Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD15-01207
StatusFinaled
Name SLETTEN CONSTRUCTION
Site Address 8300 W OVERLAND RD
Project NameWalmart
Customer NumberBLD15-00981
ePlanReviewYes
Description
(WALMART**RACKING**)Plan Modification to add minor racking layout changes 9/17/15 ajs*** and Building permit under BLD15-00981.Permit to up to ten foot tall storage racking in an existing retail store in specific areas as noted on approved plans. . Work to include: installation of prefabricated racks up to 10 foot tall including seismic bolting to existing slab. Approval of this permit is contingent on adhering to approved plans and engineering. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. (Special inspections on the anchor bolts are required per ICC/ESR - 2526)**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice11/4/201511/4/201511/9/2015 DONE
DetailsMike Jordan
Mailed 11-10-15
BLD-Final11/4/201511/4/201511/4/2015PPASS
DetailsMike Jordan
jerry Phone #: ###-####
DOC - Permit Finaled11/4/201511/4/201511/4/2015PPASS
DetailsMike Jordan
FIRE-Final Inspection11/3/201511/4/201511/4/2015APASS
DetailsTroy Cobbley
life safety passed
CHANGE STATUS TO (ISS)  10/1/2015 DONE
(F) Reprint permit  10/1/2015 DONE
Routing - FIRE9/22/20159/22/20159/22/2015 PASS
DetailsTim Frost
Plan assigned to (AJS)9/14/20159/14/20159/22/2015 PASS
DetailsAdele J Schaffeld-Griffin
My review completed Plan Mod - ePlan - Wal-Mart Racking
PLANS/APPL TAKEN TO FRONT DESK  9/22/2015 DONE
Permit Ready to Issue  9/22/2015 DONE
DO NOT RE-ISSUE PLAN MOD
Routing - PLAN CHECK9/14/2015 9/17/2015 PASS
DetailsAdele J Schaffeld-Griffin
Plan Modification Accepted  9/14/2015 DONE
per AJS- started workflow in Eplan
CHANGE STATUS TO (ISS)  9/10/2015 DONE
(F) Reprint permit  9/10/2015 DONE
Plan assigned to (AJS)8/19/20158/19/20158/19/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK8/19/2015 8/19/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  8/19/2015 DONE
Permit Ready to Issue  8/19/2015 DONE
DO NOT RE-ISSUE PLAN MOD
Plan assigned to (AJS)8/4/20158/4/20158/14/2015 PASS
DetailsAdele J Schaffeld-Griffin
Plan Mod - ePlanReview - Wal-Mart Racking
Routing - PLAN CHECK8/4/2015 8/6/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE8/4/20158/4/20158/5/2015 PASS
DetailsScott Arellano
Revisions reviewed for fire code compliance. No updated report required.
Plan Modification Accepted  8/5/2015 DONE
DetailsCarlos Velazquez
(8/4/15 PLAN MODIFICATION - Racking changes)
Issue PAID IN FULL permit  7/1/2015 DONE
Plan assigned to (AJS)6/5/20156/5/20156/15/2015 PASS
DetailsAdele J Schaffeld-Griffin
Level 2 TI - ePlanReview - Racking in Walmart
Routing - FIRE6/5/20156/5/20156/15/2015 PASS
DetailsKatie Marron
Comments attached to case
1st review completed  6/15/2015 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/15/2015 DONE
Meeting  6/15/2015 DONE
as per Adele and Rita ok to group both permits BLD15-00981 and BLD15-01207
Permit Ready to Issue  6/15/2015 DONE
need GC form
Routing - PLAN CHECK6/5/2015 6/15/2015 PASS
DetailsAdele J Schaffeld-Griffin
Pending Assignment by JCB6/5/2015 6/5/2015 DONE
DetailsJason Blais
Intake Approval  6/3/2015 PASS
DetailsJason Blais
Prescreen approved by Tim Frost and plan review fees paid.
Application received  4/15/2015 DONE
Application submitted via PDS Online on Apr 15 2015 2:30PM