**1/28/16 Plan modification to change tall crawl space into mechanical room (conditioned, 415 sq. ft.) within same footprint and alter garage door opening//leg **9/15/15 Plan modification to add retaining wall for pool//leg** WUI Zone A, Class A roof, Permit for the construction of a new 7,283 sq. ft., two level (main level 4,868 sq. ft., daylight basement level is 2,415 sq. ft.) single family dwelling with 7 bedrooms, 6.5 bathrooms, approximately 1,600 sq. ft. of covered patio’s/porches and 1412 sq. ft. attached garage per the approved plans, Engineering, ResCheck, ACCA report and any notations. R-1A/DA zoning and setbacks per planning. THIS HOUSE IS REQUIRED TO BE FIRE SPRINKERED. //leg A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/12/20168/15/20168/15/2016APASS
DetailsPhil Shearer
Rick Phone #: ###-####
DOC - Permit Finaled8/15/20168/15/20168/15/2016PPASS
DetailsPhil Shearer
Letter of compliance/Occupancy  8/15/2016 DONE
customer requested c of o
PubWorks Occupancy Approval8/12/20168/12/20168/12/2016 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final8/11/20168/12/20168/11/2016ANR
DetailsPhil Shearer
Request storm drain system inspection and walk thru with Jason Taylor Phone #: ###-#### Inspection requested via web by Robert Hunter
BLD-Conference7/19/20167/20/20167/20/2016ADONE
DetailsPhil Shearer
Rick Phone #: ###-####
BLD-Aging Inspection6/24/20166/24/20166/24/2016 PEND
DetailsPhil Shearer
BLD-Aging Inspection6/23/20166/23/20166/23/2016 PEND
DetailsPhil Shearer
BLD-Other3/14/20163/14/20163/14/2016PPASS
DetailsPhil Shearer
Please call 30min ahead for access - fire rated exterior sheetrock - Rick Phone #: ###-####
BLD-Framing/Rough-in2/9/20162/10/20162/10/2016APASS
DetailsPhil Shearer
Late morning - Rick Phone #: ###-####
BLD-Energy code compliance2/10/20162/10/20162/10/2016PPASS
DetailsPhil Shearer
Late morning - Rick Phone #: ###-####
BLD-Framing/Rough-in2/9/20162/9/20162/9/2016PCANC
DetailsPhil Shearer
Rick-as late today as possible Phone #: ###-####
BLD-Framing/Rough-in2/1/20162/2/20162/2/2016PPASS
DetailsPhil Shearer
Rick Phone #: ###-####
BLD-Framing/Rough-in2/1/20162/1/20162/1/2016PPART
DetailsPhil Shearer
Rick Phone #: ###-####
OVERRIDE  1/29/2016  
(F) Reprint permit  1/29/2016 DONE
CHANGE STATUS TO (ISS)  1/29/2016 DONE
Routing - MECHANICAL1/29/2016 1/29/2016 PASS
DetailsTroy James
Revised manual j report. Builder changed a portion of crawl area to conditioned space.
PLANS/APPL TAKEN TO FRONT DESK  1/29/2016 DONE
plan mod fee for additional value of new living square footage
Permit Ready to Issue  1/29/2016 DONE
DetailsChristina Prado
DO NOT RE-ISSUE

All requirements met for Plan Mod - Must pay additional review fees prior to changing status to ISS
Plan assigned to (LEG) Tisha1/26/2016 1/29/2016 DONE
DetailsTisha Gallop
Routing - PLAN CHECK1/28/2016 1/28/2016 PASS
DetailsTisha Gallop
Plan Modification Accepted  1/26/2016 DONE
To modify the basement plan to change mechanical room to crawl access
BLD-Wall Bracing12/18/201512/21/201512/21/2015APART
DetailsPhil Shearer
Shear // Rick Phone #: ###-####. Exterior only OK to wrap
BLD-Wall Bracing12/18/201512/18/201512/18/2015PNR
DetailsTony Young
Shear // Rick Phone #: ###-####,, walk through only,,, some covered,, ok,,, just needs tuned up in some areas
BLD-Footing9/25/20159/25/20159/25/2015APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Ben Sears
OVERRIDE  9/15/2015  
CHANGE STATUS TO (ISS)  9/15/2015 DONE
plan mod approved, no fee due
Plan assigned to (LEG) Tisha8/31/2015 9/15/2015 DONE
DetailsTisha Gallop
plan mod to add pool ret. wall; need to start ePlan modification and upload new site plan showing wall location. received paper copy of structural calcs and I will upload for them. 9/2
Routing - PLAN CHECK8/31/2015 9/15/2015 PASS
DetailsTisha Gallop
plan mod to add engineered retaining wall for pool. One drawing, pool wall calcs, pool wall e-mail.
