BLD-Final | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Tony Young
|
|
|
Jason Phone #: ###-####,, bond is in place
|
PubWorks Occupancy Approval | 8/12/2016 | 8/12/2016 | 8/12/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | NR |
Tony Young
|
|
|
Jason Phone #: ###-####,, walk through only,, need tempered glass in stairwell,, need PW hillside
|
BLD-Wall Bracing | 6/7/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Tony Young
|
|
|
interior shear,, Jason// please call before Phone #: ###-####
|
BLD-Other | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PART |
Tony Young
|
|
|
soffits,, Jason// please call before Phone #: ###-####,, work in progress,, ok
|
BLD-Energy code compliance | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | DONE |
Tony Young
|
|
|
Jason// please call before Phone #: ###-####,, soffits,, work in progress,, ok
|
BLD-Energy code compliance | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Phil Shearer
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | PART |
Tony Young
|
|
|
Jason Phone #: ###-####,, ok to insulate,, need a fix on rear deck support,, missed layout
|
BLD-Wall Bracing | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Tony Young
|
|
|
Shear // Jason Phone #: ###-####,, exterior shear ok
|
Plan Modification Accepted | | | 5/20/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 5/20/2016 | | 5/20/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
Case Summary (BLD) | | | 3/11/2016 | | DONE |
|
|
|
|
BLD-Foundation | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | PASS |
Tony Young
|
|
|
all foundations complete now
|
BLD-Foundation | 2/26/2016 | 2/29/2016 | 2/29/2016 | A | PART |
Dave Hannah
|
|
|
Pat Phone #: ###-#### upper foundation walls ok to place
|
BLD-Footing | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, poured
|
BLD-Foundation | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, walls on same footings
|
BLD-Footing | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, lower ftgs ok to pour
|
BLD-Conference | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | PART |
Tony Young
|
|
|
Jason-please call 1 hour prior to meet Phone #: ###-####,, met with Contractor and Bob Arnold the soils engineer,, e-mail on how to fix problem and on site evaluation.. can procede with lower footings after cleaning loose mud out and water in lower footings// drain collection designed for any spring water from upper area
|
BLD-Footing | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | FAIL |
Tony Young
|
|
|
Pat Phone #: ###-####,, need to have engineer address the spring water coming into area,, too much water in footing area to pour unless ok'd by engineer
|
PubWorks Subgrade Approval | 10/20/2015 | 10/20/2015 | 10/20/2015 | | DONE |
Jason C. Taylor
|
|
|
**FOUNDATION ELEMENTS ONLY***NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 10/1/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/1/2015 | | DONE |
|
|
|
|
Telephone call | | | 9/30/2015 | | DONE |
|
|
|
Called Steve to let know the permit will expire in 11 days, he is out of the office. Spoke with Linda and she informed me that they will most likely be picking up the permit in a day or two.
|
Expiration Notice | 9/16/2015 | 10/7/2015 | 9/16/2015 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 8/27/2015 | | |
|
|
|
|
Telephone call | | | 8/27/2015 | | DONE |
|
|
|
Left a message infromint GC that the permit is ready to be picked up. The confussing was from of course ePlan not know that the permit was never picked up and that whole permit is ready to go and informed them the fee amount due for it all
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/2015 | | DONE |
|
|
|
1 hr plan review for modification
|
Telephone call | | | 8/27/2015 | | DONE |
|
|
|
Informed them that $92.62 was needed to be paid for the reubmittal, verify fees. They asked about the $52.50 and informed them that was because they changed the RP on their ESC permit
|
Permit Ready to Issue | | | 8/27/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Plan assigned to (LEG) Tisha | 8/25/2015 | | 8/27/2015 | | DONE |
Tisha Gallop
|
|
|
plan mod 8/25
|
Routing - PLAN CHECK | 8/25/2015 | | 8/27/2015 | | PASS |
Tisha Gallop
|
|
|
plan modifiation to add 45 sq. feet to basement floor plan, 48 sq ft to main level floor, in basement remove studio and reloate bed #2, main floor small change to mudroom, pantry and kitchen. The deck on the main floor is now uncovered.
|
Routing - PLANNING | 8/25/2015 | | 8/26/2015 | | PASS |
Ted Vanegas
|
|
|
|
Plan Modification Accepted | | | 8/25/2015 | | DONE |
Christina Prado
|
|
|
Plan mod accepted by new GC for changes to the original floor plan
|
OVERRIDE | | | 7/6/2015 | | |
|
|
|
|
Routing - MECHANICAL | 7/2/2015 | | 7/6/2015 | | PASS |
Troy James
|
|
|
Manual j report approved per management request.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (LEG) Tisha | 4/20/2015 | | 7/6/2015 | | DONE |
Tisha Gallop
|
|
|
1st review 5/5; plan check, mech
|
Routing - MECHANICAL | 7/1/2015 | | 7/1/2015 | | FAIL |
Chad Schwendiman
|
|
|
System 1 furnace is oversized. Only allowed to be 100% oversized.
|
Plan resubmittals received | | | 7/1/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 6/29/2015 | | 6/29/2015 | | FAIL |
Troy James
|
|
|
system 1 furnace cfm design is still incorrect
|
Routing - MECHANICAL | 6/17/2015 | | 6/19/2015 | | FAIL |
Troy James
|
|
|
emailed scott with legends mechanical
|
Plan resubmittals received | | | 6/17/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/8/2015 | | 6/11/2015 | | PASS |
Tisha Gallop
|
|
|
(failed mechanical)
|
Routing - MECHANICAL | 6/8/2015 | | 6/9/2015 | | FAIL |
Troy James
|
|
|
per ePlan
|
Plan resubmittals received | | | 6/8/2015 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 5/5/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 4/20/2015 | | 5/5/2015 | | FAIL |
Tisha Gallop
|
|
|
see changemarks
|
Plan assigned to (JG) | 4/20/2015 | 4/20/2015 | 5/1/2015 | | DEFR |
Javier Guzman
|
|
|
5/06 W L2 Hillside ePlan***
|
Routing - FIRE | 4/20/2015 | 4/20/2015 | 4/27/2015 | | PASS |
Scott Arellano
|
|
|
No comments
|
Routing - MECHANICAL | 4/20/2015 | | 4/22/2015 | | FAIL |
Chad Schwendiman
|
|
|
1. Need to change the construction quality to semi tight.
2. Furnace for system #1 is to large, the furnace is not allowed to be more than 100% oversized.
3. The condensor for system #1 is to small to handle the cooling load.
|
Routing - PUBLIC WORKS | 4/20/2015 | | 4/21/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | 4/20/2015 | | 4/21/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Erosion and Sediment | 4/20/2015 | | 4/20/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
The construction of a new 3,853 sq. ft., three story (main level 1,932 sq. ft., second level 632 sq. ft. and finished basement 1,289) single family dwelling with 4 bedrooms, 3 and a half bathrooms, approximately 629 sq. ft. of covered patio/porch and a 660 sq. ft. attached garage
|
Routing - PLANNING | 4/20/2015 | | 4/20/2015 | | PASS |
Ted Vanegas
|
|
|
|
Routing - Addressing | 4/20/2015 | | 4/20/2015 | | PASS |
Emily Dixon
|
|
|
|
Application received | | | 4/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 14 2015 8:29AM
|