Permit Information
Permit NumberBLD15-01137
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7570 W SAXTON DR
Project NameThe Kensington Apartments G3
Customer NumberBLD15-01118 - 01137,16-00539 & 540
ePlanReview 
Description
(THE KENSINGTON APARTMENTS – GARAGE BUILDING #3) The drawings are filed under BLD15-01118 in ePlanReview. A fire sprinkler system is not required. To construct a 1,523 square foot garage building having three 255 square foot individual garages, one 377 square foot individual van accessible garage, and one 374 square foot maintenance room. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, interior nonbearing walls, a 1-hr property line wall, a 1-hr ceiling in lieu of a parapet, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/19/20181/22/20181/22/2018APASS
DetailsTony Young
Ed Phone #: ###-####
FIRE-Final Inspection1/22/20181/22/20181/22/2018PPASS
DetailsJim Page
Final life fire safety inspection for area of work complete.
BLD-Conference11/4/201611/4/201611/4/2016PPASS
DetailsTony Young
Ed Phone #: ###-####
BLD-Aging Inspection11/4/201611/4/201611/4/2016 PEND
DetailsTony Young
BLD-Aging Inspection11/3/201611/3/201611/4/2016 PASS
DetailsTony Young
BLD-Wall Bracing6/21/20166/22/20166/22/2016APART
DetailsTony Young
Ed Phone #: ###-####,, garage ok
BLD-Foundation5/11/20165/12/20165/12/2016APASS
DetailsPhil Shearer
Ed-preslab-garage Phone #: ###-#### OK pending Geotech special inspections, tests and approvals.
BLD-Foundation4/29/20165/2/20165/2/2016APASS
DetailsJim Sly
Ed Phone #: ###-####
OK pending Geotech Special insp, tests and approvals.
BLD-Footing4/27/20164/28/20164/28/2016APART
DetailsJim Sly
Ed Phone #: ###-####
OK pending Geotech special inspections, testrs and approvals.
BLD-Footing4/25/20164/26/20164/26/2016ACANC
DetailsTony Young
Ed Phone #: ###-####
Issue PAID IN FULL permit  4/13/2016 DONE
Telephone call  4/11/2016 DONE
Left a message for James, with Bach Homes, informing him that the Kensington Apartment permits are 8 days past their expiration date and recommended he request another extension for 180 days. Also informed him that if he does request the extension it will be the final one that can be given.
Permit Ready to Issue  4/8/2016 DONE
DetailsChristina Prado
All requirements met
PLANS/APPL TAKEN TO FRONT DESK  4/7/2016 DONE
Routing - PLAN CHECK3/31/2016 4/7/2016 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL4/1/2016 4/7/2016 PASS
DetailsCarl Westfall
Dave Haugland
Plan assigned to (CJW)7/20/2015 4/7/2016 PASS
DetailsCarl Westfall
Garage #3 - Phase 2
Routing PW Drainage4/1/2016 4/5/2016 PASS
DetailsJason C. Taylor
Routing - FIRE4/1/2016 4/5/2016 PASS
DetailsKatie Marron
No change to previous approval
Routing PW Sewer Design4/1/2016 4/5/2016 PASS
DetailsKyle S. Rosenmeyer
Routing PW Street Lights4/1/2016 4/5/2016 PASS
DetailsTom Marshall
Routing PW Solid Waste4/1/2016 4/4/2016 PASS
DetailsMegan Durrell
Routing - PUBLIC WORKS4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing PW Sewer Rating4/1/2016 4/1/2016 PASS
DetailsRachael Beierle
Routing - Addressing4/1/2016 4/1/2016 PASS
DetailsLaura Hunter
Plan resubmittals received  3/31/2016 DONE
Plan resubmittals requested  3/9/2016 DONE
Routing Off Site - STRUCTURAL2/22/2016 3/8/2016 FAIL
DetailsCarl Westfall
Dave Haugland
Routing - PLANNING Land Div2/22/2016 3/1/2016 PASS
DetailsTodd Tucker
Routing - PLUMBING2/22/2016 3/1/2016 PASS
DetailsBill VanDegrift
Routing PW Solid Waste2/22/2016 2/29/2016 PASS
DetailsMegan Durrell
Routing PW Drainage2/22/2016 2/26/2016 FAIL
DetailsJason C. Taylor
Routing - PLAN CHECK2/17/2016 2/25/2016 FAIL
DetailsCarl Westfall
Routing - MECHANICAL2/22/2016 2/25/2016 PASS
DetailsTroy James
Routing PW Sewer Design2/22/2016 2/25/2016 PASS
DetailsKyle S. Rosenmeyer
Routing - PUBLIC WORKS2/22/2016 2/24/2016 PASS
DetailsJennifer Bruner
Routing - FIRE2/22/2016 2/24/2016 PASS
DetailsKatie Marron
No change from previous approval.
