BLD-Final | 9/17/2015 | 9/18/2015 | 9/18/2015 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
DOC - Permit Finaled | 9/18/2015 | 9/18/2015 | 9/18/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 9/17/2015 | 9/18/2015 | 9/17/2015 | A | CANC |
Phil Shearer
|
|
|
Matt Phone #: ###-####. Add stud in kitchen at oven vent.
|
BLD-Final | 9/15/2015 | 9/16/2015 | 9/16/2015 | P | FAIL |
Phil Shearer
|
|
|
Matt Phone #: ###-####. Handrall 34"-38", steps out of the back of the house can only have 3/8" difference between the steps.
|
BLD-Framing/Rough-in | 8/20/2015 | 8/21/2015 | 8/21/2015 | A | CANC |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
Plan Modification Accepted | | | 8/14/2015 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 8/14/2015 | | 8/14/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 7/9/2015 | 7/10/2015 | 7/10/2015 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Energy code compliance | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | PASS |
Phil Shearer
|
|
|
Shear // Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Phil Shearer
|
|
|
Shear // Matt Phone #: ###-####
|
BLD-Wall Bracing | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | FAIL |
Phil Shearer
|
|
|
Shear // Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2015 | 7/6/2015 | 7/6/2015 | P | PART |
Phil Shearer
|
|
|
Matt Phone #: ###-#### Missing truss bracing T29 OK to insulate
|
BLD-Framing/Rough-in | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | FAIL |
Phil Shearer
|
|
|
Matt Phone #: ###-####. LVL beam in garage need to have 2 LVL, truss bracing T29, Straps 2nd floor to girder. Shear pony wall, Type 3 hold down, shear nailing.
|
BLD-Wall Bracing | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | FAIL |
Phil Shearer
|
|
|
Matt Phone #: ###-####. Shear nailing and missing hold downs.
|
BLD-Foundation | 5/20/2015 | 5/21/2015 | 5/21/2015 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Foundation | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | NR |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 5/18/2015 | 5/19/2015 | 5/20/2015 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
PubWorks Subgrade Approval | 5/19/2015 | 5/19/2015 | 5/19/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | NR |
Phil Shearer
|
|
|
Phone #: ###-####
|
OVERRIDE | | | 5/11/2015 | | |
|
|
|
|
Plan assigned to (JG) | 5/9/2015 | 5/9/2015 | 5/11/2015 | | PASS |
Javier Guzman
|
|
|
waiting to have LEG route to me in eplan finish
|
Permit Ready to Issue | | | 5/11/2015 | | |
|
|
|
all requirments me
|
Issue PAID IN FULL permit | | | 5/11/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/11/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/11/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
1st review completed | | | 5/9/2015 | | DONE |
Javier Guzman
|
|
|
|
Plan assigned to (LEG) Tisha | 5/5/2015 | | 5/9/2015 | | DEFR |
Tisha Gallop
|
|
|
5/15
|
Routing - PLAN CHECK | 5/5/2015 | | 5/9/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 5/5/2015 | | 5/7/2015 | | PASS |
Troy James
|
|
|
|
Application received | | | 5/5/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 5 2015 9:02AM
|
Plans ACCEPTED BY PLAN TECH | | | 5/5/2015 | | DONE |
|
|
|
|
Intake Approval | | | 5/5/2015 | | PASS |
|
|
|
|
Routing - PLANNING | 5/5/2015 | | 5/5/2015 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 5/5/2015 | | 5/5/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 5/5/2015 | | 5/5/2015 | | PASS |
Connie Baumgartner
|
|
|
|