BLD-Final | 10/27/2015 | 10/28/2015 | 10/28/2015 | P | PASS |
Tony Young
|
|
|
Access through garage, code 0713. Fireplace inspection scheduled Oct 29th AM. Grading Inspection has passed. Entry landing has been built. All should be good for final. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
DOC - Permit Finaled | 10/28/2015 | 10/28/2015 | 10/28/2015 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 10/27/2015 | 10/28/2015 | 10/28/2015 | A | PASS |
Tony Young
|
|
|
Site erosion and stabilization inspection with Jason Taylor Tuesday am. Final C of O inspection Tuesday PM. Call me for access. garage code 0713 or 4444. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Final | 10/26/2015 | 10/27/2015 | 10/27/2015 | P | NR |
Tony Young
|
|
|
Site erosion and stabilization inspection with Jason Taylor Tuesday am. Final C of O inspection Tuesday PM. Call me for access. garage code 0713 or 4444. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, need fireplace final, need hand rail on front steps with 4 risers
|
BLD-Conference | 10/27/2015 | 10/27/2015 | 10/27/2015 | A | PART |
Tony Young
|
|
|
Call me for access. garage code 0713 or 4444. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, walk through,, need mech pass on fireplace
|
PubWorks Occupancy Approval | 10/27/2015 | 10/27/2015 | 10/27/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s landscape architect indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Other | 8/12/2015 | 8/13/2015 | 8/13/2015 | A | DONE |
Jim Sly
|
|
|
What is the process to have one hour WUI inspected to confirm lighting boxes and sheetrock install properly? I do not see a specific inspection for this? Please educate me. Phone #: ###-#### Inspection requested via web by Andrew George Exterior OK to cover. can lights OK WUI
|
BLD-Energy code compliance | 7/27/2015 | 7/27/2015 | 7/27/2015 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Framing/Rough-in | 7/21/2015 | 7/21/2015 | 7/21/2015 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Framing/Rough-in | 7/20/2015 | 7/20/2015 | 7/20/2015 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George. Needs to provide truss engineering.
|
BLD-Wall Bracing | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George Exterior wall and roof shear nailing OK.
|
BLD-Foundation | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PART |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, will need to support cantilever between house and garage later
|
BLD-Footing | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | PASS |
Tony Young
|
|
|
ftgs ok
|
CHANGE STATUS TO (ISS) | | | 5/20/2015 | | DONE |
|
|
|
|
BLD-Conference | 5/19/2015 | 5/19/2015 | 5/19/2015 | P | PEND |
Tony Young
|
|
|
wanted a footing inspection,, ok,, but no other inspections until the permit has been picked up after elevation changes approval
|
OVERRIDE | | | 5/18/2015 | | |
|
|
|
|
Plan assigned to (JG) | 5/14/2015 | 5/14/2015 | 5/18/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 5/14/2015 | | 5/18/2015 | | PASS |
Javier Guzman
|
|
|
|
Telephone call | | | 5/18/2015 | | DONE |
|
|
|
called GC- left message that plan mod was ready and fees due
|
Plan Reviewer's activity | | | 5/18/2015 | | DONE |
Javier Guzman
|
|
|
Asked Davis Moser if the plans need to be routed to him and he said no need to route back to planning
|
Case Summary (BLD) | | | 5/18/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2015 | | DONE |
|
|
|
DO NOT REISSUE!!!! PLAN MOD ONLY
|
BLD-Footing | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | NR |
Tony Young
|
|
|
###-####-Andrew-they would like as soon possible
|
Plan Modification Accepted | | | 5/14/2015 | | DONE |
|
|
|
Elevation plans (pages 10 & 11)
|
PubWorks Subgrade Approval | 5/12/2015 | 5/12/2015 | 5/12/2015 | | DONE |
Jason C. Taylor
|
|
|
* FOOTINGS ONLY* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 5/5/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 5/4/2015 | | |
|
|
|
|
Plan assigned to (PEP) | 4/22/2015 | 4/22/2015 | 5/4/2015 | | DONE |
Perry Paine
|
|
|
|
Telephone call | | | 5/4/2015 | | DONE |
|
|
|
notified customer of the fees due for the full project
|
Routing - PLAN CHECK | | | 5/4/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - Erosion and Sediment | 5/4/2015 | | 5/4/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 5015 sq. ft., two story (main level 2643 sq. ft., basement 1419 sq. ft. (with 953 sq. ft. of unfinished basement 2 - separate rooms for storage and mechanical equipment.) single family dwelling with 4 bedrooms, 4 bathrooms, approximately 286 sq. ft. of covered patio/porch and a 902 sq. ft. attached garage
|
Plan resubmittals received | | | 5/4/2015 | | DONE |
|
|
|
Two copies of L1.1,L1.5, L1.6, and L2.1. Taken to Evan
|
Routing - Erosion and Sediment | 5/4/2015 | | 5/4/2015 | | PASS |
Evan Jenkins
|
|
|
per approval stamp on ESCplan
|
Inspection Record Card- Bld | | | 5/4/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/4/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 5/4/2015 | | DONE |
|
|
|
All Requirements Met
|
1st review completed | | | 5/4/2015 | | DONE |
Perry Paine
|
|
|
|
Routing - PLANNING | 5/1/2015 | | 5/1/2015 | | PASS |
David Moser
|
|
|
Approved as Redined; the chimney height shall be reduced to 35 feet as measured from adjacent grade
|
Plan assigned to (JG) | | 4/13/2015 | 4/22/2015 | | DEFR |
Javier Guzman
|
|
|
4/29 W L2 Hilside** take to DEM for redlines on chimney
|
Routing - MECHANICAL | 4/20/2015 | | 4/20/2015 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 4/16/2015 | | 4/16/2015 | | PASS |
Scott Arellano
|
|
|
Approved as shown. This structure has been evaluated for fire department vehicle access and is additionally subject to the defensible space provisions of the BMC 7-01-69 section 4920.
|
Routing - MECHANICAL | | | 4/16/2015 | | FAIL |
Troy James
|
|
|
emailed correction to ultimate heating
|
Routing - PLANNING | 4/14/2015 | | 4/14/2015 | | FAIL |
David Moser
|
|
|
Failed because the chimney exceeds the height of the A-1 zone. The chimney height is about 39 feet as measured from adjacent grade and the max height of the zone is 35 feet.
|
Routing - Addressing | 4/13/2015 | | 4/14/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 4/14/2015 | | 4/14/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 4/13/2015 | | 4/14/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 4/13/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/13/2015 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/13/2015 | | DONE |
|
|
|
|
Application received | | 4/13/2015 | | | |
|
|
|
|