Drainage2/22/2016 2/26/2016 FAIL
DetailsJason C. Taylor
Routing - PLAN CHECK2/17/2016 2/25/2016 FAIL
DetailsCarl Westfall
Routing - MECHANICAL2/22/2016 2/25/2016 PASS
DetailsTroy James
Routing PW Sewer Design2/22/2016 2/25/2016 PASS
DetailsKyle S. Rosenmeyer
Routing - FIRE2/22/2016 2/24/2016 PASS
DetailsKatie Marron
No change from previous approval.
Routing - Addressing2/22/2016 2/24/2016 PASS
DetailsLaura Hunter
Routing - Design Review2/22/2016 2/24/2016 PASS
DetailsJosh Wilson
OK PER MODIFICATION DRH15-00313 JGW 2-24-16
Routing PW Sewer Rating2/22/2016 2/24/2016 PASS
DetailsJennifer Bruner
Routing - PUBLIC WORKS7/22/2015 2/24/2016 FAIL
DetailsJennifer Bruner
Plan resubmittals received  2/22/2016 DONE
Extend Review Timeline  12/17/2015 DONE
DetailsCarl Westfall
Request approved by Jason Blais, Building Official. See attached document under BLD15-01118.
Routing PW Drainage9/21/2015 9/21/2015 PASS
DetailsJason C. Taylor
Route to Impact Fee Review8/27/20158/30/20158/28/2015 PASS
DetailsCindy M. Gould
1st review completed  8/27/2015 DONE
Plan resubmittals requested  8/27/2015 DONE
Routing - PLAN CHECK7/22/2015 8/26/2015 FAIL
DetailsCarl Westfall
Revised drawings required
Routing Off Site - STRUCTURAL7/22/2015 8/19/2015 FAIL
DetailsCarl Westfall
Dave Haugland
Routing PW Drainage7/23/2015 8/6/2015 FAIL
DetailsJason C. Taylor
Routing PW Sewer Design7/23/2015 8/6/2015 PASS
DetailsKyle S. Rosenmeyer
Sewer approved under separate Public Works project.
Routing - PLUMBING7/22/2015 8/5/2015 FAIL
DetailsDaryl Spivey
Routing PW Sewer Rating7/23/2015 7/27/2015 PASS
DetailsJennifer Bruner
Routing - FIRE7/22/20157/22/20157/24/2015 PASS
DetailsKatie Marron
Building built under IRC, application reviewed for fire department access and fire flow under BLD15-01126
Routing - Addressing7/22/2015 7/24/2015 PASS
DetailsEmily Dixon
Routing - Design Review7/22/2015 7/23/2015 PASS
DetailsJosh Wilson
Routing PW Solid Waste7/23/2015 7/23/2015 PASS
DetailsMegan Durrell
Routing - PLANNING Land Div7/22/2015 7/23/2015 PASS
DetailsDave Abo
Routing - MECHANICAL7/22/2015 7/23/2015 PASS
DetailsTroy James
Pending Assignment by TLW7/22/2015 7/22/2015 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment7/22/2015 7/22/2015 PASS
DetailsAndy J. Long
Intake Approval  7/20/2015 PASS
Intake Approval  6/25/2015 FAIL
DetailsCarl Westfall
(6-23-15) Drawings submitted in ePlanReview.

(6-25-15) Please refer to the circled items on the plan intake checklist and resolve them as noted.
Application received  4/9/2015 DONE
Application submitted via PDS Online on Apr 9 2015 3:20PM
Routing PW Solid Waste10/10/2016    
DetailsEvan Carpenter