Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD15-01397
StatusFinaled
Name ESI
Site Address 660 E BOISE AVE
Project NameRITE-AID
Customer Number 
ePlanReviewYes
Description
(RITE-AID)(EASTGATE SHOPPING CENTER)(PLAN MODIFICATION - Additional restroom and pharmacy consultation room) Remodel to downsize an existing Rite-Aid retail pharmacy store to 19,427 sq. ft. per approved plans. Work to include the construction of a new demizing wall to the roof structure installation of new shelving, cooler units, construction of a pharmacy consultation room in the installation of related interior finishes .per the approved plans. This is a fully fire sprinklered building for area increase. The adjacent vacant areas will require a separate permit for future occupancy of the se spaces. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/20/20151/5/2016 DONE
Print Statement  1/5/2016 DONE
First Notice 11/13/201512/10/2015 DONE
Mailed 12-11-15
Permanent Occupancy  11/3/2015 DONE
FIRE-Final Inspection11/2/201511/2/201511/2/2015PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final9/15/20159/16/20159/16/2015APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Robert Snow card on site
BLD-Final9/14/20159/14/20159/14/2015PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Robert Snow need health dept sign off
BLD-Conference7/23/20157/23/20157/23/2015PPASS
DetailsJim Storey
Request framing inspection for new restroom ceiling drywall lid. Phone #: ###-#### Inspection requested via web by Ron Hack
BLD-Conference7/19/20157/20/20157/20/2015PPASS
DetailsJim Storey
Rough inspection on wall framing for consult room. Would like to request last inspection of the day as our shift does not start until 10 pm.

Thanks, Ron Hack/ESI Phone #: ###-#### Inspection requested via web by Ron Hack
BLD-Conference7/16/20157/16/20157/16/2015APASS
DetailsJim Storey
Request frame inspection for new bathroom/consult room as per plan modification. Need to inspect so sales floor side of wall can be finished where the general public is. Working overnights, would like to request inspection as early as possible.
Thanks, Ron Hack Superintendent. Phone #: ###-#### Inspection requested via web by Ron Hack
CHANGE STATUS TO (ISS)  7/15/2015 DONE
DetailsChristina Prado
plan mod fees paid, sewer permit uploaded into eplan
Plan assigned to (CDM)7/2/20157/2/20157/7/2015 PASS
DetailsCarl D Madsen
Plan Mod - Rite-Aid
Routing - PLAN CHECK7/2/2015 7/7/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/7/2015 DONE
Permit Ready to Issue  7/7/2015 DONE
DO NOT ISSUE AGAIN; plan mod fees due
Routing - PUBLIC WORKS7/2/2015 7/6/2015 PASS
DetailsJennifer Bruner
Routing PW Sewer Rating7/6/2015 7/6/2015 PASS
DetailsJennifer Bruner
Routing - Addressing7/2/2015 7/2/2015 PASS
DetailsEmily Dixon
Plan Modification Accepted  7/2/2015 DONE
Plan Modification Accepted  7/2/2015 DONE
per architect new plans for bathroom
BLD-Conference6/10/20156/10/20156/10/2015APASS
DetailsJim Storey
Request for frame inspection for demising wall. We are working overnight shifts, please schedule as early in the morning as possible.

Thanks, Ron Hack/ ESI
###-#### Phone #: ###-#### Inspection requested via web by Ron Hack dimizing wall ok pending ele
BLD-Conference6/6/20156/8/20156/8/2015APART
DetailsJim Storey
Working over night shifts on this project. If at all possible could inspections be scheduled as early as possible.
Would like to schedule rough frame inspection for new consultation room.

Ron Hack/ESI
###-#### Phone #: ###-#### Inspection requested via web by Ron Hack framing ok conf rm pending ele demizing wall ok
Issue PAID IN FULL permit  6/3/2015 DONE
Print Occupancy Form  6/3/2015 DONE
Plan assigned to (CDM)5/4/20155/4/20155/21/2015 PASS
DetailsCarl D Madsen
Level 3 TI - ePlanReview - Rite-Aid First review completed
Routing - PLAN CHECK5/21/2015 5/21/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  5/21/2015 DONE
Permit Ready to Issue  5/21/2015 DONE
Need G.C. form and certificate of value
1st review completed  5/20/2015 FAIL
Routing - PLAN CHECK5/4/2015 5/20/2015 FAIL
DetailsCarl D Madsen
Routing - FIRE5/4/20155/4/20155/13/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - Addressing5/4/2015 5/5/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/4/2015 5/5/2015 PASS
DetailsJennifer Bruner
Intake Approval  5/4/2015 PASS
Pending Assignment by JCB5/4/2015 5/4/2015 DONE
DetailsJason Blais
Intake Approval  4/29/2015 FAIL
Please provide the form 520 checklist with all applicable items.
Intake Approval  4/29/2015 FAIL
Please see the changemarks on the checklist.
Application received 4/29/2015