Permit Information
Permit NumberBLD15-01391
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 9931 W CABLE CAR ST
Project NameUnion Square Retail Bldg #1
Customer Number 
ePlanReviewYes
Description
(UNION SQUARE – Retail Cold Shell #1) Permit is to construct a new 10,640 square foot retail cold shell. This building is required to be fire sprinklered per Fire Code for "Fire Flow". Envelope compliance report approved for Slab edge and openings only. No insulation added under this permit. Approval contingent upon adhering to the approved plans on file, Planning Approvals, and attached engineering. Work to include: [construct new poured concrete foundation, wood frame exterior walls, wood truss system], new electrical (exterior lighting only), new exterior stucco system, and related site improvements. This building will be required a compliant NFPA 13 system be installed prior to finalizing this permit. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/21/20166/14/2016 DONE
This permit finaled on the web by Mike McHargue
First Notice4/19/20164/19/20165/11/2016 DONE
DetailsMike Jordan
Mailed 5-12-16
BLD-Final4/19/20164/19/20164/19/2016PPASS
DetailsMike Jordan
DOC - Permit Finaled4/19/20164/19/20164/19/2016PPASS
DetailsMike Jordan
BLD-Framing/Rough-in4/18/20164/19/20164/19/2016APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mike McHargue. All framing issues have been resolved.
BLD-Final3/30/20163/31/20163/31/2016ANR
DetailsMike Jordan
Shell Final Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Framing/Rough-in3/31/20163/31/20163/31/2016AFAIL
DetailsMike Jordan
Shell Final Phone #: ###-#### Inspection requested via web by Mike McHargue. Nail off 2ply T17 trusses as per the truss engineering. Install all bearing blocks as shown on truss engineering. Noted anchor bolts on base plates for columns not long enough. Also noted thru bolts on beam to beam and beam to column connections are not long enough.
FIRE-Final Inspection3/29/20163/30/20163/30/2016APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection3/29/20163/30/20163/29/2016ACANC
DetailsTroy Cobbley
Retail Building 01 Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
PubWorks Occupancy Approval3/21/20163/21/20163/21/2016 DONE
DetailsTiffany Lowery
BLD-Wall Bracing10/21/201510/22/201510/22/2015PPASS
DetailsMike Jordan
Sheer Phone #: ###-#### Inspection requested via web by Mike McHargue. Exterior shear walls and roof diaphragm ok.
BLD-Energy code compliance8/17/20158/18/20158/18/2015APASS
DetailsMike Jordan
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance8/17/20158/17/20158/17/2015PNR
DetailsMike Jordan
Late PM if possible for foundation insulation inspection. Phone #: ###-#### Inspection requested via web by Mike McHargue. Will reschedule for inspection tomorrow.
BLD-Foundation8/12/20158/12/20158/12/2015PPASS
DetailsMike Jordan
Manuel Phone #: ###-####
BLD-Footing8/10/20158/11/20158/11/2015APASS
DetailsMike Jordan
Manuel Phone #: ###-####
Issue PAID IN FULL permit  7/30/2015 DONE
Print Occupancy Form  7/30/2015 DONE
OVERRIDE  7/22/2015  
Routing - FIRE7/22/20157/22/20157/22/2015 PASS
DetailsKatie Marron
All resubmittals items addressed satisfactory. Revised report attached to case.
Routing - PLAN CHECK7/22/2015 7/22/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/22/2015 DONE
Permit Ready to Issue  7/22/2015 DONE
need GC, rev cert of val, RP & ACHD--- only need ACHD
Routing - PLAN CHECK7/9/2015 7/22/2015 PASS
DetailsTim L. Woodard
Plan assigned to (TLW)5/6/2015 7/22/2015 PASS
DetailsTim L. Woodard
1st Review Complete
Routing PW Sewer Design7/9/2015 7/14/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - FIRE7/9/2015 7/9/2015 FAIL
DetailsScott Arellano
Comments attached to case and emailed to architect.
Routing - PUBLIC WORKS GRADING7/9/2015 7/9/2015 PASS
DetailsBrian Murphy
Plan resubmittals received  7/9/2015 DONE
Routing - Design Review7/9/2015 7/9/2015 PASS
DetailsJosh Wilson
Route to Impact Fee Review5/28/20155/31/20155/29/2015 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK5/6/2015 5/28/2015 FAIL
DetailsTim L. Woodard
Corrections noted as changemarks in E-Plan Review. TLW
Routing - Design Review5/6/2015 5/28/2015 PASS
DetailsJosh Wilson
Approved in E-Plan Review. TLW
Routing Off Site - STRUCTURAL5/6/2015 5/28/2015 PASS
DetailsTim L. Woodard
Routing PW Drainage5/6/2015 5/28/2015 FAIL
DetailsBrian Murphy
3rd seepage bed new swale. Failed in E-Plan Review. TLW
Routing PW Solid Waste5/6/2015 5/28/2015 PASS
DetailsPeter J. McCullough
Approved in E-Plan Review. TLW
1st review completed  5/28/2015 DONE
Routing - FIRE5/6/2015 5/18/2015 FAIL
DetailsScott Arellano
Emailed and faxed architect plan review report. Attached report to case.
Routing PW Sewer Design5/6/2015 5/8/2015 FAIL
DetailsKyle S. Rosenmeyer
Submit request to vacate sewer easement for abandonment of existing line. If an existing sewer service is replaced to the main, contractor shall contact Boise Public works 48 hours prior to sewer work schedule inspection.
Routing - Erosion and Sediment5/6/2015 5/7/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval required prior to earth disturbance)

New Shell and Core Building (Commercial) with utilities
Routing PW Street Lights5/6/2015 5/7/2015 PASS
DetailsMike D Hedge
No street lighting required.
Routing - PLANNING Land Div5/6/2015 5/7/2015 PASS
DetailsTodd Tucker
Routing - PLUMBING5/6/2015 5/6/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing5/6/2015 5/6/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/6/2015 5/6/2015 PASS
DetailsBeverly Mountain
Intake Approval  5/6/2015 PASS
Pending Assignment by TLW5/6/2015 5/6/2015 DONE
DetailsTim L. Woodard
Routing PW Sewer Rating5/6/2015 5/6/2015 PASS
DetailsBeverly Mountain
no plumbing
Intake Approval  5/4/2015 FAIL
Please provide the site drainage and O&M (See the attached changemarks on the checklist).
Application received  4/28/2015 DONE
Application submitted via PDS Online on Apr 28 2015 3:17PM