Second Notice | | 9/25/2015 | 9/21/2015 | | DONE |
|
|
|
This permit finaled on the web by matthew greenman
|
First Notice | | 9/5/2015 | 9/15/2015 | | DONE |
|
|
|
Mailed 9/16/15
|
Permanent Occupancy | | | 8/26/2015 | | DONE |
|
|
|
|
BLD-Final | 8/11/2015 | 8/12/2015 | 8/12/2015 | P | PASS |
Mike Jordan
|
|
|
Please call for access. Thanks Phone #: ###-#### Inspection requested via web by matthew greenman. OK for perm occ. No mech. work. Ceiling grid and diffusers remained in place.
|
FIRE-Final Inspection | 8/11/2015 | 8/12/2015 | 8/12/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | CANC |
Katie Marron
|
|
|
Rescheduled in order to have personnel on site to test smoke evacuation system. Also bathroom door handle to be changed to lever.
|
BLD-Final | 8/10/2015 | 8/11/2015 | 8/11/2015 | P | CANC |
Mike Jordan
|
|
|
Please call for access
Thanks Phone #: ###-#### >> Inspection requested via web by matthew greenman Inspection cancelled from web by: matthew greenman
|
BLD-Framing/Rough-in | 7/15/2015 | 7/16/2015 | 7/16/2015 | A | PASS |
Mike Jordan
|
|
|
Please call for access thanks Phone #: ###-#### Inspection requested via web by matthew greenman
|
BLD-Framing/Rough-in | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | NR |
Mike Jordan
|
|
|
Please call prior for access thanks Phone #: ###-#### Inspection requested via web by matthew greenman. Needs electrical rough in forst.
|
Print Occupancy Form | | | 6/18/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/17/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/17/2015 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 5/6/2015 | 5/6/2015 | 6/5/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Level 3 TI - ePlanReview - AT&T in Mall
|
Routing - PLAN CHECK | 6/3/2015 | | 6/5/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/5/2015 | | DONE |
Christina Prado
|
|
|
Need G.C. form
All requirements met
|
Routing - PLAN CHECK | 5/6/2015 | | 5/19/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 5/19/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 5/6/2015 | 5/6/2015 | 5/13/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Intake Approval | | | 5/6/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Sam Zahorka and plan review fees paid.
|
Pending Assignment by JCB | 5/6/2015 | | 5/6/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 4/21/2015 | | FAIL |
Sam Zahorka
|
|
|
|
Plan Reviewer's activity | | | 4/21/2015 | | DONE |
Sam Zahorka
|
|
|
Please provide the following information:
1. Please provide the #520 - Major Tenant Improvement Submittal Checklist. This checklist must be completed. This checklist not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed. (Note: Additional missing items might be identified once this checklist is provided.)
2. Please re-upload all documents and drawings sheets idividually. Please place the documents in the documents folder and the drawings in the drawings folder.
3. Please see the File naming Standards and rename sheets.
See - http://pds.cityofboise.org/media/105041/electronicstandards.pdf
4. Please provide a 4"X4" blank space located 3" off the lower right hand corner for the City approval stamp on the Cover Sheet.
5. Please provide a 4"X2" blank space located 3" off the lower right hand corner for the City approval stamp on the drawing Sheets.
6. Please provide form #304 Registered Design Professional Form.
7. This is not an all-inclusive Pre-Screen Review. Additional missing items might not be listed here. I have tried my best to indentify all needed items without the Plan Intake Submittal Checklist be submitted.
If assistance is needed please call me directly at ###-####. Thanks Sam Zahorka
|
Application received | | | 4/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 14 2015 1:31PM
|