Letter of compliance/Occupancy | | | 2/3/2017 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 2/3/2017 | | DONE |
|
|
|
|
BLD-Final | 2/1/2017 | 2/1/2017 | 2/1/2017 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####
|
Zoning Approval | 11/21/2016 | 11/21/2016 | 11/21/2016 | | PASS |
Josh Wilson
|
|
|
|
Inspection Record Card- Bld | | | 11/18/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/15/2016 | 11/16/2016 | 11/16/2016 | P | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
FIRE-Final Inspection | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to provide self luminous exit signs at the gates as per the building review note 10
|
FIRE-Final Inspection | 10/5/2016 | 10/6/2016 | 10/6/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide small documents for the building inspector, provide panic hardware as per approved plans sheet 1 of 7, provide electric strikes on gates (no mag locks) per plan review, provide two fire extinguishers as discussed, provide emergency lighting and exit signs per the building review comments
|
BLD-Footing | 5/25/2016 | 5/26/2016 | 5/26/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, pending SI report
|
BLD-Foundation | 3/8/2016 | 3/8/2016 | 3/8/2016 | P | PASS |
Tony Young
|
|
|
rebar pool // Adam Phone #: ###-#### see ele16-00701
|
Issue PAID IN FULL permit | | | 1/12/2016 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 1/12/2016 | | DONE |
Christina Prado
|
|
|
|
Extend Review Timeline | | | 12/22/2015 | | DONE |
|
|
|
1st 180 day extension granted by Jason B
|
Telephone call | | | 12/7/2015 | | DONE |
|
|
|
Left a message with Nacy letting her know I was trying to get ahold of whoever is working on the K. Apart. (somehow it went right to her voicemail). Informed her that I'm just trying to get intouch with whomever is working on the project to recommend to them to get an extension on the six permits that they haven't picked up yet since they are 61 days past their expiration date
|
Telephone call | | | 11/30/2015 | | DONE |
|
|
|
Left a message again recommending to request an extension for the six permits that have not been picked up yet. Gave them Janson B's email and all the Permit numbers.
|
Telephone call | | | 11/18/2015 | | DONE |
|
|
|
Left a message for Ben that if they weren't going to be able to pick the permit up this week that I would recommend sending an email to Jason B requesting a 180 day extension. Gave him Jasons email and the permit number
|
OVERRIDE | | | 11/12/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 5/29/2015 | 5/29/2015 | 11/12/2015 | | PASS |
Carl Westfall
|
|
|
(1st done) SWIMMING POOL AND SPA (June 18 - 15 days) Level 3 TI - ePlanReview
|
Routing - PLUMBING | 11/6/2015 | | 11/12/2015 | | PASS |
Daryl Spivey
|
|
|
Redlines need to be mored to latest version see redlines
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2015 | | PASS |
|
|
|
Drawings approved with redlines
|
Permit Ready to Issue | | | 11/12/2015 | | DONE |
|
|
|
Needs Responsible Person, GC Form, Revised Cert of Value
|
Routing - MECHANICAL | 11/6/2015 | | 11/9/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 11/6/2015 | | 11/6/2015 | | PASS |
David Moser
|
|
|
|
Routing - PLAN CHECK | 11/4/2015 | | 11/6/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved with redlines
|
Plan resubmittals received | | | 11/4/2015 | | DONE |
|
|
|
|
Routing PW Drainage | 9/21/2015 | | 9/21/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plan resubmittals requested | | | 8/7/2015 | | DONE |
|
|
|
Workflow in ePlanReview completed
|
Routing PW Drainage | 6/1/2015 | | 8/5/2015 | | PASS |
Jason C. Taylor
|
|
|
Drainage is to be approved under BLD15-01107 & BLD15-01118. JCT
|
Routing - MECHANICAL | 7/27/2015 | | 7/28/2015 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 7/27/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/29/2015 | | 7/27/2015 | | FAIL |
Carl Westfall
|
|
|
1st IBC plan review completed
|
Routing - FIRE | 5/29/2015 | 5/29/2015 | 6/4/2015 | | PASS |
Scott Arellano
|
|
|
No comments
|
Routing - Erosion and Sediment | 5/29/2015 | | 6/3/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to earth disturbance)
(KENSINGTON APARTMENTS)(SWIMMING POOL) To construct a new 30,779 gallon swimming pool and 3,029 gallon spa for apartment complex
|
Routing - PLUMBING | 5/29/2015 | | 6/3/2015 | | PASS |
Bill VanDegrift
|
|
|
Pool and spa potable makeup water requires RPBP installed.
|
Routing - PLANNING | 5/29/2015 | | 6/2/2015 | | FAIL |
David Moser
|
|
|
David Moser - PUD14-00003 - Need to comply with condition of approval 2(p) of PUD14-00003
|
Routing - PUBLIC WORKS | 5/29/2015 | | 6/1/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Sewer Rating | 6/1/2015 | | 6/1/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Design Review | 5/29/2015 | | 6/1/2015 | | PASS |
Josh Wilson
|
|
|
Ok per DRH14-00349
|
Routing - Addressing | 5/29/2015 | | 5/29/2015 | | PASS |
Emily Dixon
|
|
|
Address corrected to 7570 W Saxton Dr.
|
Intake Approval | | | 5/29/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Pending Assignment by JCB | 5/29/2015 | | 5/29/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 5/1/2015 | | FAIL |
Javier Guzman
|
|
|
1. Please provide Stamped and signed soils and Geotech report and Soils and Geotech report for infiltration systems, the Geotech report submitted is not Stamped by an Idaho licensed engineer and signed and missing the report for infiltration systems.
2. Please provide Code Analysis/Building Data on front sheet of plans which includes: code year, occupancy group(s), land use zone, construction type, etc…
3. Structural calculations for pool design stamped and signed by an Idaho licensed engineer.
4. Please provide ICC-ES Evaluation Services Report for all anchor connection products proposed for attaching the swimming pool accessory components
|
Application received | | 4/9/2015 | | | |
|
|
|
|