Routing - Addressing2/22/2016 2/24/2016 PASS
DetailsEmily Dixon
Routing - Design Review2/22/2016 2/24/2016 PASS
DetailsJosh Wilson
OK PER MODIFICATION DRH15-00313 JGW 2-24-16
Routing PW Sewer Rating2/22/2016 2/24/2016 PASS
DetailsJennifer Bruner
Plan resubmittals received  2/17/2016 DONE
Extend Review Timeline  12/17/2015 DONE
DetailsCarl Westfall
Request approved by Jason Blais, Building Official. See attached document under BLD15-01118.
Routing PW Drainage9/21/2015 9/21/2015 PASS
DetailsJason C. Taylor
Route to Impact Fee Review8/27/20158/30/20158/28/2015 PASS
DetailsCindy M. Gould
1st review completed  8/27/2015 DONE
Plan resubmittals requested  8/27/2015 DONE
Routing - PLAN CHECK7/22/2015 8/26/2015 FAIL
DetailsCarl Westfall
Revised drawings required
Routing Off Site - STRUCTURAL7/22/2015 8/19/2015 FAIL
DetailsCarl Westfall
Dave Haugland
Routing PW Drainage7/23/2015 8/6/2015 FAIL
DetailsJason C. Taylor
Routing PW Sewer Design7/23/2015 8/6/2015 PASS
DetailsKyle S. Rosenmeyer
Sewer approved under separate Public Works project.
Routing - PLUMBING7/22/2015 8/5/2015 FAIL
DetailsDaryl Spivey
Routing PW Sewer Rating7/23/2015 7/27/2015 PASS
DetailsJennifer Bruner
Routing - Addressing7/22/2015 7/24/2015 PASS
DetailsEmily Dixon
Routing - FIRE7/22/20157/22/20157/23/2015 PASS
DetailsKatie Marron
Comments attached to case.
Routing - PUBLIC WORKS7/22/2015 7/23/2015 PASS
DetailsJennifer Bruner
Routing - PLANNING Land Div7/22/2015 7/23/2015 PASS
DetailsDave Abo
Routing PW Solid Waste7/23/2015 7/23/2015 PASS
DetailsMegan Durrell
Routing - MECHANICAL7/22/2015 7/23/2015 PASS
DetailsTroy James
Routing - Design Review7/22/2015 7/23/2015 PASS
DetailsJosh Wilson
Pending Assignment by TLW7/22/2015 7/22/2015 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment7/22/2015 7/22/2015 PASS
DetailsAndy J. Long
Intake Approval  7/20/2015 PASS
Intake Approval  6/25/2015 FAIL
DetailsCarl Westfall
(6-23-15) Drawings submitted in ePlanReview.

(6-25-15) Please refer to the circled items on the plan intake checklist and resolve them as noted.
Application received  4/9/2015 DONE
Application submitted via PDS Online on Apr 9 2015 3:20PM