Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD15-01130
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7582 W SAXTON DR
Project NameThe Kensington Apartments S
Customer NumberBLD15-01118 - BLD15-01137
ePlanReview 
Description
(THE KENSINGTON APARTMENTS - BUILDING S) The drawings are filed under BLD15-01118 in ePlanReview. The NFPA 13-R fire sprinkler system is used for occupancy. To construct a 10,024 square foot two story apartment and parking garage building (5,032 sq. ft. 1st story with 14 one car garages and one 1.e dwelling unit and 4,992 sq. ft. 2nd story with one 2.h dwelling unit, one 2.f dwelling unit, and three 1.f dwelling units). Two units share an interior stairway, two units share a different interior stairway, and one unit has its own interior stairway. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, 1-hr dwelling unit separations, interior stairways, interior nonbearing walls, millwork, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  12/4/2017 DONE
DetailsChristina Prado
BLD-Final11/30/201712/1/201712/1/2017APASS
DetailsTony Young
Ed Phone #: ###-####
PubWorks Occupancy Approval11/30/201711/30/201711/30/2017 DONE
DetailsTiffany Lowery
Zoning Approval11/21/201711/21/201711/21/2017 DONE
DetailsAndrea Tuning
BLD-Aging Inspection9/8/20179/8/20179/15/2017 PASS
DetailsTony Young
BLD-Aging Inspection9/7/20179/7/20179/8/2017 PASS
DetailsTony Young
BLD-Final4/26/20174/26/20174/26/2017PPASS
DetailsTony Young
Ed Phone #: ###-####,, 2nd hand rails going in
BLD-Conference4/25/20174/26/20174/26/2017APEND
DetailsTony Young
Ed Phone #: ###-####,, hand rail conf.
BLD-Final4/24/20174/25/20174/25/2017PPART
DetailsTony Young
Ed Phone #: ###-####,, ok,, needs a 2nd hand rail in stairs serving 2 units
FIRE-Final Inspection4/24/20174/25/20174/25/2017APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers will be mounted in discussed locations, knox box is in place, thumbturn deadbolts in common area doorways will be changed to double-keyed deadbolts. Final life fire safety inspection passed/complete.
BLD-Final4/25/20174/25/20174/25/2017APART
DetailsTony Young
Ed Phone #: ###-####,, walk through only,, note.. need to see why alarm permit is tied to this permit?? need trades
Print Occupancy Form  4/17/2017 DONE
BLD-Energy code compliance2/28/20173/1/20173/1/2017APASS
DetailsTony Young
Ed-lower levels Phone #: ###-####
BLD-Framing/Rough-in2/22/20172/23/20172/23/2017APASS
DetailsTony Young
First level // Ed Phone #: ###-####,, ok to insulate
BLD-Energy code compliance2/21/20172/21/20172/21/2017PPASS
DetailsTony Young
2nd Floor Insulation Inspection Phone #: ###-#### Inspection requested via web by Barry Willoughby
BLD-Wall cover2/20/20172/21/20172/21/2017APART
DetailsTony Young
2nd Floor Insulation Inspection Phone #: ###-#### Inspection requested via web by Barry Willoughby,, 2nd floor ok
BLD-Aging Inspection2/16/20172/16/20172/17/2017 PASS
DetailsTony Young
BLD-Framing/Rough-in2/15/20172/16/20172/16/2017APART
DetailsTony Young
Ed Phone #: ###-####,, up stairs only,, ok to insulate,, need to fire stop chases
BLD-Aging Inspection2/15/20172/15/20172/15/2017 PEND
DetailsTony Young
BLD-Framing/Rough-in2/3/20172/6/20172/6/2017ANR
DetailsTony Young
Ed Phone #: ###-####,, walk through only,, need seal package,, hangers, straps,, temp glass, truss nailing,, bearing, etc
BLD-Wall Bracing10/3/201610/4/201610/4/2016APASS
DetailsTony Young
ED Phone #: ###-####,, exterior ok
BLD-Footing6/21/20166/22/20166/22/2016APART
DetailsTony Young
Ed Phone #: ###-####,, ok pending special inspection report
BLD-Foundation5/16/20165/17/20165/17/2016APART
DetailsJim Sly
stem wall; Ed Phone #: ###-####
BLD-Footing5/6/20165/9/20165/9/2016APEND
DetailsTony Young
Ed Phone #: ###-####,, pending special inspection
Issue PAID IN FULL permit  4/13/2016 DONE
Telephone call  4/11/2016 DONE
Left a message for James, with Bach Homes, informing him that the Kensington Apartment permits are 8 days past their expiration date and recommended he request another extension for 180 days. Also informed him that if he does request the extension it will be the final one that can be given.
