BLD-Final | 5/11/2016 | 5/12/2016 | 5/11/2016 | A | DONE |
Tony Young
|
|
|
Matt Phone #: ###-####
|
DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 | P | PASS |
Tony Young
|
|
|
done
|
PubWorks Occupancy Approval | 5/11/2016 | 5/11/2016 | 5/11/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
CHANGE STATUS TO (ISS) | | | 5/11/2016 | | DONE |
|
|
|
as per Jason Taylor plan mod complete
|
(F) Reprint permit | | | 5/11/2016 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 3/11/2016 | | 3/15/2016 | | CANC |
Jason C. Taylor
|
|
|
Need engineering submitted for retaining walls. JCT ###-####
|
BLD-Final | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | PART |
Tony Young
|
|
|
Webster Phone #: ###-####,, need plan mod plans...temp occupancy ok..
|
Plan Modification Accepted | | | 3/11/2016 | | DONE |
|
|
|
received (3) copies of grading & drainage permit (L1.1)
|
Case Summary (BLD) | | | 3/2/2016 | | DONE |
|
|
|
|
BLD-Conference | 2/10/2016 | 2/11/2016 | 2/11/2016 | A | PEND |
Tony Young
|
|
|
Dave Phone #: ###-####,, spiral stair ?s
|
BLD-Conference | 2/9/2016 | 2/10/2016 | 2/10/2016 | A | PEND |
Tony Young
|
|
|
Dave Phone #: ###-####,, sent e-mail with spiral stair code
|
BLD-Conference | 2/8/2016 | 2/9/2016 | 2/9/2016 | P | PEND |
Tony Young
|
|
|
Dave Phone #: ###-####,, ?s on spiral stairs,, need to research
|
BLD-Energy code compliance | 11/24/2015 | 11/25/2015 | 11/25/2015 | A | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 11/23/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 11/13/2015 | 11/13/2015 | 11/13/2015 | P | PART |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Provide docmentation showing that roof assembly mettes class A. If not insulating 2nd. floor, provide draft stop in concealed area to portion off less than 1000 s.f. areas. ok to insulate. Correction notice posted.
|
Plan Modification Accepted | | | 11/6/2015 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 11/6/2015 | | 11/6/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####,, exterior shear ok
|
Override - Parcel Holds | 10/7/2015 | 1/1/1900 | 10/7/2015 | | |
|
|
|
Shear wall ONLY
|
BLD-Foundation | 8/31/2015 | 9/1/2015 | 9/1/2015 | A | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####,, deck piers,, spiral stair ftg
|
OVERRIDE | | | 8/21/2015 | | |
|
|
|
|
Plan assigned to (CDM) | 8/12/2015 | 8/12/2015 | 8/21/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/12/2015 | | 8/21/2015 | | PASS |
Carl D Madsen
|
|
|
|
Telephone call | | | 8/21/2015 | | DONE |
|
|
|
called Dave to let know pln mod is ready and how much is owed
|
CHANGE STATUS TO (ISS) | | | 8/21/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/21/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/21/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/21/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 8/21/2015 | | DONE |
|
|
|
plan mod is ready for pick up-pleae do not re issue permit
|
Routing - PLANNING | 8/17/2015 | | 8/17/2015 | | PASS |
Sue Cummings
|
|
|
Reducing size of home. all setbacks meet
|
Plan Modification Accepted | | | 8/12/2015 | | DONE |
|
|
|
received (3) sets; Floor & Roof Truss calculations, Site Plan, Floor Plans, Elevations, Foundations, & Framing Plans
|
BLD-Foundation | 6/18/2015 | 6/19/2015 | 6/19/2015 | A | PART |
Tony Young
|
|
|
Paul Phone #: ###-####,, work in p[rogress
|
BLD-Footing | 6/17/2015 | 6/18/2015 | 6/18/2015 | P | PART |
Tony Young
|
|
|
Paul Phone #: ###-####
|
PubWorks Subgrade Approval | 6/18/2015 | 6/18/2015 | 6/18/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Override - Parcel Holds | | | 6/18/2015 | | |
|
|
|
|
Override - Parcel Holds | 6/17/2015 | 1/1/1900 | 6/17/2015 | | |
|
|
|
Footing ONLY
|
Telephone call | | | 6/2/2015 | | DONE |
|
|
|
called David to let him know we charged impact fees in error and that he is due a refund. Gave him Cindy Gould's email- KRS
|
Override - Parcel Holds | | | 6/1/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/1/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 5/29/2015 | | |
|
|
|
|
Plan assigned to (CDM) | 5/11/2015 | 5/11/2015 | 5/29/2015 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Inspection Record Card- Bld | | | 5/29/2015 | | DONE |
|
|
|
|
Telephone call | | | 5/29/2015 | | DONE |
