Zoning Approval | 4/18/2018 | 4/18/2018 | 4/18/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Letter of compliance/Occupancy | | | 1/16/2018 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 1/16/2018 | | DONE |
|
|
|
|
Zoning Approval Temp | 1/12/2018 | 1/12/2018 | 1/12/2018 | | PASS |
Katelyn Menuge
|
|
|
Temp Landscape BND18-00002
|
BLD-Final | 1/8/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Jim Sly
|
|
|
Ed Phone #: ###-####
|
FIRE-Final Inspection | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, smoke detectors are stand-alone, fire extinguishers are mounted under kitchen sink. Final life fire safety inspection complete.
|
BLD-Energy code compliance | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PASS |
Jim Sly
|
|
|
Ed Phone #: ###-####
|
BLD-Framing/Rough-in | 11/9/2017 | 11/9/2017 | 11/10/2017 | P | PASS |
Jim Sly
|
|
|
Ed Phone #: ###-####
|
BLD-Energy code compliance | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PART |
Tony Young
|
|
|
Berry Phone #: ###-#### ,, insulation behind tubs/shower areas ok after fireblocking plate lines
|
BLD-Aging Inspection | 7/6/2017 | 7/6/2017 | 7/7/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Wall Bracing | 7/5/2017 | 7/6/2017 | 7/6/2017 | A | PASS |
Dave Hannah
|
|
|
ed Phone #: ###-####
|
BLD-Concrete | 4/6/2017 | 4/6/2017 | 4/6/2017 | P | PEND |
Tony Young
|
|
|
Ed Phone #: ###-####,, pending special inspection report
|
BLD-Foundation | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PASS |
Jim Sly
|
|
|
Rebar // Ed Phone #: ###-#### Pending special..........
|
BLD-Footing | 2/15/2017 | 2/16/2017 | 2/16/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, ok pending special inspection report
|
BLD-Footing | 12/15/2016 | 12/16/2016 | 12/16/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, ok pending special inspection report,, also they are going to tent and heat for 3 days for cold weather provisions.
|
BLD-Footing | 12/15/2016 | 12/15/2016 | 12/16/2016 | P | NR |
Tony Young
|
|
|
Ed Phone #: ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/6/2016 | | DONE |
|
|
|
All Met (BLD15-01119, 01120, 01131, 01132, 01133, 01134 AND BLD16-01590 TO BLD16-01606)
|
Issue PAID IN FULL permit | | | 12/6/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/6/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/20/2015 | | 12/6/2016 | | PASS |
Carl Westfall
|
|
|
Bldg AA - 7696 W. Saxton Dr.
|
Routing - PLAN CHECK | 12/5/2016 | | 12/6/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLUMBING | 12/5/2016 | | 12/5/2016 | | PASS |
Bill VanDegrift
|
|
|
Four bedroom unit water heaters to have an 80 gallon firs hour recovery rating in accordance with conversations with James McLaughlin and the design team.
|
Plan resubmittals received | | | 12/5/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/1/2016 | | DONE |
|
|
|
|
1st review completed | | | 11/23/2016 | | DONE |
|
|
|
|
Routing PW Drainage | 11/7/2016 | | 11/22/2016 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 11/7/2016 | | 11/22/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Street Lights | 11/7/2016 | | 11/22/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - Design Review | 11/7/2016 | | 11/22/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing Off Site - STRUCTURAL | 11/7/2016 | | 11/22/2016 | | PASS |
Carl Westfall
|
|
|
Dave Haugland AHJ
|
Route to Impact Fee Review | 11/7/2016 | 11/10/2016 | 11/17/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 11/7/2016 | | 11/16/2016 | | PASS |
David Moser
|
|
|
|
Routing - PLUMBING | 11/7/2016 | | 11/16/2016 | | FAIL |
Bill VanDegrift
|
|
|
|
Routing - MECHANICAL | 11/16/2016 | | 11/16/2016 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 11/7/2016 | | 11/15/2016 | | PASS |
Scott Arellano
|
|
|
No comments attached. Fire Department Vehicle Access and Water supply aproved under separate permits.
