Permit Information
Permit NumberBLD15-01317
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 11321 W CHINDEN BLVD
Project NameHP Building 2 AHU Replacement
Customer Number 
ePlanReviewYes
Description
(HEWLETT PACKARD – MEZZANINE LEVEL – SOUTHEAST AND SOUTHWEST CORNERS OF BUILDING #2 – REPLACEMENT OF AIR HANDLER UNITS) The fire sprinkler system is used for building area increase. The existing Air Handler Units located on the 1st story mezzanine in the Southeast and Southwest corners of Building #2 will be removed and replaced with new units. Pumps for the hydronic system will also be replaced. Horizontal sunscreens will be removed to allow equipment removal and installation and then the sunscreens will be reinstalled. A 4.5 foot by 13 foot enclosed area for a new outside air plenum will be constructed. The plenum will be constructed using 6” metal studs to support 2” thick exterior insulated metal panel siding. An exterior 10” thick concrete slab on grade will be installed in the Southeast corner. Structural work includes supplemental beam framing at new mechanical duct penetrations through existing roofs and a floor. New beams will be provided to support the new exterior wall of the plenum located above. Special Inspection is required for welding and for post installed concrete anchors (expansion, epoxy, etc.). The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/15/20163/14/2016 DONE
This permit finaled on the web by Ami Tracy
Third Notice 2/16/20163/10/2016 DONE
Third Notice 1/18/20162/11/2016 DONE
sent with a letter
Third Notice 12/15/20151/13/2016 DONE
Third Notice 11/14/201512/10/2015 DONE
Second Notice 10/22/201511/9/2015 DONE
sent in mailed
First Notice9/22/20159/22/201510/12/2015 DONE
DetailsJim Sly
sent in mail
Letter of compliance/Occupancy  9/23/2015 DONE
BLD-Final9/21/20159/22/20159/22/2015APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Justin Dayley
DOC - Permit Finaled9/22/20159/22/20159/22/2015PPASS
DetailsJim Sly
BLD-Final9/21/20159/22/20159/21/2015PCANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Justin Dayley Inspection cancelled from web by: Justin Dayley
BLD-Final9/21/20159/21/20159/21/2015PCANC
DetailsMike Jordan
Troy is all finished and we are ready for you Jim if you are over here in the area this morning Phone #: ###-#### >> Inspection requested via web by Justin Dayley Inspection cancelled from web by: Justin Dayley
FIRE-Final Inspection9/18/20159/21/20159/21/2015APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection9/15/20159/18/20159/18/2015ACANC
DetailsTroy Cobbley
Cancel per Justin Dayley
FIRE-Conference9/9/20159/10/20159/10/2015ADONE
DetailsTroy Cobbley
Monty Smith discussed the change out of the duct smoke detectors not requiring permits due to being considered a maintenance issue.
BLD-Framing/Rough-in8/24/20158/25/20158/25/2015PPASS
DetailsJim Sly
Duct shaft wall Phone #: ###-#### Inspection requested via web by Justin Dayley
BLD-Framing/Rough-in8/20/20158/21/20158/21/2015PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Justin Dayley
Issue PAID IN FULL permit  6/12/2015 DONE
Inspection Record Card- Bld  6/12/2015 DONE
Routing - PLAN CHECK6/4/2015 6/8/2015 PASS
DetailsCarl Westfall
Drawings approved
PLANS/APPL TAKEN TO FRONT DESK  6/8/2015 DONE
Permit Ready to Issue  6/8/2015 DONE
NEED GC form
ALL REQUIREMENTS MET
Plan assigned to (CJW)5/7/2015 6/8/2015 PASS
DetailsCarl Westfall
HEWLETT PACKARD - REPLACE AIR HANDLER UNITS (May 15 - 7 days) ePlan
Plan resubmittals received  6/4/2015 DONE
1st review completed  5/19/2015 DONE
Failed building
Plan resubmittals requested  5/19/2015 DONE
Routing - FIRE5/7/2015 5/18/2015 PASS
DetailsScott Arellano
No plan review comments attached to this case. Separate fire protection permits will be required for the necessary modifications of the building fire alarm and fire sprinkler systems as part of the proposed mechanical work.
Routing - PLAN CHECK5/7/2015 5/18/2015 FAIL
DetailsCarl Westfall
Additional information required
Routing - MECHANICAL5/7/2015 5/11/2015 PASS
DetailsTroy James
Routing - PLUMBING5/7/2015 5/8/2015 PASS
DetailsDaryl Spivey
minor plumbing ok
Routing - PUBLIC WORKS5/7/2015 5/8/2015 PASS
DetailsJennifer Bruner
Routing PW Environmental5/8/2015 5/8/2015 PASS
DetailsTerry Alber
No Issues.
Intake Approval  5/7/2015 PASS
Pending Assignment by TLW5/7/2015 5/7/2015 DONE
DetailsTim L. Woodard
Routing - Addressing5/7/2015 5/7/2015 PASS
DetailsEmily Dixon
Application received  4/23/2015 DONE
Application submitted via PDS Online on Apr 23 2015 3:56PM