Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01390
StatusFinaled
Name WEBSTER CONSTRUCTION
Site Address 3124 N CRANE CREEK RD
Project Name 
Customer Number 
ePlanReviewNo
Description
THIS STRUCTURE IS LOCATED IN WUI ZONE A)(SOLAR PANELS NOT APPROVED UNDER THIS PERMIT) PLAN MODIFICATION TO REDUCE THE NUMBER OF STORIES TO 2 AND RECONFIGURE THE SECOND STORY. Permit to demolish existing single family dwelling and the construction of a new 5,016 sq. ft., two story (first story 2536 sq. ft., second story 2480 sq. ft..) single family dwelling with 5 bedrooms, 4 bathrooms, approximately 897 sq. ft. of covered patio’s/porches and 740 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. Two more Elevation Certificates are required: one prior to receiving a framing inspection and one based upon finished construction. Jim Wyllie 384-3925.A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20165/12/20165/11/2016ADONE
DetailsTony Young
Matt Phone #: ###-####
DOC - Permit Finaled5/11/20165/11/20165/11/2016PPASS
DetailsTony Young
done
PubWorks Occupancy Approval5/11/20165/11/20165/11/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.

CHANGE STATUS TO (ISS)  5/11/2016 DONE
as per Jason Taylor plan mod complete
(F) Reprint permit  5/11/2016 DONE
Routing PW Grading-Hillside3/11/2016 3/15/2016 CANC
DetailsJason C. Taylor
Need engineering submitted for retaining walls. JCT ###-####
BLD-Final3/11/20163/11/20163/11/2016PPART
DetailsTony Young
Webster Phone #: ###-####,, need plan mod plans...temp occupancy ok..
Plan Modification Accepted  3/11/2016 DONE
received (3) copies of grading & drainage permit (L1.1)
Case Summary (BLD)  3/2/2016 DONE
BLD-Conference2/10/20162/11/20162/11/2016APEND
DetailsTony Young
Dave Phone #: ###-####,, spiral stair ?s
BLD-Conference2/9/20162/10/20162/10/2016APEND
DetailsTony Young
Dave Phone #: ###-####,, sent e-mail with spiral stair code
BLD-Conference2/8/20162/9/20162/9/2016PPEND
DetailsTony Young
Dave Phone #: ###-####,, ?s on spiral stairs,, need to research
BLD-Energy code compliance11/24/201511/25/201511/25/2015APASS
DetailsTony Young
Matt Phone #: ###-####
BLD-Framing/Rough-in11/23/201511/24/201511/24/2015PPASS
DetailsTony Young
Matt Phone #: ###-####
BLD-Framing/Rough-in11/13/201511/13/201511/13/2015PPART
DetailsMike Jordan
Matt Phone #: ###-####. Provide docmentation showing that roof assembly mettes class A. If not insulating 2nd. floor, provide draft stop in concealed area to portion off less than 1000 s.f. areas. ok to insulate. Correction notice posted.
Plan Modification Accepted  11/6/2015 DONE
new manual j
Routing - MECHANICAL11/6/2015 11/6/2015 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing10/7/201510/7/201510/7/2015PPASS
DetailsTony Young
Matt Phone #: ###-####,, exterior shear ok
Override - Parcel Holds10/7/20151/1/190010/7/2015  
Shear wall ONLY
BLD-Foundation8/31/20159/1/20159/1/2015APASS
DetailsTony Young
Matt Phone #: ###-####,, deck piers,, spiral stair ftg
OVERRIDE  8/21/2015  
Plan assigned to (CDM)8/12/20158/12/20158/21/2015 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK8/12/2015 8/21/2015 PASS
DetailsCarl D Madsen
Telephone call  8/21/2015 DONE
called Dave to let know pln mod is ready and how much is owed
CHANGE STATUS TO (ISS)  8/21/2015 DONE
(F) Reprint permit  8/21/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/21/2015 DONE
Case Summary (BLD)  8/21/2015 DONE
Override - Parcel Holds  8/21/2015  
Permit Ready to Issue  8/21/2015 DONE
plan mod is ready for pick up-pleae do not re issue permit
Routing - PLANNING8/17/2015 8/17/2015 PASS
DetailsSue Cummings
Reducing size of home. all setbacks meet
Plan Modification Accepted  8/12/2015 DONE
received (3) sets; Floor & Roof Truss calculations, Site Plan, Floor Plans, Elevations, Foundations, & Framing Plans
BLD-Foundation6/18/20156/19/20156/19/2015APART
DetailsTony Young
Paul Phone #: ###-####,, work in p[rogress
BLD-Footing6/17/20156/18/20156/18/2015PPART
DetailsTony Young
Paul Phone #: ###-####
PubWorks Subgrade Approval6/18/20156/18/20156/18/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Override - Parcel Holds  6/18/2015  
Override - Parcel Holds6/17/20151/1/19006/17/2015  
Footing ONLY
Telephone call  6/2/2015 DONE
