BLD-Final | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | NR |
Jim Sly
|
|
|
Haris Phone #: ###-#### Framing OK.
|
BLD-Wall Bracing | 6/18/2015 | 6/19/2015 | 6/19/2015 | A | NR |
Jim Sly
|
|
|
Haris Phone #: ###-#### see corr notice
|
BLD-Wall Bracing | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | FAIL |
Mike Jordan
|
|
|
shear//Zemima Phone #: ###-####. Provide approved fix for modified trusses, A2 and gable end truss bearing at incorrect locations, provide additional brackets for treat 2x4 bearing studs above and below. Correction notice issued.
|
BLD-Footing | 5/22/2015 | 5/22/2015 | 5/22/2015 | P | PASS |
Jim Sly
|
|
|
Harris Phone #: ###-####
|
Routing Walk-In (Zoning) | 5/1/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/1/2015 | 5/1/2015 | 5/1/2015 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/1/2015 | 5/1/2015 | 5/1/2015 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2015 | | |
|
|
|
|
1st review completed | | | 5/1/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2015 | | DONE |
|
|
|
|
Application received | | 5/1/2015 | | | |
|
|
|
|