BLD-Final | 8/5/2015 | 8/6/2015 | 8/6/2015 | P | NR |
Dave Hannah
|
|
|
Call an hour before to meet up // Dan Phone #: ###-#### ceil grid ok
|
FIRE-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | FAIL |
Jim Page
|
|
|
Ceiling tiles are not in place, leaving the CPVC piping in tenant space exposed. Appears that a horn/strobe was added with no FIR permit. General contractor informed me that the horn/strobe was existing but according to the city approved plans, the existing horns/strobes are indicared on the plan, the horn and strobe in questions looks to be a newly installed device, not shown on the demo plan.
|
BLD-Framing/Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Jim Sly
|
|
|
Dan// please call for access Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/6/2015 | | DONE |
|
|
|
all requirements met
|
Telephone call | | | 5/6/2015 | | DONE |
|
|
|
Left message for Bob letting him know that we need a GC Form and Revised Cert of Value
|
Plan assigned to (TLW) | 4/27/2015 | | 5/5/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/27/2015 | | 5/5/2015 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 5/5/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/5/2015 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/27/2015 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/27/2015 | | DONE |
|
|
|
|
Application received | | 4/27/2015 | | | |
|
|
|
|