called David to let him know we charged impact fees in error and that he is due a refund. Gave him Cindy Gould's email- KRS
Override - Parcel Holds  6/1/2015  
Issue PAID IN FULL permit  6/1/2015 DONE
OVERRIDE  5/29/2015  
Plan assigned to (CDM)5/11/20155/11/20155/29/2015 PASS
DetailsCarl D Madsen
First review completed
Inspection Record Card- Bld  5/29/2015 DONE
Telephone call  5/29/2015 DONE
called David- left message permit is ready for pick up and fees due
Routing - PLAN CHECK5/29/2015 5/29/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  5/29/2015 DONE
Case Summary (BLD)  5/29/2015 DONE
Override - Parcel Holds  5/29/2015  
Permit Ready to Issue  5/29/2015 DONE
All Requirements Met
Routing - PLAN CHECK5/21/2015 5/28/2015 FAIL
DetailsCarl D Madsen
All of the affected sheets reflection the change in the foundation plans do no follow through to the other plan sheets. E-Mailed Dave Webster 5-28-15 7:30 AM CDM
Routing - PLANNING5/27/2015 5/27/2015 PASS
DetailsSue Cummings
Revised site plan O.K. now 5/27/15
Plan resubmittals received  5/27/2015 DONE
received two 8x10 site plan, two engineering letters, and two copies of sheets A-101, S-101, S-105, S-106, S-107, and S-108- put on CDM desk
Routing - PUBLIC WORKS5/20/2015 5/21/2015 PASS
DetailsJennifer Bruner
Routing PW Grading-Hillside5/19/2015 5/21/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan resubmittals received  5/14/2015 DONE
resubmittals received 3 ets of each sheet0S-110, S-111, S-112, L1.1, L2.1, L2.5 2 struc cals & a response letter-took to Carl M
Routing - PUBLIC WORKS5/13/2015 5/13/2015 FAIL
DetailsJennifer Bruner
Routing PW Flood Plain  5/13/2015 PASS
DetailsJim Wyllie
Two more Elevation Certificates are required: one prior to receiving a framing inspection and one based upon finished construction. Jim Wyllie ###-####
Routing PW Grading-Hillside5/13/2015 5/13/2015 FAIL
DetailsJason C. Taylor
Grading plan elevations do not match the site plan elevations. Plans will need to be revised and re-submitted for approval. Jason Taylor ###-####.
Plan assigned to (LEG) Tisha4/29/2015 5/11/2015 DEFR
DetailsTisha Gallop
5/15 L2
Routing - PLAN CHECK5/8/2015 5/11/2015 FAIL
DetailsCarl D Madsen
Plan review sent to Gary and David
Plan resubmittals received  5/11/2015 DONE
received (2) copies of Elevation Certificate, (2) copies of Site Plan (A-101), (2) copies of Floor Plan (A-103 - A-105)
1st review completed  5/11/2015 FAIL
Routing - FIRE5/7/20154/29/20155/8/2015 PASS
DetailsScott Arellano
No comments.
Routing - Erosion and Sediment5/6/2015 5/7/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

***existing home****Permit for the construction of a new 5289 sq. ft., two story (first story 2562 sq. ft., second story 1943 sq. ft., third story is 777 sq. ft.) single family dwelling with 5 bedrooms, 4 bathrooms, approximately 897 sq. ft. of covered patio’s/porches and 740 sq. ft. attached garage
Routing - MECHANICAL  5/6/2015 PASS
DetailsTroy James
Routing - PUBLIC WORKS4/29/2015 5/4/2015 FAIL
DetailsConnie Baumgartner
Failed by Jason Taylor for Hillside and Floodplain issues.
Routing PW Grading-Hillside4/30/2015 5/4/2015 FAIL
DetailsJason C. Taylor
Grading plan should be revised to show correct BFE for floodplain. Please submit new grading plans (3 copies). Jason Taylor ###-####.
Plan assigned to (JG) 4/29/20155/1/2015 DEFR
DetailsJavier Guzman
Routing PW Flood Plain4/29/2015 4/30/2015 FAIL
DetailsJim Wyllie
Elevation Certificate submitted is for the existing house which will be demolished . Applicant shall submit a new Elevation Certificate based upon the building plans. BFE for the lot is 2816.7. (Jim Wyllie, ###-####)
Plans ACCEPTED BY PLAN TECH  4/29/2015 DONE
Intake Approval  4/29/2015 PASS
DetailsJason C. Taylor
as per Jason T and Jim W this is a cat. 1 so no P & Z letter required-as per Evan no seperate narritive needed-whats on the plans are good enough
Routing - Addressing4/29/2015 4/29/2015 PASS
DetailsJason C. Taylor
Recd Pcfee & Taken To Pln CK  4/28/2015 DONE
Application received 4/28/2015   
Routing - PLANNING5/4/2015   FAIL
10 ft. side yard setbacks not met
Routing - PLAN CHECK5/13/2015    
DetailsCarl D Madsen
Routing - PLANNING5/26/2015    
Failed again. Building is still inside the 10 foot side setbacks. Left Dave Webster a voice mail. 5/25/15 900 a.m.