BLD-Final | 8/12/2016 | 8/15/2016 | 8/15/2016 | A | PASS |
Phil Shearer
|
|
|
Rick Phone #: ###-####
|
DOC - Permit Finaled | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Phil Shearer
|
|
|
|
Letter of compliance/Occupancy | | | 8/15/2016 | | DONE |
|
|
|
customer requested c of o
|
PubWorks Occupancy Approval | 8/12/2016 | 8/12/2016 | 8/12/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 8/11/2016 | 8/12/2016 | 8/11/2016 | A | NR |
Phil Shearer
|
|
|
Request storm drain system inspection and walk thru with Jason Taylor Phone #: ###-#### Inspection requested via web by Robert Hunter
|
BLD-Conference | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | DONE |
Phil Shearer
|
|
|
Rick Phone #: ###-####
|
BLD-Aging Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 6/23/2016 | 6/23/2016 | 6/23/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Other | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
Phil Shearer
|
|
|
Please call 30min ahead for access - fire rated exterior sheetrock - Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 2/9/2016 | 2/10/2016 | 2/10/2016 | A | PASS |
Phil Shearer
|
|
|
Late morning - Rick Phone #: ###-####
|
BLD-Energy code compliance | 2/10/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Phil Shearer
|
|
|
Late morning - Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | CANC |
Phil Shearer
|
|
|
Rick-as late today as possible Phone #: ###-####
|
BLD-Framing/Rough-in | 2/1/2016 | 2/2/2016 | 2/2/2016 | P | PASS |
Phil Shearer
|
|
|
Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | PART |
Phil Shearer
|
|
|
Rick Phone #: ###-####
|
OVERRIDE | | | 1/29/2016 | | |
|
|
|
|
(F) Reprint permit | | | 1/29/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/29/2016 | | DONE |
|
|
|
|
Routing - MECHANICAL | 1/29/2016 | | 1/29/2016 | | PASS |
Troy James
|
|
|
Revised manual j report. Builder changed a portion of crawl area to conditioned space.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2016 | | DONE |
|
|
|
plan mod fee for additional value of new living square footage
|
Permit Ready to Issue | | | 1/29/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE
All requirements met for Plan Mod - Must pay additional review fees prior to changing status to ISS
|
Plan assigned to (LEG) Tisha | 1/26/2016 | | 1/29/2016 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 1/28/2016 | | 1/28/2016 | | PASS |
Tisha Gallop
|
|
|
|
Plan Modification Accepted | | | 1/26/2016 | | DONE |
|
|
|
To modify the basement plan to change mechanical room to crawl access
|
BLD-Wall Bracing | 12/18/2015 | 12/21/2015 | 12/21/2015 | A | PART |
Phil Shearer
|
|
|
Shear // Rick Phone #: ###-####. Exterior only OK to wrap
|
BLD-Wall Bracing | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | NR |
Tony Young
|
|
|
Shear // Rick Phone #: ###-####,, walk through only,,, some covered,, ok,,, just needs tuned up in some areas
|
BLD-Footing | 9/25/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
OVERRIDE | | | 9/15/2015 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/15/2015 | | DONE |
|
|
|
plan mod approved, no fee due
|
Plan assigned to (LEG) Tisha | 8/31/2015 | | 9/15/2015 | | DONE |
Tisha Gallop
|
|
|
plan mod to add pool ret. wall; need to start ePlan modification and upload new site plan showing wall location. received paper copy of structural calcs and I will upload for them. 9/2
|
Routing - PLAN CHECK | 8/31/2015 | | 9/15/2015 | | PASS |
Tisha Gallop
|
|
|
plan mod to add engineered retaining wall for pool. One drawing, pool wall calcs, pool wall e-mail.
|
Permit Ready to Issue | | | 9/15/2015 | | DONE |
|
|
|
no fees due per LEG
|
Plan resubmittals received | | | 9/8/2015 | | DONE |
Tisha Gallop
|
|
|
received foundation plan sheet for pool wall//uploaded into eplan for customer
|
Telephone call | | | 9/2/2015 | | DONE |
Tisha Gallop
|
|
|
called Bob Hunter @ Visser Bldg Co. told him need new engineered foundation plan for new retaining wall to show location and length of wall on property.
