BLD-Final | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PART |
Jim Sly
|
|
|
Steve Phone #: ###-#### 2nd floor beam and joists ......OK.
|
BLD-Conference | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | DONE |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
Routing Walk-In (BLD) | 5/7/2015 | 5/7/2015 | 5/7/2015 | A | PASS |
Perry Paine
|
|
|
looked at beam / floor joist loading.
|
Routing Walk-In (Zoning) | 4/20/2015 | 4/20/2015 | 4/20/2015 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 4/20/2015 | 4/20/2015 | 4/20/2015 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 4/20/2015 | 4/20/2015 | 4/20/2015 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 4/20/2015 | | |
|
|
|
|
1st review completed | | | 4/20/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/20/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/20/2015 | | DONE |
|
|
|
|
BLD-Final | 9/22/2015 | 9/23/2015 | | A | |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
Application received | | 4/20/2015 | | | |
|
|
|
|