Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01173
StatusIssued
Name TRADEWINDS GENERAL CONTRACTING INC
Site Address 1108 E HEARTHSTONE DR
Project NamePendal Vista
Customer Number 
ePlanReviewYes
Description
WUI Zone A; Permit for the construction of a new 3,853 sq. ft., three story (main level 1,932 sq. ft., second level 632 sq. ft. and finished basement 1,289) single family dwelling with 4 bedrooms, 3 and a half bathrooms, approximately 600 sq. ft. of covered patio/porch and a 660 sq. ft. attached garage per the approved plans, Engineering, ResCheck, ACCA report and any notations. R-1B zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/11/20168/12/20168/12/2016APASS
DetailsTony Young
Jason Phone #: ###-####,, bond is in place
PubWorks Occupancy Approval8/12/20168/12/20168/12/2016 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final8/11/20168/11/20168/11/2016PNR
DetailsTony Young
Jason Phone #: ###-####,, walk through only,, need tempered glass in stairwell,, need PW hillside
BLD-Wall Bracing6/7/20166/8/20166/8/2016PPASS
DetailsTony Young
interior shear,, Jason// please call before Phone #: ###-####
BLD-Other6/7/20166/8/20166/8/2016APART
DetailsTony Young
soffits,, Jason// please call before Phone #: ###-####,, work in progress,, ok
BLD-Energy code compliance6/6/20166/7/20166/7/2016ADONE
DetailsTony Young
Jason// please call before Phone #: ###-####,, soffits,, work in progress,, ok
BLD-Energy code compliance5/31/20165/31/20165/31/2016PPASS
DetailsPhil Shearer
Jason Phone #: ###-####
BLD-Framing/Rough-in5/25/20165/25/20165/25/2016PPART
DetailsTony Young
Jason Phone #: ###-####,, ok to insulate,, need a fix on rear deck support,, missed layout
BLD-Wall Bracing5/20/20165/20/20165/20/2016PPASS
DetailsTony Young
Shear // Jason Phone #: ###-####,, exterior shear ok
Plan Modification Accepted  5/20/2016 DONE
new manual j report
Routing - MECHANICAL5/20/2016 5/20/2016 PASS
DetailsTroy James
resubmitted manual j report
Case Summary (BLD)  3/11/2016 DONE
BLD-Foundation3/10/20163/10/20163/10/2016PPASS
DetailsTony Young
all foundations complete now
BLD-Foundation2/26/20162/29/20162/29/2016APART
DetailsDave Hannah
Pat Phone #: ###-#### upper foundation walls ok to place
BLD-Footing2/24/20162/24/20162/24/2016PPART
DetailsTony Young
Pat Phone #: ###-####,, poured
BLD-Foundation2/4/20162/4/20162/4/2016PPART
DetailsTony Young
Pat Phone #: ###-####,, walls on same footings
BLD-Footing12/18/201512/18/201512/18/2015PPART
DetailsTony Young
Pat Phone #: ###-####,, lower ftgs ok to pour
BLD-Conference12/14/201512/14/201512/14/2015PPART
DetailsTony Young
Jason-please call 1 hour prior to meet Phone #: ###-####,, met with Contractor and Bob Arnold the soils engineer,, e-mail on how to fix problem and on site evaluation.. can procede with lower footings after cleaning loose mud out and water in lower footings// drain collection designed for any spring water from upper area
BLD-Footing11/12/201511/12/201511/12/2015PFAIL
DetailsTony Young
Pat Phone #: ###-####,, need to have engineer address the spring water coming into area,, too much water in footing area to pour unless ok'd by engineer
PubWorks Subgrade Approval10/20/201510/20/201510/20/2015 DONE
DetailsJason C. Taylor
**FOUNDATION ELEMENTS ONLY***NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  10/1/2015 DONE
Inspection Record Card- Bld  10/1/2015 DONE
Telephone call  9/30/2015 DONE
Called Steve to let know the permit will expire in 11 days, he is out of the office. Spoke with Linda and she informed me that they will most likely be picking up the permit in a day or two.
