Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD15-01392
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 9839 W CABLE CAR ST
Project NameUnion Square Office Bldg. #1
Customer Number 
ePlanReviewYes
Description
(UNION SQUARE – Office Cold Shell #1) Permit is to construct a new 6,040 square foot office cold shell. This building is not fire sprinklered. Envelope compliance report approved for Slab edge and openings only. No insulation added under this permit. Approval contingent upon adhering to the approved plans on file, Planning Approvals, and attached engineering. Work to include: [construct new poured concrete foundation, wood frame exterior walls, wood truss system], new electrical (exterior lighting only), new exterior stucco system, and related site improvements. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/22/20164/19/2016 DONE
This permit finaled on the web by Mike McHargue
First Notice3/31/20163/31/20164/12/2016 DONE
DetailsMike Jordan
Mailed 4-13-16
BLD-Final3/30/20163/31/20163/31/2016APASS
DetailsMike Jordan
Shell Final Phone #: ###-#### Inspection requested via web by Mike McHargue
DOC - Permit Finaled3/31/20163/31/20163/31/2016PPASS
DetailsMike Jordan
BLD-Framing/Rough-in3/31/20163/31/20163/31/2016PPASS
DetailsMike Jordan
Shell Final Phone #: ###-#### Inspection requested via web by Mike McHargue. Repairs were made and inspected during framing inspection on tenant improvement framing inspection.
FIRE-Final Inspection3/29/20163/30/20163/30/2016APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval3/23/20163/23/20163/23/2016 PASS
DetailsJosh Wilson
FIRE-Final Inspection3/17/20163/18/20163/18/2016AFAIL
DetailsTroy Cobbley
Provide address facing the street and provide fire dept signage as discussed
BLD-Framing/Rough-in1/20/20161/21/20161/21/2016APART
DetailsMike Jordan
Building Shell - Framing Final Phone #: ###-#### Inspection requested via web by Mike McHargue. Complete lateral bracing on T02 truss, install the required bearing blocks on T05 and T26 trusses.
BLD-Conference1/20/20161/21/20161/20/2016ACANC
DetailsMike Jordan
Building SHELL - Framing Final Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Wall Bracing12/4/201512/4/201512/4/2015PPASS
DetailsMike Jordan
Wall sheer and roof sheer Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Wall Bracing11/24/201511/24/201511/24/2015PFAIL
DetailsMike Jordan
Exterior Sheer / Roof Sheer Phone #: ###-#### Inspection requested via web by Mike McHargue. Needs to install all straps. Also noted several areas on exerior shear that were missed.
BLD-Energy code compliance8/6/20158/7/20158/7/2015PPASS
DetailsMike Jordan
Foundation Insulation, Mike I will be out of town but if anything needs fixed please call Cory, 208 477 0298, with Big City Insulation. Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Foundation8/5/20158/5/20158/5/2015PPASS
DetailsMike Jordan
Manuel Phone #: ###-####
BLD-Footing8/4/20158/4/20158/4/2015PPASS
DetailsMike Jordan
Manuel Phone #: ###-####
Print Occupancy Form  7/30/2015 DONE
Issue PAID IN FULL permit  7/30/2015 DONE
OVERRIDE  6/11/2015  
Routing - PUBLIC WORKS GRADING6/5/2015 6/11/2015 PASS
DetailsBrian Murphy
Approved in e-plan. TLW
PLANS/APPL TAKEN TO FRONT DESK  6/11/2015 DONE
Permit Ready to Issue  6/11/2015 DONE
NEED GC form, Certificate of Value, and RP// Received RP on
6-11-15 pdf// all requirements met 6-16-15 pdf--- NEED ACHD
Plan assigned to (TLW)5/6/2015 6/11/2015 PASS
DetailsTim L. Woodard
1st Review Complete
Routing - PLAN CHECK6/5/2015 6/10/2015 PASS
DetailsTim L. Woodard
Routing - FIRE6/5/2015 6/8/2015 PASS
DetailsScott Arellano
No new comments
Routing PW Sewer Design6/5/2015 6/8/2015 PASS
DetailsKyle S. Rosenmeyer
Route to Impact Fee Review5/28/20155/31/20155/29/2015 PASS
DetailsCindy M. Gould
1st review completed  5/20/2015 DONE
Routing - PLAN CHECK5/6/2015 5/20/2015 FAIL
DetailsTim L. Woodard
Routing - FIRE5/6/2015 5/18/2015 PASS
DetailsScott Arellano
Attached plan review report to case.
Routing PW Drainage5/6/2015 5/8/2015 PASS
DetailsBrian Murphy
new grading bed 3 size. Failed in E-Plan Review. TLW
Routing PW Sewer Design5/6/2015 5/8/2015 FAIL
DetailsKyle S. Rosenmeyer
Submit request to vacate sewer easement for abandonment of existing line. If an existing sewer service is replaced to the main, contractor shall contact Boise Public works 48 hours prior to sewer work schedule inspection.
Routing PW Solid Waste5/6/2015 5/8/2015 PASS
DetailsPeter J. McCullough
Approved in E-Plan Review
Routing PW Street Lights5/21/2015 5/8/2015 PASS
DetailsMike D Hedge
Approved with conditions in E-Plan Review. TLW
Routing - Erosion and Sediment5/6/2015 5/7/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required prior to earth disturbance)

New Shell and Core Building plus utilities
Routing - Design Review5/6/2015 5/7/2015 PASS
DetailsJosh Wilson
Routing - PLUMBING5/6/2015 5/7/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING Land Div5/6/2015 5/7/2015 PASS
DetailsTodd Tucker
Routing - Addressing5/6/2015 5/6/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/6/2015 5/6/2015 PASS
DetailsBeverly Mountain
Intake Approval  5/6/2015 PASS
Pending Assignment by TLW5/6/2015 5/6/2015 DONE
DetailsTim L. Woodard
Intake Approval  5/4/2015 FAIL
Please provide the site drainage and O&M (See the attached changemarks on the checklist).
Application received  4/28/2015 DONE
Application submitted via PDS Online on Apr 28 2015 3:18PM