Permit Ready to Issue  9/15/2015 DONE
no fees due per LEG
Plan resubmittals received  9/8/2015 DONE
DetailsTisha Gallop
received foundation plan sheet for pool wall//uploaded into eplan for customer
Telephone call  9/2/2015 DONE
DetailsTisha Gallop
called Bob Hunter @ Visser Bldg Co. told him need new engineered foundation plan for new retaining wall to show location and length of wall on property.
Plan resubmittals received  9/1/2015 DONE
engineering calcs for additional retaining wall
Plan Modification Accepted  8/31/2015 DONE
DetailsChristina Prado
Received two sets of revised structural cals for footing changes from Visser Bldg; Cals taken to LEG for further review and processing
BLD-Foundation8/28/20158/28/20158/28/2015PPASS
DetailsPhil Shearer
Ben Phone #: ###-####
BLD-Foundation8/20/20158/20/20158/20/2015PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Ben Sears. Retaining wall
BLD-Conference8/11/20158/11/20158/11/2015PDONE
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing8/11/20158/11/20158/11/2015PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Ben Sears. south west and south west garage footing and west retaining wall fooings.
BLD-Footing8/10/20158/10/20158/10/2015PCANC
DetailsPhil Shearer
Requesting a late inspection. No pour today. Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing7/31/20157/31/20157/31/2015PPART
DetailsPhil Shearer
Tim Phone #: ###-####
BLD-Foundation7/27/20157/28/20157/28/2015APASS
DetailsPhil Shearer
Request early inspection. Phone #: ###-#### Inspection requested via web by Ben Sears
PubWorks Subgrade Approval7/20/20157/20/20157/20/2015 DONE
DetailsJason C. Taylor
***GARAGE AND RETAINING WALLS ON THE SOUTH, WEST AND NRTH SIDES OF RESIDENCE***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing7/15/20157/15/20157/15/2015APASS
DetailsPhil Shearer
NORTH SIDE FOOTINGS
BLD-Footing7/14/20157/14/20157/14/2015PNR
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Ben Sears
PubWorks Subgrade Approval7/14/20157/14/20157/14/2015 DONE
DetailsJason C. Taylor
*NORTH SIDE FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing7/8/20157/8/20157/8/2015PNR
DetailsPhil Shearer
Request inspection later in afternoon. Not pouring today Phone #: ###-#### Inspection requested via web by Ben Sears
Issue PAID IN FULL permit  6/29/2015 DONE
Inspection Record Card- Bld  6/29/2015 DONE
OVERRIDE  6/16/2015  
PLANS/APPL TAKEN TO FRONT DESK  6/16/2015 DONE
Permit Ready to Issue  6/16/2015 DONE
all requirments met
Plan assigned to (LEG) Tisha4/23/2015 6/16/2015 DONE
DetailsTisha Gallop
1st review 5/8 L2; plan check, hillside
Routing PW Grading-Hillside6/4/2015 6/15/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PLAN CHECK6/4/2015 6/4/2015 PASS
DetailsTisha Gallop
Plan resubmittals received  6/3/2015 DONE
DetailsTisha Gallop
1st review completed  5/8/2015 FAIL
DetailsTisha Gallop
Routing - PLAN CHECK4/23/2015 5/8/2015 FAIL
DetailsTisha Gallop
Routing - FIRE5/5/20155/5/20155/5/2015 PASS
DetailsScott Arellano
Attached revised comments to plans.
Routing - FIRE4/23/20154/23/20155/4/2015 FAIL
DetailsScott Arellano
Emailed plan review report to applicant. Attached report to case.
Plan assigned to (JG)4/23/20154/23/20155/1/2015 DEFR
DetailsJavier Guzman
5/11 M L2 Hillside 7k ePlan**
Routing - MECHANICAL4/23/2015 4/28/2015 PASS
DetailsTroy James
Routing - PLANNING4/23/2015 4/28/2015 PASS
DetailsLeon Letson
per ePlan
Routing PW Grading-Hillside4/23/2015 4/27/2015 FAIL
DetailsJason C. Taylor
Please submit scaled full size set to E-Plan. Jason Taylor ###-####.
Routing - Erosion and Sediment4/23/2015 4/23/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

WUI Zone A, Class A roof, Permit for the construction of a new 7440 sq. ft., two story (first story 4867 sq. ft., basement is 2573 sq. ft.) single family dwelling with 7 bedrooms, 6.5 bathrooms, approximately 669 sq. ft. of covered patio’s/porches and 1412 sq. ft. attached garage
Routing - Addressing4/23/2015 4/23/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS4/23/2015 4/23/2015 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  4/23/2015 DONE
Recd Pcfee & Taken To Pln CK  4/23/2015 DONE
Intake Approval  4/23/2015 PASS
Application received  4/22/2015 DONE
Application submitted via PDS Online on Apr 22 2015 12:29PM