Letter of compliance/Occupancy | | | 8/15/2018 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 10/8/2015 | | DONE |
|
|
|
|
BLD-Final | 10/1/2015 | 10/1/2015 | 10/1/2015 | P | PASS |
Tony Young
|
|
|
Dustin Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2015 | 10/1/2015 | 10/1/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Energy code compliance | 7/24/2015 | 7/27/2015 | 7/27/2015 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony
|
BLD-Framing/Rough-in | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, ok to insulate,, need to strap plates in various areas to complete diaphram through top plates,, nail hanger off near entry,, support truss bearing in garage,, fireblock ceiling lines
|
BLD-Other | 7/21/2015 | 7/21/2015 | 7/21/2015 | P | PART |
Tony Young
|
|
|
Fire Rated Soffit Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, work in progress,, ok
|
BLD-Framing/Rough-in | 7/16/2015 | 7/17/2015 | 7/17/2015 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony conf with sidding installed ok to cover leave small piece of facia off
|
BLD-Other | 7/9/2015 | 7/10/2015 | 7/10/2015 | A | PART |
Tony Young
|
|
|
Light Box Inspection Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, ok after installing 2nd layer 5/8" to boxes
|
BLD-Wall Bracing | 7/9/2015 | 7/10/2015 | 7/10/2015 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, exterior ok after fixing correction notice
|
BLD-Footing | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 6/1/2015 | 6/1/2015 | 6/1/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 5/27/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 5/26/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/26/2015 | | DONE |
|
|
|
|
Telephone call | | | 5/26/2015 | | DONE |
Christina Prado
|
|
|
Called Jayo to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 5/26/2015 | | DONE |
|
|
|
requirements met
|
Plan assigned to (JG) | 5/23/2015 | 5/23/2015 | 5/23/2015 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 5/23/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 5/23/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 5/5/2015 | | 5/23/2015 | | DEFR |
Tisha Gallop
|
|
|
5/22 L2
|
Routing - PLAN CHECK | | | 5/23/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 5/12/2015 | | 5/18/2015 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Erosion and Sediment | 5/11/2015 | | 5/12/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 1,950 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 147 sq. ft. of covered patio/porch and a 680 sq. ft. attached garage
|
Routing - MECHANICAL | 5/7/2015 | | 5/11/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/6/2015 | | 5/7/2015 | | PASS |
Susan Riggs
|
|
|
CONDITION THAT DRIVEWAY SHALL NOT BE GREATER THAN 33 FEET IN WIDTH IN THE FRONT 20' SETBACK.
|
Routing - PUBLIC WORKS | 5/6/2015 | | 5/6/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 5/5/2015 | | 5/6/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Grading-Hillside | 5/5/2015 | | 5/6/2015 | | PASS |
Jason C. Taylor
|
|
|
*NO HILLSIDE APPLICATION REQUIRED - NOT A HILLSIDE PROJECT**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 5/5/2015 | | DONE |
|
|
|
|
Intake Approval | | | 5/5/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/5/2015 | | DONE |
|
|
|
|
Application received | | 5/5/2015 | | | |
|
|
|
|