BLD-Final | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | PASS |
Dave Hannah
|
|
|
Mark Phone #: ###-####
|
DOC - Permit Finaled | 1/21/2016 | 1/21/2016 | 1/21/2016 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 1/15/2016 | 1/15/2016 | 1/15/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
Case Summary (BLD) | | | 1/14/2016 | | DONE |
|
|
|
|
BLD-Foundation | 8/4/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Dave Hannah
|
|
|
Rebar pool // Mark Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/9/2015 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 7/6/2015 | | |
|
|
|
|
Plan assigned to (JG) | 6/10/2015 | 6/10/2015 | 7/6/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, Pending Hillside ans ESC (SWIMMING POOL)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2015 | | DONE |
Christina Prado
|
|
|
All requirements met///7/8/15
Need Rp for issuance
|
Routing PW Grading-Hillside | 7/1/2015 | | 7/1/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing - Erosion and Sediment | 6/25/2015 | | 6/25/2015 | | PASS |
Evan Jenkins
|
|
|
Inground 18'x42', 8'ft deep swimming pool with automatic safety cover on Hillside lot
|
Routing - Erosion and Sediment | 6/10/2015 | | 6/10/2015 | | FAIL |
Evan Jenkins
|
|
|
Full Erosion and Sediment Control Narrative and Site Map Required for Approval, Per BCC 8-17 for Approval.
Evan Jenkins 794.3958
|
Routing - PLAN CHECK | 6/10/2015 | | 6/10/2015 | | PASS |
Javier Guzman
|
|
|
Pending others
|
Routing - PLANNING | 6/10/2015 | | 6/10/2015 | | PASS |
Sue Cummings
|
|
|
|
Routing - Erosion and Sediment | 6/10/2015 | | 6/10/2015 | | FAIL |
Evan Jenkins
|
|
|
failed in ePlan by Evan Jenkins
|
Routing PW Grading-Hillside | 6/10/2015 | | 6/10/2015 | | FAIL |
Jason C. Taylor
|
|
|
Geotechncial engineers approval for location of pool and rock structure adjacent to existing retaining wall. Please have MTI perform an analysis and upload to permit.
Jason Taylor ###-####
|
Plan assigned to (PEP) | 4/16/2015 | | 6/10/2015 | | DEFR |
Perry Paine
|
|
|
Perry wrote need engineering, ESC planning and grading corrections, per Jason Blais (Javier, Please take over this case from Perry in ePlanReview – BLD15-01218 and process right away. Determine status etc… Looks like it has been sitting in our ePlanReview queue for a while. Resubmit Received task has been reassigned to you to route and review. Jason)
|
Routing Walk-In (BLD) | 4/22/2015 | 4/22/2015 | 4/22/2015 | A | FAIL |
Perry Paine
|
|
|
needto resubmit ESC plan and Narritive and grading resubmittal.
|
Routing Walk-In (Zoning) | 4/20/2015 | 4/20/2015 | 4/22/2015 | A | DONE |
Perry Paine
|
|
|
Still needs Hillside review and other Department reviews
|
Routing PW Grading-Hillside | 4/16/2015 | | 4/22/2015 | | FAIL |
Jason C. Taylor
|
|
|
Need revised plans and geotech report. Jason Taylor ###-####
|
Routing - Erosion and Sediment | 4/20/2015 | | 4/20/2015 | | FAIL |
Evan Jenkins
|
|
|
Still Need Full ESC Narrative and Site Maps for Review and Approval
|
Application received | | | 4/16/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 16 2015 11:26AM
|
Routing Walk-In (BLD) | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | FAIL |
Perry Paine
|
|
|
|
1st review completed | | | 4/16/2015 | | FAIL |
|
|
|
need hillside engineering plus ESC, planning and grading corrections.
|
Routing - PLAN CHECK | 4/16/2015 | | 4/16/2015 | | FAIL |
Perry Paine
|
|
|
need other division signoffs
|
Plans ACCEPTED BY PLAN TECH | | | 4/16/2015 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/16/2015 | | DONE |
|
|
|
|
Intake Approval | | | 4/16/2015 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 4/16/2015 | | 4/16/2015 | | FAIL |
Evan Jenkins
|
|
|
Full Erosion & Sediment Control Plan Narrative and Site Maps Required for Approval. ESC Waiver Request Denied due to amount of excavation.
Inground 18'x42', 8'ft deep swimming pool with automatic safety cover on Hillside lot
|
Routing - PLANNING | 4/16/2015 | | | | FAIL |
Colleen T Carroll
|
|
|
Needs Hillside Review
|