Second Notice | | 4/22/2016 | 4/26/2016 | | DONE |
|
|
|
This permit finaled on the web by Chrisie Paiz
|
First Notice | | 2/13/2016 | 4/12/2016 | | DONE |
|
|
|
Mailed 4-13-16
|
Permanent Occupancy | | | 2/3/2016 | | DONE |
|
|
|
|
Zoning Approval | 2/2/2016 | 2/2/2016 | 2/2/2016 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 12/10/2015 | 12/11/2015 | 12/11/2015 | A | PASS |
Dave Hannah
|
|
|
James Phone #: ###-#### ok for perm occ
|
OVERRIDE | | | 12/8/2015 | | |
|
|
|
|
OVERRIDE | | | 12/8/2015 | | |
|
|
|
|
BLD-Final | 12/8/2015 | 12/8/2015 | 12/8/2015 | P | PART |
Mike Jordan
|
|
|
Temp only - James Phone #: ###-####. Ok for temp occ. Self service counters more than the 34 inch max height allowed, restroom mirrors bottom edge greater than 40 inches max allowable height. Contractor to provide documentation showing that locking hardware is ADA compliant on restroom doors.
|
Temporary Occupancy | 12/8/2015 | 3/7/2016 | 12/8/2015 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (REV) | | | 12/8/2015 | | DONE |
Christina Prado
|
|
|
Plan mod in review, temp CO issued in meantime
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/8/2015 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 12/7/2015 | | 12/8/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 12/7/2015 | | 12/8/2015 | | PASS |
Tim L. Woodard
|
|
|
Approved Mod to remove a window. Verified with Planning DR was updated. I did not route this as a Plan Mod nor did I charge any fees based on no review being required. We just wanted updated drawings. Those drawings were moved to the "Approved Folder" in E-Plan. TLW
|
BLD-Final | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-####. Needs zoning final.
|
FIRE-Final Inspection | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval Temp | 12/7/2015 | 12/7/2015 | 12/7/2015 | | DONE |
Andrea Tuning
|
|
|
The applicant will be required to complete the landscaping and modify the building permit package to reflect the removal of one window on the east elevation.
|
Plan Modification Accepted | | | 12/7/2015 | | |
|
|
|
|
FIRE-Final Inspection | 12/3/2015 | 12/4/2015 | 12/4/2015 | P | FAIL |
Troy Cobbley
|
|
|
The sign and door lock are done but the duct smoke detectors will not be ready until Monday
|
PubWorks Occupancy Approval | 12/4/2015 | 12/4/2015 | 12/4/2015 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide fire access signage as discussed, remove the deadbolt at door 113, provide modifications to the duct smoke detectors as discussed and test.
|
BLD-Ceiling Grid Inspection | 11/24/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####
|
FIRE-Final Inspection | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide city approved notes, provide address, provide all doors/hardware, install and provide testing of all exit signs and emergency lights, provide testing of the duct smoke detectors (incorrect remote annunciators have been provided), provide approval from plan review for keyed deadbolt at door 113.
|
BLD-Ceiling Grid Inspection | 11/17/2015 | 11/18/2015 | 11/18/2015 | P | PART |
Jim Sly
|
|
|
James Phone #: ###-#### Front 1/2f
|
BLD-Ceiling Grid Inspection | 11/9/2015 | 11/9/2015 | 11/9/2015 | P | PASS |
Mike Jordan
|
|
|
would like call ahead; James Phone #: ###-####. Grid in play area only ok.
|
BLD-Framing/Rough-in | 10/21/2015 | 10/21/2015 | 10/21/2015 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Exterior canopies ok.
|
BLD-Energy code compliance | 10/13/2015 | 10/14/2015 | 10/14/2015 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Energy code compliance | 10/13/2015 | 10/13/2015 | 10/13/2015 | P | PART |
Mike Jordan
|
|
|
Needs to complete insulation at electrical room wall and complete foam seal on top plates for fireblock.