Permit Ready to Issue  4/8/2016 DONE
All requirements met
PLANS/APPL TAKEN TO FRONT DESK  4/7/2016 DONE
Routing - PLAN CHECK3/31/2016 4/7/2016 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL4/1/2016 4/7/2016 PASS
DetailsCarl Westfall
Dave Haugland
Plan assigned to (CJW)7/20/2015 4/7/2016 PASS
DetailsCarl Westfall
Building S - Phase 2
Routing PW Drainage4/1/2016 4/5/2016 PASS
DetailsJason C. Taylor
Routing - FIRE4/1/2016 4/5/2016 PASS
DetailsKatie Marron
No change to previous approval
Routing PW Sewer Design4/1/2016 4/5/2016 PASS
DetailsKyle S. Rosenmeyer
Routing PW Street Lights4/1/2016 4/5/2016 PASS
DetailsTom Marshall
Routing PW Solid Waste4/1/2016 4/4/2016 PASS
DetailsMegan Durrell
Routing - PUBLIC WORKS4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing PW Sewer Rating4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing - Addressing4/1/2016 4/1/2016 PASS
DetailsLaura Hunter
Plan resubmittals received  3/31/2016 DONE
Plan resubmittals requested  3/9/2016 DONE
Routing Off Site - STRUCTURAL2/22/2016 3/8/2016 FAIL
DetailsCarl Westfall
Dave Haugland
Routing - PLANNING Land Div2/22/2016 3/1/2016 PASS
DetailsTodd Tucker
Routing - PLUMBING2/22/2016 3/1/2016 PASS
DetailsBill VanDegrift
Routing PW Solid Waste2/22/2016 2/29/2016 PASS
DetailsMegan Durrell
Routing PW Drainage2/22/2016 2/26/2016 FAIL
DetailsJason C. Taylor
Routing - PLAN CHECK2/17/2016 2/25/2016 FAIL
DetailsCarl Westfall
Routing - MECHANICAL2/22/2016 2/25/2016 PASS
DetailsTroy James
Routing PW Sewer Design2/22/2016 2/25/2016 PASS
DetailsKyle S. Rosenmeyer
Routing - PUBLIC WORKS2/22/2016 2/24/2016 PASS
DetailsJennifer Bruner
Routing - FIRE2/22/2016 2/24/2016 PASS
DetailsKatie Marron
No change from previous approval.
Routing - Addressing2/22/2016 2/24/2016 PASS
DetailsLaura Hunter
Routing - Design Review2/22/2016 2/24/2016 PASS
DetailsJosh Wilson
OK PER MODIFICATION DRH15-00313 JGW 2-24-16
Routing PW Sewer Rating2/22/2016 2/24/2016 PASS
DetailsJennifer Bruner
Plan resubmittals received  2/17/2016 DONE
Extend Review Timeline  12/17/2015 DONE
DetailsCarl Westfall
Request approved by Jason Blais, Building Official. See attached document under BLD15-01118.
Routing PW Drainage9/21/2015 9/21/2015 PASS
DetailsJason C. Taylor
Route to Impact Fee Review8/27/20158/30/20158/28/2015 PASS
DetailsCindy M. Gould
1st review completed  8/27/2015 DONE
Plan resubmittals requested  8/27/2015 DONE
Routing - PLAN CHECK7/22/2015 8/26/2015 FAIL
DetailsCarl Westfall
Revised drawings required
Routing Off Site - STRUCTURAL7/22/2015 8/19/2015 FAIL
DetailsCarl Westfall
Dave Haugland
Routing PW Drainage7/23/2015 8/6/2015 FAIL
DetailsJason C. Taylor
Routing PW Sewer Design7/23/2015 8/6/2015 PASS
DetailsKyle S. Rosenmeyer
Sewer approved under separate Public Works project.
Routing - PLUMBING7/22/2015 8/5/2015 FAIL
DetailsDaryl Spivey
Routing PW Sewer Rating7/23/2015 7/27/2015 PASS
DetailsJennifer Bruner
Routing - FIRE7/22/20157/22/20157/24/2015 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Addressing7/22/2015 7/24/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS7/22/2015 7/23/2015 PASS
DetailsJennifer Bruner
Routing - Design Review7/22/2015 7/23/2015 PASS
DetailsJosh Wilson
Routing PW Solid Waste7/23/2015 7/23/2015 PASS
DetailsMegan Durrell
Routing - PLANNING Land Div7/22/2015 7/23/2015 PASS
DetailsDave Abo
Routing - MECHANICAL7/22/2015 7/23/2015 PASS
DetailsTroy James
Pending Assignment by TLW7/22/2015 7/22/2015 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment7/22/2015 7/22/2015 PASS
DetailsAndy J. Long
Intake Approval  7/20/2015 PASS
Intake Approval  6/25/2015 FAIL
DetailsCarl Westfall
(6-23-15) Drawings submitted in ePlanReview.

(6-25-15) Please refer to the circled items on the plan intake checklist and resolve them as noted.
Application received  4/9/2015 DONE
Application submitted via PDS Online on Apr 9 2015 3:20PM
First Notice 12/14/2017