Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01189
StatusFinaled
Name HC COMPANY INC
Site Address 365 N WHITEWATER PARK BLVD
Project NameWhitewater Clubhouse Remodel
Customer Number 
ePlanReviewYes
Description
(WHITEWATER CLUBHOUSE REMODEL AND ADDITION) This building does not have a fire sprinkler system. To remodel and construct additions to an existing clubhouse that serves an existing apartment complex. To construct a 392 square foot 1st story infill addition, two new canopies (473 sq. ft. and 399 sq. ft.), and a new 1,363 square foot 2nd story addition within the existing gym. After the work is completed, this building will have a total floor area of about 11,239 square feet (9,876 square foot 1st story and 1,363 square foot 2nd story). Work is to include sheet steel roof coverings, rough-sawn cedar barn siding, hardboard board and batten siding and trims, two interior stairways, interior nonbearing walls, a double sided gas fireplace in an exterior wall, millwork, and finishes. Structural work includes concrete footings, concrete piers, concrete stem walls, wood beams, wood shear walls, hold downs, steel columns, steel beams, wood floor diaphragm with TJI floor joists, wood bearing walls, and engineered wood scissor trusses. Special Inspection is required for concrete, welding, bolting, and epoxy anchors. The truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/17/20161/17/2016 DONE
This permit finaled on the web by Jeremy Barber
Second Notice 12/20/20151/12/2016 DONE
mailed 1-13-16
First Notice 11/30/201512/10/2015 DONE
Mailed 12-11-15
BLD-Final11/20/201511/20/201511/20/2015PPASS
DetailsTony Young
Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen
Permanent Occupancy  11/20/2015 DONE
FIRE-Final Inspection11/19/201511/19/201511/19/2015PPASS
DetailsJim Page
No fire sprinklers associated with this project, no fire alarms associated with this project. Life fire safety inspection passed/complete.
Zoning Approval11/19/201511/19/201511/19/2015 PASS
DetailsJosh Wilson
BLD-Energy code compliance9/23/20159/24/20159/24/2015APASS
DetailsJim Sly
Jody Phone #: ###-####
BLD-Framing/Rough-in9/15/20159/15/20159/15/2015APART
DetailsPhil Shearer
Review stairs and handrail oprions. Please call Nic half an hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen. Interior nonbearing walls
BLD-Framing/Rough-in9/11/20159/11/20159/11/2015PPART
DetailsJim Storey
Framing Inspection. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen interior sheer nailling ok/ stair rise and run not corect/
BLD-Framing/Rough-in9/2/20159/2/20159/3/2015PPASS
DetailsDave Hannah
Shear wall inspection in gym. Please call Nic half hour before inspection. Prefer late pm if possible. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen
BLD-Footing8/5/20158/5/20158/6/2015PPART
DetailsDave Hannah
Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen ok after mti spec inspection sign off
BLD-Footing7/23/20157/24/20157/24/2015PPEND
DetailsDave Hannah
rebar, 2:00PM pour time; Chris Phone #: ###-#### ok after spec inspection signs off
Issue PAID IN FULL permit  7/6/2015 DONE
Print Occupancy Form  7/6/2015 DONE
OVERRIDE  6/3/2015  
OVERRIDE  6/3/2015  
CHANGE STATUS TO (FEE)  6/3/2015 DONE
Permit Ready to Issue  6/3/2015 DONE
DetailsChristina Prado
All requirements met////
Need G.C. form, Responsible Person, & Revised Certificate of Value
Routing - PLAN CHECK6/2/2015 6/3/2015 PASS
DetailsCarl Westfall
Beam analysis provided. Drawings approved with redlines
PLANS/APPL TAKEN TO FRONT DESK  6/3/2015 DONE
Plan assigned to (CJW)4/16/2015 6/3/2015 PASS
DetailsCarl Westfall
WHITEWATER CLUBHOUSE REMODEL (15 days - May 4) Level 3 - ePlan
Routing - PLAN CHECK6/1/2015 6/2/2015 FAIL
DetailsCarl Westfall
Emailed Matt Rhees, Architect. Hope to resolve this without failing the 3rd review. Need an analysis of a beam that represents the actual conditons.
Plan resubmittals received  6/1/2015 DONE
Telephone call  5/22/2015 DONE
Called the Architect. Decided to add a changemark and send the work flow back to the Architect.
Plan resubmittals requested  5/22/2015 DONE
Routing - MECHANICAL5/19/2015 5/21/2015 PASS
DetailsTroy James
Telephone call  5/19/2015 DONE
Called the Engineer of Record to discuss the 2 remaining items. Thought they would be resolved quickly and without further discussion so no changemarks were added. On 5-22-15 decided to add a changemark and send the work flow back to the Architect.
Routing - PLAN CHECK5/19/2015 5/19/2015 FAIL
DetailsCarl Westfall
Two structural items still need to be resolved.
Plan resubmittals received  5/18/2015 DONE
Route to Impact Fee Review5/8/20155/11/20155/12/2015 PASS
DetailsCindy M. Gould
1st review completed  5/8/2015 DONE
Plan resubmittals requested  5/8/2015 DONE
Routing - FIRE4/16/2015 5/6/2015 PASS
DetailsScott Arellano
Attached Fire Code comments to plans.
Routing - PLAN CHECK4/16/2015 5/5/2015 FAIL
DetailsCarl Westfall
See the plan review report
Routing - MECHANICAL4/16/2015 4/22/2015 FAIL
DetailsTroy James
eplan
Routing - Erosion and Sediment4/16/2015 4/20/2015 PASS
DetailsEvan Jenkins
Remodel and addition to an existing apartment complex clubhouse. T.I including removal of concrete, demo parts of building, addition of new sidewalk.
Routing - PUBLIC WORKS4/16/2015 4/17/2015 PASS
DetailsBeverly Mountain
Routing - Design Review4/16/2015 4/17/2015 PASS
DetailsJosh Wilson
Pending Assignment by JCB4/15/2015 4/16/2015 DONE
DetailsCarl Westfall
Routing - Addressing4/16/2015 4/16/2015 PASS
DetailsEmily Dixon
Intake Approval  4/15/2015 PASS
DetailsCarl D Madsen
Plan intake by Carl Madsen
Application received  4/14/2015 DONE
Application submitted via PDS Online on Apr 14 2015 4:28PM