Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD15-01177
StatusIssued
Name INTEGRITY CONSTRUCTION LLC
Site Address 4226 W EDGEMONT ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the placement of a new inground vinyl lined swimming pool of 648s.f. in the R-1C setbacks approved by Colleen Carroll. The project will also include a new pool equipment structure with code complying shower and watercloset. Hillside drainage plan waived due to the non slope of the parcel. All material will be removed from the front and no water feature is in jeopary, at this time an ESC plan is not reqiuired. A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor 384-3946. All per the approved plaot plan and pool details. pep

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing7/14/20157/15/20157/15/2015PPART
DetailsJim Sly
Jack Phone #: ###-####
Footing and Stem wall OK............Except grounding needs to be approved by Electrical inspector prior to pouring concrete.
BLD-Foundation7/13/20157/14/20157/14/2015PCANC
DetailsJim Sly
Rich Phone #: ###-####
BLD-Other6/1/20156/1/20156/9/2015PCANC
DetailsJim Sly
Colar // Scott Phone #: ###-####
Routing Walk-In (Zoning)4/14/20154/14/20154/14/2015ADONE
DetailsJason C. Taylor
Routing Walk-In (PW Hillside)4/14/20154/14/20154/14/2015APASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor ###-####.

Routing Walk-In (BLD)4/14/20154/14/20154/14/2015ADONE
DetailsPerry Paine
Inspection Record Card- Bld  4/14/2015  
1st review completed  4/14/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/14/2015 DONE
Permit Ready to Issue  4/14/2015 DONE
Issue PAID IN FULL permit  4/14/2015 DONE
Application received 4/14/2015