Permit Information
Permit NumberBLD15-01500
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 3350 N COLLISTER DR
Project NameSamaritan Village Apartments I
Customer Number 
ePlanReviewYes
Description
(GOOD SAMARITAN APARTMENTS I – Update Existing Senior Housing) Permit is to conduct a finishes update to each of the 50 existing units and other minor work. The applicant has proposed showing compliance with the 2012 IEBC “Work Area” provisions for an “Alteration Level – I”. Work to include: [demolition of existing cabinets, appliances, and plumbing fixtures], [installation of new cabinets, appliances, plumbing fixtures, and interior finishes in compliance with chapter 8 of the 2012 IBC] and miscellaneous site work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  1/27/2017 DONE
Final passed 12-14-16
Letter of compliance/Occupancy  1/27/2017 DONE
BLD-Final12/13/201612/14/201612/14/2016PPASS
DetailsDave Hannah
Mark Phone #: ###-####
Letter of compliance/Occupancy  12/14/2016 DONE
FIRE-Final Inspection12/12/201612/13/201612/13/2016PCANC
DetailsJim Page
Inspection request is for BLD15-01502, this request is cancelled and a new inspection request generated.
FIRE-Final Inspection10/26/201610/26/201610/26/2016PPASS
DetailsJim Page
No fire sprinkler modifications, fire sprinkler riser has a current inspection tag, final fire alarm inspection passed/complete, knox box is in place, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Aging Inspection7/27/20167/27/20167/28/2016 PEND
DetailsTony Young
BLD-Aging Inspection7/26/20167/26/20167/27/2016 PEND
DetailsTony Young
Issue PAID IN FULL permit  9/11/2015 DONE
Inspection Record Card- Bld  9/11/2015 DONE
Case Summary (BLD)  7/22/2015 DONE
OVERRIDE  7/1/2015  
Plan resubmittals received  7/1/2015 DONE
Routing - PLAN CHECK7/1/2015 7/1/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/1/2015 DONE
Permit Ready to Issue  7/1/2015 DONE
need GC, rev cert of val & RP; ALL REQUIRMENTS MET 7-7-15 ///CEV
Plan assigned to (TLW)5/13/2015 7/1/2015 PASS
DetailsTim L. Woodard
1st Review Complete Level 3 TI - ePlanReview - Samaritan Village Apartments I
Routing - PLAN CHECK6/12/2015 6/30/2015 FAIL
DetailsTim L. Woodard
Architect did not address all corrections. TLW
Routing - MECHANICAL6/12/2015 6/16/2015 PASS
DetailsTroy James
Routing - FIRE6/12/2015 6/15/2015 PASS
DetailsScott Arellano
Comments attached to case
Plan resubmittals received  6/12/2015 DONE
DetailsTim L. Woodard
Route to Impact Fee Review6/2/20156/5/20156/3/2015 PASS
DetailsCindy M. Gould
1st review completed  6/1/2015 DONE
Routing - PLAN CHECK5/13/2015 6/1/2015 FAIL
DetailsTim L. Woodard
Corrections noted in E-Plan. TLW
Routing - FIRE5/13/20155/13/20155/29/2015 FAIL
DetailsScott Arellano
Emailed comments to architect. Attached report to case.
Routing - MECHANICAL5/13/2015 5/21/2015 FAIL
DetailsTroy James
Need 2012 rescheck and comcheck
Routing PW Solid Waste5/13/2015 5/20/2015 PASS
DetailsMegan Durrell
Routing - Design Review5/13/2015 5/15/2015 PASS
DetailsJosh Wilson
Ok per DRH15-00094
Routing - Erosion and Sediment5/13/2015 5/14/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

(SAMARITAN VILLAGE APARTMENTS I) Tenant Improvement of existing senior housing dwelling units, exterior building improvements, and minimal site work in apartment buildings. Dwelling unit improvements include new kitchen appliances and bathroom fixtures along with new interior finishes. The exterior building improvements include siding and roofing replacement, exterior siding cleaning, and apartment mechanical units. The site work includes concrete replacement, new carports, and parking lot striping.
Pending Assignment by JCB5/13/2015 5/13/2015 DONE
DetailsJason Blais
Routing PW Drainage5/13/2015 5/13/2015 PASS
DetailsJason C. Taylor
No storwmwater requirements. Carports and striping only. Jason Talyor ###-####.
Routing PW Street Lights5/13/2015 5/13/2015 PASS
DetailsMike D Hedge
No street lighting required.
Routing PW Sewer Rating5/13/2015 5/13/2015 PASS
DetailsConnie Baumgartner
Routing - Addressing5/13/2015 5/13/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/13/2015 5/13/2015 PASS
DetailsJennifer Bruner
Routing - PLUMBING5/13/2015 5/13/2015 PASS
DetailsBill VanDegrift
May require DCVA on water service.
Intake Approval  5/12/2015 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard and plan review fees paid.
Application received  5/6/2015 DONE
Application submitted via PDS Online on May 6 2015 8:31AM