|
|
|
called David- left message permit is ready for pick up and fees due
|
Routing - PLAN CHECK | 5/29/2015 | | 5/29/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/29/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/29/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 5/29/2015 | | DONE |
|
|
|
All Requirements Met
|
Routing - PLAN CHECK | 5/21/2015 | | 5/28/2015 | | FAIL |
Carl D Madsen
|
|
|
All of the affected sheets reflection the change in the foundation plans do no follow through to the other plan sheets. E-Mailed Dave Webster 5-28-15 7:30 AM CDM
|
Routing - PLANNING | 5/27/2015 | | 5/27/2015 | | PASS |
Sue Cummings
|
|
|
Revised site plan O.K. now 5/27/15
|
Plan resubmittals received | | | 5/27/2015 | | DONE |
|
|
|
received two 8x10 site plan, two engineering letters, and two copies of sheets A-101, S-101, S-105, S-106, S-107, and S-108- put on CDM desk
|
Routing - PUBLIC WORKS | 5/20/2015 | | 5/21/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | 5/19/2015 | | 5/21/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 5/14/2015 | | DONE |
|
|
|
resubmittals received 3 ets of each sheet0S-110, S-111, S-112, L1.1, L2.1, L2.5 2 struc cals & a response letter-took to Carl M
|
Routing - PUBLIC WORKS | 5/13/2015 | | 5/13/2015 | | FAIL |
Jennifer Bruner
|
|
|
|
Routing PW Flood Plain | | | 5/13/2015 | | PASS |
Jim Wyllie
|
|
|
Two more Elevation Certificates are required: one prior to receiving a framing inspection and one based upon finished construction. Jim Wyllie ###-####
|
Routing PW Grading-Hillside | 5/13/2015 | | 5/13/2015 | | FAIL |
Jason C. Taylor
|
|
|
Grading plan elevations do not match the site plan elevations. Plans will need to be revised and re-submitted for approval. Jason Taylor ###-####.
|
Plan assigned to (LEG) Tisha | 4/29/2015 | | 5/11/2015 | | DEFR |
Tisha Gallop
|
|
|
5/15 L2
|
Routing - PLAN CHECK | 5/8/2015 | | 5/11/2015 | | FAIL |
Carl D Madsen
|
|
|
Plan review sent to Gary and David
|
Plan resubmittals received | | | 5/11/2015 | | DONE |
|
|
|
received (2) copies of Elevation Certificate, (2) copies of Site Plan (A-101), (2) copies of Floor Plan (A-103 - A-105)
|
1st review completed | | | 5/11/2015 | | FAIL |
|
|
|
|
Routing - FIRE | 5/7/2015 | 4/29/2015 | 5/8/2015 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 5/6/2015 | | 5/7/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
***existing home****Permit for the construction of a new 5289 sq. ft., two story (first story 2562 sq. ft., second story 1943 sq. ft., third story is 777 sq. ft.) single family dwelling with 5 bedrooms, 4 bathrooms, approximately 897 sq. ft. of covered patio’s/porches and 740 sq. ft. attached garage
|
Routing - MECHANICAL | | | 5/6/2015 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 4/29/2015 | | 5/4/2015 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Jason Taylor for Hillside and Floodplain issues.
|
Routing PW Grading-Hillside | 4/30/2015 | | 5/4/2015 | | FAIL |
Jason C. Taylor
|
|
|
Grading plan should be revised to show correct BFE for floodplain. Please submit new grading plans (3 copies). Jason Taylor ###-####.
|
Plan assigned to (JG) | | 4/29/2015 | 5/1/2015 | | DEFR |
Javier Guzman
|
|
|
|
Routing PW Flood Plain | 4/29/2015 | | 4/30/2015 | | FAIL |
Jim Wyllie
|
|
|
Elevation Certificate submitted is for the existing house which will be demolished . Applicant shall submit a new Elevation Certificate based upon the building plans. BFE for the lot is 2816.7. (Jim Wyllie, ###-####)
|
Plans ACCEPTED BY PLAN TECH | | | 4/29/2015 | | DONE |
|
|
|
|
Intake Approval | | | 4/29/2015 | | PASS |
Jason C. Taylor
|
|
|
as per Jason T and Jim W this is a cat. 1 so no P & Z letter required-as per Evan no seperate narritive needed-whats on the plans are good enough
|
Routing - Addressing | 4/29/2015 | | 4/29/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/28/2015 | | DONE |
|
|
|
|
Application received | | 4/28/2015 | | | |
|
|
|
|
Routing - PLANNING | 5/4/2015 | | | | FAIL |
|
|
|
10 ft. side yard setbacks not met
|
Routing - PLAN CHECK | 5/13/2015 | | | | |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 5/26/2015 | | | | |
|
|
|
Failed again. Building is still inside the 10 foot side setbacks. Left Dave Webster a voice mail. 5/25/15 900 a.m.
|