Expiration Notice9/16/201510/7/20159/16/2015 DONE
DetailsBrittany Hill
OVERRIDE  8/27/2015  
Telephone call  8/27/2015 DONE
Left a message infromint GC that the permit is ready to be picked up. The confussing was from of course ePlan not know that the permit was never picked up and that whole permit is ready to go and informed them the fee amount due for it all
PLANS/APPL TAKEN TO FRONT DESK  8/27/2015 DONE
1 hr plan review for modification
Telephone call  8/27/2015 DONE
Informed them that $92.62 was needed to be paid for the reubmittal, verify fees. They asked about the $52.50 and informed them that was because they changed the RP on their ESC permit
Permit Ready to Issue  8/27/2015 DONE
ALL REQUIREMENTS MET
Plan assigned to (LEG) Tisha8/25/2015 8/27/2015 DONE
DetailsTisha Gallop
plan mod 8/25
Routing - PLAN CHECK8/25/2015 8/27/2015 PASS
DetailsTisha Gallop
plan modifiation to add 45 sq. feet to basement floor plan, 48 sq ft to main level floor, in basement remove studio and reloate bed #2, main floor small change to mudroom, pantry and kitchen. The deck on the main floor is now uncovered.
Routing - PLANNING8/25/2015 8/26/2015 PASS
DetailsTed Vanegas
Plan Modification Accepted  8/25/2015 DONE
DetailsChristina Prado
Plan mod accepted by new GC for changes to the original floor plan
OVERRIDE  7/6/2015  
Routing - MECHANICAL7/2/2015 7/6/2015 PASS
DetailsTroy James
Manual j report approved per management request.
PLANS/APPL TAKEN TO FRONT DESK  7/6/2015 DONE
Permit Ready to Issue  7/6/2015 DONE
DetailsChristina Prado
All requirements met
Plan assigned to (LEG) Tisha4/20/2015 7/6/2015 DONE
DetailsTisha Gallop
1st review 5/5; plan check, mech
Routing - MECHANICAL7/1/2015 7/1/2015 FAIL
DetailsChad Schwendiman
System 1 furnace is oversized. Only allowed to be 100% oversized.
Plan resubmittals received  7/1/2015 DONE
Routing - MECHANICAL6/29/2015 6/29/2015 FAIL
DetailsTroy James
system 1 furnace cfm design is still incorrect
Routing - MECHANICAL6/17/2015 6/19/2015 FAIL
DetailsTroy James
emailed scott with legends mechanical
Plan resubmittals received  6/17/2015 DONE
Routing - PLAN CHECK6/8/2015 6/11/2015 PASS
DetailsTisha Gallop
(failed mechanical)
Routing - MECHANICAL6/8/2015 6/9/2015 FAIL
DetailsTroy James
per ePlan
Plan resubmittals received  6/8/2015 DONE
DetailsTisha Gallop
1st review completed  5/5/2015 FAIL
DetailsTisha Gallop
Routing - PLAN CHECK4/20/2015 5/5/2015 FAIL
DetailsTisha Gallop
see changemarks
Plan assigned to (JG)4/20/20154/20/20155/1/2015 DEFR
DetailsJavier Guzman
5/06 W L2 Hillside ePlan***
Routing - FIRE4/20/20154/20/20154/27/2015 PASS
DetailsScott Arellano
No comments
Routing - MECHANICAL4/20/2015 4/22/2015 FAIL
DetailsChad Schwendiman
1. Need to change the construction quality to semi tight.
2. Furnace for system #1 is to large, the furnace is not allowed to be more than 100% oversized.
3. The condensor for system #1 is to small to handle the cooling load.
Routing - PUBLIC WORKS4/20/2015 4/21/2015 PASS
DetailsJennifer Bruner
Routing PW Grading-Hillside4/20/2015 4/21/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

Routing - Erosion and Sediment4/20/2015 4/20/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

The construction of a new 3,853 sq. ft., three story (main level 1,932 sq. ft., second level 632 sq. ft. and finished basement 1,289) single family dwelling with 4 bedrooms, 3 and a half bathrooms, approximately 629 sq. ft. of covered patio/porch and a 660 sq. ft. attached garage
Routing - PLANNING4/20/2015 4/20/2015 PASS
DetailsTed Vanegas
Routing - Addressing4/20/2015 4/20/2015 PASS
DetailsEmily Dixon
Application received  4/14/2015 DONE
Application submitted via PDS Online on Apr 14 2015 8:29AM