Second Notice | | 4/22/2016 | 4/19/2016 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
First Notice | 3/31/2016 | 3/31/2016 | 4/12/2016 | | DONE |
Mike Jordan
|
|
|
Mailed 4-13-16
|
BLD-Final | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Mike Jordan
|
|
|
Shell Final Phone #: ###-#### Inspection requested via web by Mike McHargue
|
DOC - Permit Finaled | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Mike Jordan
|
|
|
Shell Final Phone #: ###-#### Inspection requested via web by Mike McHargue. Repairs were made and inspected during framing inspection on tenant improvement framing inspection.
|
FIRE-Final Inspection | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 3/23/2016 | 3/23/2016 | 3/23/2016 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 3/17/2016 | 3/18/2016 | 3/18/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide address facing the street and provide fire dept signage as discussed
|
BLD-Framing/Rough-in | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | PART |
Mike Jordan
|
|
|
Building Shell - Framing Final Phone #: ###-#### Inspection requested via web by Mike McHargue. Complete lateral bracing on T02 truss, install the required bearing blocks on T05 and T26 trusses.
|
BLD-Conference | 1/20/2016 | 1/21/2016 | 1/20/2016 | A | CANC |
Mike Jordan
|
|
|
Building SHELL - Framing Final Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
|
BLD-Wall Bracing | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | PASS |
Mike Jordan
|
|
|
Wall sheer and roof sheer Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Wall Bracing | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | FAIL |
Mike Jordan
|
|
|
Exterior Sheer / Roof Sheer Phone #: ###-#### Inspection requested via web by Mike McHargue. Needs to install all straps. Also noted several areas on exerior shear that were missed.
|
BLD-Energy code compliance | 8/6/2015 | 8/7/2015 | 8/7/2015 | P | PASS |
Mike Jordan
|
|
|
Foundation Insulation, Mike I will be out of town but if anything needs fixed please call Cory, 208 477 0298, with Big City Insulation. Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Foundation | 8/5/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
BLD-Footing | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
Print Occupancy Form | | | 7/30/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/30/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/11/2015 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 6/5/2015 | | 6/11/2015 | | PASS |
Brian Murphy
|
|
|
Approved in e-plan. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/11/2015 | | DONE |
|
|
|
NEED GC form, Certificate of Value, and RP// Received RP on
6-11-15 pdf// all requirements met 6-16-15 pdf--- NEED ACHD
|
Plan assigned to (TLW) | 5/6/2015 | | 6/11/2015 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete
|
Routing - PLAN CHECK | 6/5/2015 | | 6/10/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 6/5/2015 | | 6/8/2015 | | PASS |
Scott Arellano
|
|
|
No new comments
|
Routing PW Sewer Design | 6/5/2015 | | 6/8/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Route to Impact Fee Review | 5/28/2015 | 5/31/2015 | 5/29/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 5/20/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/6/2015 | | 5/20/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 5/6/2015 | | 5/18/2015 | | PASS |
Scott Arellano
|
|
|
Attached plan review report to case.
|
Routing PW Drainage | 5/6/2015 | | 5/8/2015 | | PASS |
Brian Murphy
|
|
|
new grading bed 3 size. Failed in E-Plan Review. TLW
|
Routing PW Sewer Design | 5/6/2015 | | 5/8/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Submit request to vacate sewer easement for abandonment of existing line. If an existing sewer service is replaced to the main, contractor shall contact Boise Public works 48 hours prior to sewer work schedule inspection.
|
Routing PW Solid Waste | 5/6/2015 | | 5/8/2015 | | PASS |
Peter J. McCullough
|
|
|
Approved in E-Plan Review
|
Routing PW Street Lights | 5/21/2015 | | 5/8/2015 | | PASS |
Mike D Hedge
|
|
|
Approved with conditions in E-Plan Review. TLW
|
Routing - Erosion and Sediment | 5/6/2015 | | 5/7/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to earth disturbance)
New Shell and Core Building plus utilities
|
Routing - Design Review | 5/6/2015 | | 5/7/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 5/6/2015 | | 5/7/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING Land Div | 5/6/2015 | | 5/7/2015 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 5/6/2015 | | 5/6/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 5/6/2015 | | 5/6/2015 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 5/6/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 5/6/2015 | | 5/6/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 5/4/2015 | | FAIL |
|
|
|
Please provide the site drainage and O&M (See the attached changemarks on the checklist).
|
Application received | | | 4/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2015 3:18PM
|