Case Summary (BLD) | | | 5/10/2016 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 4/29/2016 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 4/20/2016 | 4/20/2016 | 4/20/2016 | | DONE |
Jason C. Taylor
|
|
|
Project completed bond many be returned. Jason Taylor ###-####.
|
BLD-Final | 11/2/2015 | 11/3/2015 | 11/6/2015 | A | DONE |
Dave Hannah
|
|
|
Home is complete. Grading, drainage and re-vegetation has been bonded. Garage access is 0713. thanks. steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Final | 11/4/2015 | 11/5/2015 | 11/5/2015 | A | PASS |
Jim Storey
|
|
|
Garage access code: 0713 Phone #: ###-#### Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 11/5/2015 | 11/5/2015 | 11/5/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 11/4/2015 | 11/4/2015 | 11/4/2015 | A | FAIL |
Jim Storey
|
|
|
Home is complete. Grading and Drainage has been bonded to allow added time for landscaping. Garage access 0713 or 4444. Call with questions. thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson need handrail under stair/ pw bond ok
|
PubWorks Occupancy Approval | 11/4/2015 | 11/4/2015 | 11/4/2015 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Conference | 8/12/2015 | 8/13/2015 | 8/14/2015 | A | PASS |
Dave Hannah
|
|
|
What is the process to have one hour WUI inspected to confirm lighting boxes and sheetrock install properly? I do not see a specific inspection for this? Please educate me. Phone #: ###-#### Inspection requested via web by Andrew George soffits and con light boxs ok ok to cover
|
BLD-Energy code compliance | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | PASS |
Dave Hannah
|
|
|
The truss package engineering was recalculated and amended for tile roof and corrections made as per previous inspection so need to approve corrections and insulation for cover Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Framing/Rough-in | 7/27/2015 | 7/27/2015 | 7/27/2015 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George,, correction notice written on the back of truss engineering,, ok to insulate,, c/n is top plate straps, truss repairs,, truss bearing,, hanger nailing, dead load on trusses.. justify
|
BLD-Wall Bracing | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 7/23/2015 | 7/23/2015 | 7/23/2015 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George
|
Plan Modification Accepted | | | 7/17/2015 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 7/17/2015 | | 7/17/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 6/16/2015 | 6/16/2015 | 6/16/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 6/15/2015 | 6/15/2015 | 6/15/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 6/3/2015 | 6/3/2015 | 6/3/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Inspection Record Card- Bld | | | 5/26/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/26/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 5/22/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2015 | | DONE |
|
|
|
|
Telephone call | | | 5/22/2015 | | DONE |
|
|
|
Notified customer that plans are ready and there are fees due
|
Routing - PLAN CHECK | 5/20/2015 | | 5/22/2015 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/22/2015 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 5/22/2015 | | DONE |
|
|
|
requirements met
|
Plan assigned to (LEG) Tisha | 4/24/2015 | | 5/22/2015 | | DONE |
Tisha Gallop
|
|
|
1st review 4/27, plan check (hillside)
|
Plan resubmittals received | | | 5/21/2015 | | DONE |
|
|
|
resubmittals received2 of each sheet1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 & 12-took to Tisha
|
Plan resubmittals received | | | 5/20/2015 | | DONE |
|
|
|
received two copies of sheets 5,7,& 8 and two sets of structural calcs- put on Tisha's desk
|
1st review completed | | | 4/27/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | | | 4/27/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Plan assigned to (JG) | | 4/15/2015 | 4/24/2015 | | DEFR |
Javier Guzman
|
|
|
5/01 F L2 Hillside**
|
Routing - FIRE | 4/20/2015 | 4/15/2015 | 4/24/2015 | | PASS |
Scott Arellano
|
|
|
A resolution was passed by council removing the fire sprinkler requirment for Lot 17, Block 6 of Nativa Terra Sub #4 on 07-14-15 (See Documents) TRF
____________________________________________________
Nativa Terra #4. Per plat note 12, this lot is required to be Fire Sprinklered in accordance with NFPA 13D. A separate fire sprinkler permit will be required.
|
Routing - Erosion and Sediment | 4/20/2015 | | 4/20/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A, Class A roof, Permit for the construction of a new 3589 sq. ft., two story (first story 2669 sq. ft., second story 925 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 1227 sq. ft. of covered patio’s/porches and 813 sq. ft. attached garage
|
Routing - MECHANICAL | 4/17/2015 | | 4/20/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/17/2015 | | 4/17/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 4/16/2015 | | 4/17/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | | | 4/16/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 4/15/2015 | | 4/16/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/15/2015 | | DONE |
|
|
|
|
Intake Approval | | | 4/15/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/15/2015 | | DONE |
|
|
|
|
Application received | | 4/15/2015 | | | |
|
|
|
|