|
Plan resubmittals received | | | 9/1/2015 | | DONE |
|
|
|
engineering calcs for additional retaining wall
|
Plan Modification Accepted | | | 8/31/2015 | | DONE |
Christina Prado
|
|
|
Received two sets of revised structural cals for footing changes from Visser Bldg; Cals taken to LEG for further review and processing
|
BLD-Foundation | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | PASS |
Phil Shearer
|
|
|
Ben Phone #: ###-####
|
BLD-Foundation | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears. Retaining wall
|
BLD-Conference | 8/11/2015 | 8/11/2015 | 8/11/2015 | P | DONE |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 8/11/2015 | 8/11/2015 | 8/11/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears. south west and south west garage footing and west retaining wall fooings.
|
BLD-Footing | 8/10/2015 | 8/10/2015 | 8/10/2015 | P | CANC |
Phil Shearer
|
|
|
Requesting a late inspection. No pour today. Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PART |
Phil Shearer
|
|
|
Tim Phone #: ###-####
|
BLD-Foundation | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Phil Shearer
|
|
|
Request early inspection. Phone #: ###-#### Inspection requested via web by Ben Sears
|
PubWorks Subgrade Approval | 7/20/2015 | 7/20/2015 | 7/20/2015 | | DONE |
Jason C. Taylor
|
|
|
***GARAGE AND RETAINING WALLS ON THE SOUTH, WEST AND NRTH SIDES OF RESIDENCE***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 7/15/2015 | 7/15/2015 | 7/15/2015 | A | PASS |
Phil Shearer
|
|
|
NORTH SIDE FOOTINGS
|
BLD-Footing | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | NR |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
PubWorks Subgrade Approval | 7/14/2015 | 7/14/2015 | 7/14/2015 | | DONE |
Jason C. Taylor
|
|
|
*NORTH SIDE FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | NR |
Phil Shearer
|
|
|
Request inspection later in afternoon. Not pouring today Phone #: ###-#### Inspection requested via web by Ben Sears
|
Issue PAID IN FULL permit | | | 6/29/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/29/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/16/2015 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/16/2015 | | DONE |
|
|
|
all requirments met
|
Plan assigned to (LEG) Tisha | 4/23/2015 | | 6/16/2015 | | DONE |
Tisha Gallop
|
|
|
1st review 5/8 L2; plan check, hillside
|
Routing PW Grading-Hillside | 6/4/2015 | | 6/15/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 6/4/2015 | | 6/4/2015 | | PASS |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 6/3/2015 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 5/8/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 4/23/2015 | | 5/8/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - FIRE | 5/5/2015 | 5/5/2015 | 5/5/2015 | | PASS |
Scott Arellano
|
|
|
Attached revised comments to plans.
|
Routing - FIRE | 4/23/2015 | 4/23/2015 | 5/4/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to applicant. Attached report to case.
|
Plan assigned to (JG) | 4/23/2015 | 4/23/2015 | 5/1/2015 | | DEFR |
Javier Guzman
|
|
|
5/11 M L2 Hillside 7k ePlan**
|
Routing - MECHANICAL | 4/23/2015 | | 4/28/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/23/2015 | | 4/28/2015 | | PASS |
Leon Letson
|
|
|
per ePlan
|
Routing PW Grading-Hillside | 4/23/2015 | | 4/27/2015 | | FAIL |
Jason C. Taylor
|
|
|
Please submit scaled full size set to E-Plan. Jason Taylor ###-####.
|
Routing - Erosion and Sediment | 4/23/2015 | | 4/23/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A, Class A roof, Permit for the construction of a new 7440 sq. ft., two story (first story 4867 sq. ft., basement is 2573 sq. ft.) single family dwelling with 7 bedrooms, 6.5 bathrooms, approximately 669 sq. ft. of covered patio’s/porches and 1412 sq. ft. attached garage
|
Routing - Addressing | 4/23/2015 | | 4/23/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/23/2015 | | 4/23/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/23/2015 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/23/2015 | | DONE |
|
|
|
|
Intake Approval | | | 4/23/2015 | | PASS |
|
|
|
|
Application received | | | 4/22/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 22 2015 12:29PM
|