Second Notice | | 4/21/2017 | 4/17/2017 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
First Notice | 4/4/2017 | 4/4/2017 | 4/11/2017 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 4-12-17
|
BLD-Final | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Mike Jordan
|
|
|
Follow up "Shell" final inspection now that planning and zoning has signed off on the building shell. Just need final completion cert. Phone #: ###-#### Inspection requested via web by Mike McHargue
|
DOC - Permit Finaled | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | 3/29/2017 | 3/29/2017 | 3/29/2017 | | PASS |
Sarah Schafer
|
|
|
Landscape complete - bond can be released.
|
BLD-Final | 1/23/2017 | 1/23/2017 | 1/23/2017 | P | PEND |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|
FIRE-Final Inspection | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval Temp | 1/12/2017 | 1/12/2017 | 1/12/2017 | | PASS |
Josh Wilson
|
|
|
180 temp occ ok. Landscaping bond is in place. BND17-00002
|
BLD-Framing/Rough-in | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Framing/Rough-in | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PART |
Mike Jordan
|
|
|
Shell Framing Phone #: ###-#### Inspection requested via web by Mike McHargue. Work in progress on framing corrections. Air seal complete on exterior walls. ok to insulate.
|
BLD-Framing/Rough-in | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | FAIL |
Mike Jordan
|
|
|
Shell Framing Final Phone #: ###-#### Inspection requested via web by Mike McHargue. Complete all lateral bracing. Nail off 2ply B02 truss per the engineering. Provide additional studs underB03 truss, both ends. Provide squash blocks at A13 truss both ends. Install the simpson A34 on all trusses per detail 6 on S1.5. Need electrical rough in inspection and airseal pack on exterior walls. Correction notice was posted.
|
BLD-Wall Bracing | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue. Exterior shear walls and interior holdowns ok.
|
BLD-Energy code compliance | 9/8/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Mike Jordan
|
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Foundation | 9/6/2016 | 9/7/2016 | 9/7/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 9/2/2016 | 9/6/2016 | 9/6/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/2/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/2/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/2/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/12/2016 | | DONE |
|
|
|
Left a message with Cassie, for James, to inform that this permit is going to expire in ten days and just wanted to see how he would like to proceed.
|
Telephone call | | | 4/12/2016 | | DONE |
|
|
|
Spoke with James. Informed him that they can request for a 180 day extension if needed, but it would be the final one they could receive. Also informed him that the GC would need to bring in a letter or reciept from ACHD stated the amout due/paid and if an inspection is required by them. Stated that we would need a 306 and the 302 to put our fees in.
|
Extend Review Timeline | | | 4/12/2016 | | DONE |
|
|
|
Final 180 days granted by Jason B. See documents
|
Expiration Notice | 4/1/2016 | 4/22/2016 | 4/1/2016 | | DONE |
Brittany Hill
|
|
|
|
PubWorks Occupancy Approval | 3/21/2016 | 3/21/2016 | 3/21/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Extend Review Timeline | | | 10/7/2015 | | DONE |
|
|
|
1st 180 days granted my JCB. See attached documents
|
Expiration Notice | 10/1/2015 | 10/22/2015 | 10/1/2015 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 7/1/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 7/1/2015 | | DONE |
Christina Prado
|
|
|
***all requirments met 9-2-16 /CEV
*** As of 8-5-16 only NEED ACHD****Need GC, RP, ACHD & Revised cert of value for issuance
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2015 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 5/6/2015 | | 6/30/2015 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete
|
Routing - FIRE | 6/22/2015 | | 6/23/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case
|
Routing - PLAN CHECK | 6/22/2015 | | 6/22/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 6/5/2015 | | 6/9/2015 | | FAIL |
Scott Arellano
|
|
|
Comments attached to plans and emailed to architect.
|
Routing PW Sewer Design | 6/5/2015 | | 6/8/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLAN CHECK | 6/5/2015 | | 6/8/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS GRADING | 6/5/2015 | | 6/8/2015 | | PASS |
Brian Murphy
|
|
|
Approved in E-Plan. TLW
|
Plan resubmittals received | | | 6/5/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/28/2015 | 5/31/2015 | 5/29/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Design Review | 5/6/2015 | | 5/20/2015 | | PASS |
Sarah Schafer
|
|
|
Ok per DRH14-00423
|
Routing - PLAN CHECK | 5/6/2015 | | 5/20/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
1st review completed | | | 5/20/2015 | | DONE |
|
|
|
1st Review Complete. TLW
|
Routing Off Site - STRUCTURAL | 5/6/2015 | | 5/19/2015 | | FAIL |
Tim L. Woodard
|
|
|
Refer to change marks on the drawings. TLW
|
Routing - FIRE | 5/6/2015 | | 5/18/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to architect.
|
Routing PW Drainage | 5/6/2015 | | 5/8/2015 | | PASS |
Brian Murphy
|
|
|
needs seepage bed3 calc new grading. Failed in E-Plan Review. TLW
|
Routing PW Sewer Design | 5/6/2015 | | 5/8/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Submit request to vacate sewer easement for abandonment of existing line. If an existing sewer service is replaced to the main, contractor shall contact Boise Public works 48 hours prior to sewer work schedule inspection.
|
Routing PW Solid Waste | 5/6/2015 | | 5/8/2015 | | PASS |
Peter J. McCullough
|
|
|
Approved in E-Plan Review. TLW
|
Routing PW Street Lights | 5/6/2015 | | 5/7/2015 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Routing - PLANNING Land Div | 5/6/2015 | | 5/7/2015 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 5/6/2015 | | 5/6/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 5/6/2015 | | 5/6/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 5/6/2015 | | 5/6/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to earth disturbance)
Office Building Shell and Core
|
Routing - PLUMBING | 5/6/2015 | | 5/6/2015 | | PASS |
Daryl Spivey
|
|
|
|
Intake Approval | | | 5/6/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 5/6/2015 | | 5/6/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 5/4/2015 | | FAIL |
|
|
|
Please provide the site drainage and O&M (See the attached changemarks on the checklist).
|
Application received | | | 4/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2015 3:21PM
|