|
BLD-Energy code compliance | 10/12/2015 | 10/13/2015 | 10/13/2015 | A | NR |
Mike Jordan
|
|
|
James Phone #: ###-####. MOved to pm.
|
BLD-Energy code compliance | 10/8/2015 | 10/12/2015 | 10/12/2015 | A | PART |
Mike Jordan
|
|
|
James Phone #: ###-####. Airseal only.
|
BLD-Framing/Rough-in | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Wall Bracing | 9/17/2015 | 9/17/2015 | 9/17/2015 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Exterior shear ok.
|
BLD-Wall Bracing | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | FAIL |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Other | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | DEFR |
Mike Jordan
|
|
|
rebar; James Phone #: ###-####. special inspector on site.
|
BLD-Concrete | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. perimeter footings ok.
|
Issue PAID IN FULL permit | | | 6/25/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/25/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/19/2015 | 6/24/2015 | 6/19/2015 | | PASS |
Cindy M. Gould
|
|
|
|
OVERRIDE | | | 5/28/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 5/28/2015 | | DONE |
Christina Prado
|
|
|
Need GC Form, Rp, Revised Certificate of Value & ACHD-- RP met on 6-18-15 KRS... ALL REQUIRMENTS MET 6/24/15 ///CEV
|
Plan resubmittals received | | | 5/27/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/27/2015 | | 5/27/2015 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 5/27/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2015 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 4/21/2015 | | 5/27/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - MECHANICAL | 5/14/2015 | | 5/14/2015 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 5/14/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/21/2015 | | 5/11/2015 | | FAIL |
Tim L. Woodard
|
|
|
Refer to changemarks in e-plan. TLW
|
Routing PW Drainage | 4/22/2015 | | 5/5/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - MECHANICAL | 4/21/2015 | | 4/29/2015 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 4/21/2015 | | 4/27/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing PW Solid Waste | 4/22/2015 | | 4/27/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Environmental | 4/22/2015 | | 4/24/2015 | | PASS |
Rick Christenson
|
|
|
1250 Gallon Exterior interceptor is minimum allowed for approval.
|
Routing PW Sewer Design | 4/22/2015 | | 4/24/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Design Review | 4/21/2015 | | 4/24/2015 | | PASS |
Andrea Tuning
|
|
|
DRH15-00061
|
Routing - PLUMBING | 4/21/2015 | | 4/23/2015 | | PASS |
Bill VanDegrift
|
|
|
1) sewer may need to be schedule at water service crossong
2) vent downstream of interceptor
3) prine trap in storage
4) pipe 2" RPZ discharge over hub drain to accept full discharge.
|
Routing PW Sewer Rating | 4/22/2015 | | 4/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLANNING | 4/21/2015 | | 4/22/2015 | | PASS |
Leon Letson
|
|
|
CUP15-00004. Approved in E-Plan. TLW
|
Routing - PLANNING Land Div | 4/21/2015 | | 4/22/2015 | | PASS |
Todd Tucker
|
|
|
Approved in E-Plan. TLW
|
Routing - Addressing | 4/21/2015 | | 4/22/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/21/2015 | | 4/22/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 4/21/2015 | | 4/22/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
As for the wet road: The are utilizing water to keep dust down, and aid their sweeping process, which is on a 3 times per day schedule. Jim Pickard drove by today as well, and had no issue. There is nothing in any City Code/Ordinance that deals with "Hauling" rules and regulations. All drop Inlets are protected and are regularly maintained to reduce any potential of discharge into the MS4.
|
Routing Off Site - STRUCTURAL | 4/21/2015 | | 4/22/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Street Lights | 4/22/2015 | | 4/22/2015 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Intake Approval | | | 4/21/2015 | | PASS |
Sam Zahorka
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/21/2015 | | DONE |
|
|
|
|
Application received | | | 4/20/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 20 2015 1:38PM
|