Second Notice | | 8/21/2015 | 9/5/2015 | | DONE |
|
|
|
This permit finaled on the web by Paul Saucerman
|
First Notice | | 8/1/2015 | 8/11/2015 | | DONE |
|
|
|
Mailed 8-11
|
BLD-Final | 7/21/2015 | 7/22/2015 | 7/22/2015 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 7/22/2015 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 7/21/2015 | 7/21/2015 | 7/21/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Door hardware was not provided yet.
|
BLD-Ceiling Grid Inspection | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PASS |
Jim Sly
|
|
|
Ceiling grid inspection....call Rich on cell to coordinate (###-####)...lockbox code 1233 if he is not on site. Phone #: ###-#### Inspection requested via web by Paul Saucerman
|
BLD-Framing/Rough-in | 6/23/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Jim Sly
|
|
|
Framing inspection to insulate and sheetrock walls...Please call Paul Saucerman ###-#### before heading to site to meet you there....code on lockbox is 1233 Phone #: ###-#### Inspection requested via web by Paul Saucerman
|
CHANGE STATUS TO (ISS) | | | 6/23/2015 | | DONE |
Christina Prado
|
|
|
Plan modification paid for ans permit re-issued
|
BLD-Framing/Rough-in | 6/15/2015 | 6/15/2015 | 6/15/2015 | P | PART |
Jim Sly
|
|
|
would like call ahead; Paul Phone #: ###-#### OK to rock lid and demising wall.
|
OVERRIDE | | | 6/8/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 6/4/2015 | 6/4/2015 | 6/8/2015 | | PASS |
Carl Westfall
|
|
|
Plan Modification Edward Jones
|
Routing - PLAN CHECK | 6/4/2015 | | 6/8/2015 | | PASS |
Carl Westfall
|
|
|
Plan mod approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/8/2015 | | DONE |
|
|
|
DO NOT REISSUE---PLAN MOD
|
Issue PAID IN FULL permit | | | 6/3/2015 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 6/3/2015 | | DONE |
Christina Prado
|
|
|
|
Plan Modification Accepted | | | 5/26/2015 | | DONE |
|
|
|
started workflow
|
OVERRIDE | | | 5/22/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 4/29/2015 | 4/29/2015 | 5/22/2015 | | PASS |
Carl Westfall
|
|
|
(May 19 - 15 days) Level 3 TI - ePlanReview - Edward Jones
|
Routing - PLAN CHECK | 4/29/2015 | | 5/22/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved
|
1st review completed | | | 5/22/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/22/2015 | | DONE |
Christina Prado
|
|
|
NEED GC form, Certificate of value, and RP
All requirements met
|
Routing - FIRE | 4/29/2015 | 4/29/2015 | 5/12/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLUMBING | 4/29/2015 | | 5/4/2015 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 4/29/2015 | | 4/29/2015 | | PASS |
Emily Dixon
|
|
|
Added Suite 101
|
Routing - PUBLIC WORKS | 4/29/2015 | | 4/29/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 4/29/2015 | | 4/29/2015 | | PASS |
Evan Jenkins
|
|
|
(EDWARD JONES) New 1,200 s.f. tenant improvement for Edward Jones to include placement of an interior concrete slab, non-bearing interior partitions and associated finishes in an existing shell space. Shell building done under BLD14-02580.
|
Intake Approval | | | 4/29/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
This project is a major TI.
Please upload the ESC application and waiver letter.
Please upload the fire flow letter from United Water.
|
Intake Approval | | | 4/29/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
|
Pending Assignment by JCB | 4/29/2015 | | 4/29/2015 | | DONE |
Jason Blais
|
|
|
|
Application received | | | 4/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2015 6:04PM
|