Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01502
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 3360 N COLLISTER DR
Project NameSamaritan Village Apartment II
Customer Number 
ePlanReviewYes
Description
(GOOD SAMARITAN APARTMENTS II – Update Existing Senior Housing) Permit is to conduct a finishes update to each of the 50 existing units and other minor work. The applicant has proposed showing compliance with the 2012 IEBC “Work Area” provisions for an “Alteration Level – I”. Work to include: [demolition of existing cabinets, appliances, and plumbing fixtures], [installation of new cabinets, appliances, plumbing fixtures, and interior finishes in compliance with chapter 8 of the 2012 IBC] and miscellaneous site work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/28/20174/28/20174/28/2017 DONE
DetailsTony Young
BLD-Final4/28/20174/28/20174/28/2017PDONE
DetailsTony Young
DOC - Permit Finaled4/28/20174/28/20174/28/2017PPASS
DetailsTony Young
done
BLD-Aging Inspection4/27/20174/27/20174/28/2017 DONE
DetailsTony Young
BLD-Final12/13/201612/14/201612/14/2016PPASS
DetailsDave Hannah
Mark Phone #: ###-####
Letter of compliance/Occupancy  12/14/2016 DONE
FIRE-Final Inspection12/13/201612/13/201612/13/2016PPASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, knox box is in place on east main entry, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Aging Inspection7/27/20167/27/20168/3/2016 PEND
DetailsTony Young
BLD-Aging Inspection7/26/20167/26/20167/27/2016 PEND
DetailsTony Young
Issue PAID IN FULL permit  9/11/2015 DONE
Inspection Record Card- Bld  9/11/2015 DONE
Case Summary (BLD)  7/22/2015 DONE
OVERRIDE  7/1/2015  
Plan resubmittals received  7/1/2015 DONE
Routing - PLAN CHECK7/1/2015 7/1/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/1/2015 DONE
Permit Ready to Issue  7/1/2015 DONE
Need GC Form, Revised Cert of Value and RP -ALL REQUIRMENTS MET 7-7-15 ///CEV
Plan assigned to (TLW)5/13/2015 7/1/2015 PASS
DetailsTim L. Woodard
1st Review Complete - Level 3 TI - ePlanReview - Samaritan Village Apartments II
Routing - PLAN CHECK6/30/2015 6/30/2015 FAIL
DetailsTim L. Woodard
Route to Impact Fee Review6/15/20156/18/20156/18/2015 PASS
DetailsCindy M. Gould
Routing - FIRE6/17/2015 6/17/2015 PASS
DetailsKatie Marron
Comments attached to case
Routing - MECHANICAL6/16/2015 6/16/2015 PASS
DetailsTroy James
1st review completed  6/8/2015 FAIL
DetailsTim L. Woodard
Routing - PLAN CHECK5/13/2015 6/8/2015 FAIL
DetailsTim L. Woodard
Refer to changemarks in e-plan Review. TLW
Routing - FIRE5/13/20155/13/20155/29/2015 FAIL
DetailsKatie Marron
Emailed comments to architect and attached to plans.
Routing - MECHANICAL5/13/2015 5/21/2015 FAIL
DetailsTroy James
Need 2012 rescheck and comcheck
Routing PW Solid Waste5/13/2015 5/20/2015 PASS
DetailsMegan Durrell
Routing - Design Review5/13/2015 5/15/2015 PASS
DetailsJosh Wilson
Ok per DRH15-00094
Routing - Erosion and Sediment5/13/2015 5/14/2015 PASS
DetailsEvan Jenkins
(SAMARITAN VILLAGE APARTMENTS II) Tenant Improvement of existing senior housing dwelling units, exterior building improvements, and minimal site work in two apartment buildings. Dwelling unit improvements include new kitchen appliances and bathroom fixtures along with new interior finishes. The exterior building improvements include siding and roofing replacement, exterior siding cleaning, and apartment mechanical units. The site work includes concrete replacement, new carports, and parking lot striping.
Pending Assignment by JCB5/13/2015 5/13/2015 DONE
DetailsJason Blais
Routing PW Sewer Rating5/13/2015 5/13/2015 PASS
DetailsConnie Baumgartner
Routing PW Street Lights5/13/2015 5/13/2015 PASS
DetailsMike D Hedge
No street lights required.
Routing PW Drainage5/13/2015 5/13/2015 PASS
DetailsJason C. Taylor
No Stormwater Requirements. Carports and striping only. Jason Taylor ###-####.
Routing - PLUMBING5/13/2015 5/13/2015 PASS
DetailsBill VanDegrift
May require DCVA on building water service if not existing.
Routing - Addressing5/13/2015 5/13/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/13/2015 5/13/2015 PASS
DetailsConnie Baumgartner
Intake Approval  5/12/2015 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard and plan review fees paid.
Application received  5/6/2015 DONE
Application submitted via PDS Online on May 6 2015 9:57AM
First Notice4/28/20174/28/2017   
DetailsTony Young