|
Routing - PLAN CHECK | 11/1/2016 | | 11/14/2016 | | PASS |
Carl Westfall
|
|
|
Approval after Structural approved
|
Routing - MECHANICAL | 11/7/2016 | | 11/8/2016 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING Land Div | 11/7/2016 | | 11/8/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Erosion and Sediment | 11/7/2016 | | 11/8/2016 | | PASS |
Andy J. Long
|
|
|
|
Routing - Addressing | 11/7/2016 | | 11/7/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 11/7/2016 | | PASS |
Carl Westfall
|
|
|
Permits desk did not route in ePlanReview on November 1. Routing was started by the Plans Examiner on November 7 after it was determined how fees would be resolved.
|
Recd Pcfee & Taken To Pln CK | | | 11/1/2016 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/1/2016 | | PASS |
|
|
|
Plan intake approved
|
Plans ACCEPTED BY PLAN TECH | | | 11/1/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/20/2016 | | FAIL |
|
|
|
(10-20-16) Please see the circled items on the Plan Intake Checklist and resolve each item as noted.
|
Intake Approval | | | 9/13/2016 | | FAIL |
|
|
|
(9-13-16) Please see the circled items on the Plan Intake Checklist and resolve each item as noted. This plan intake was delayed while the Building Official investigated whether it could come in without a recorded subdivision plat. It was decided that it could not be submitted without the plat.
|
Intake Approval | | | 8/17/2016 | | FAIL |
|
|
|
(8-17-16) Please provide the following for Phase 3:
1) Fill out and upload into the documents folder a completed 402 plan intake checklist.
2) Detail how property line walls will be constructed, including the common portion of the wall and the portion that is not common. Detail how the eaves will be placed relative to property line walls. 2-hr walls must extend all the way to the underside of the highest roof deck. Detail how laydown parapets will be constructed. Exterior walls at property lines must be 1-hr rated from both sides.
3) Upload a copy of the approved and recorded subdivision plat.
With this information, a plan intake review for Phase 3 can be completed.
|
Plan Reviewer's activity | | | 5/9/2016 | | DONE |
|
|
|
The applicant decided to change Buildings B, C, X, Y, Z, and AA to townhomes with property lines between each dwelling unit. They will be regulated by the 2012 IRC and will not be required to have a fire sprinkler system.
|
Intake Approval | | | 5/9/2016 | | FAIL |
|
|
|
(5-9-16) Please provide the following for Phase 3:
1) Upload a separate application 402 for each of the 23 dwelling units into the documents folder. Use the addresses, permit numbers, and unit types on the applications as redlined on Sheet A0.0.
2) Fill out and upload into the documents folder a completed 402 plan intake checklist.
3) Detail how property line walls will be constructed, including the common portion of the wall and the portion that is not common. Detail how the eaves will be placed relative to property line walls.
4) Provide stairway details that represent the interior stairways.
5) Upload a copy of the approved and recorded subdivision plat.
6) Upload drawings showing each dwelling having its own electrical service.
With this information, a plan intake review for Phase 3 can be completed.
|
Telephone call | | | 4/11/2016 | | DONE |
|
|
|
Left a message for James, with Bach Homes, informing him that the Kensington Apartment permits are 8 days past their expiration date and recommended he request another extension for 180 days. Also informed him that if he does request the extension it will be the final one that can be given.
|
Extend Review Timeline | | | 12/17/2015 | | DONE |
Carl Westfall
|
|
|
Request approved by Jason Blais, Building Official. See attached document under BLD15-01118.
|
Intake Approval | | | 7/20/2015 | | FAIL |
|
|
|
The applicant decided to change Buildings B, C, X, Y, Z, and AA to townhomes with property lines between each dwelling unit. They will be regulated by the 2012 IRC and will not be required to have a fire sprinkler system.
|
Intake Approval | | | 6/25/2015 | | FAIL |
Carl Westfall
|
|
|
(6-23-15) Drawings submitted in ePlanReview.
(6-25-15) Please refer to the circled items on the plan intake checklist and resolve them as noted.
|
Application received | | | 4/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 9 2015 3:20PM
|