BLD-Aging Inspection | 12/9/2016 | 12/9/2016 | 12/12/2016 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 12/12/2016 | 12/12/2016 | 12/12/2016 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/27/2016 | 7/28/2016 | 7/28/2016 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 7/26/2016 | 7/26/2016 | 7/26/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | PART |
Jim Storey
|
|
|
John Phone #: ###-#### house ok/ pending pw for house and retaining walls
|
Plan Modification Accepted | | | 7/6/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 7/6/2016 | | 7/6/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Aging Inspection | 6/30/2016 | 6/30/2016 | 7/5/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/29/2016 | 6/29/2016 | 7/5/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 5/26/2016 | 5/27/2016 | 5/27/2016 | P | PART |
Tony Young
|
|
|
Phil Phone #: ###-####,, ?s on guard rail on front
|
Routing - MECHANICAL | 4/15/2016 | | 4/15/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Energy code compliance | 2/12/2016 | 2/16/2016 | 2/16/2016 | A | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####
|
BLD-Framing/Rough-in | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | PART |
Tony Young
|
|
|
Phil Phone #: ###-####,, walls ok to insulate,, need sprinkler pass prior to cover
|
Plan Modification Accepted | | | 2/4/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/4/2016 | | 2/4/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####
|
BLD-Foundation | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PASS |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
PubWorks Subgrade Approval | 9/16/2015 | 9/16/2015 | 9/16/2015 | | DONE |
Jason C. Taylor
|
|
|
**GARAGE FOOTINGS & COLUMN PAD***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | PASS |
Tony Young
|
|
|
Dane Phone #: ###-####,, basement wall ok
|
BLD-Footing | 7/30/2015 | 7/31/2015 | 7/31/2015 | A | PART |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 7/29/2015 | 7/30/2015 | 7/30/2015 | A | PART |
Tony Young
|
|
|
Dane Phone #: ###-####,, work in progress on main home area,, basement ftgs
|
BLD-Footing | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | NR |
Tony Young
|
|
|
Dane Phone #: ###-####
|
PubWorks Subgrade Approval | 7/27/2015 | 7/27/2015 | 7/27/2015 | | DONE |
Jason C. Taylor
|
|
|
***ALL RESIDENTIAL FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 6/9/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/3/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/3/2015 | | DONE |
|
|
|
|
Telephone call | | | 6/3/2015 | | DONE |
|
|
|
Left message for Sarah informing her the permit is ready and the fees that are due
|
Plan assigned to (LEG) Tisha | 5/7/2015 | | 6/3/2015 | | DONE |
Tisha Gallop
|
|
|
1st review 5/26 L2; plan check, hillside
|
Routing - PLAN CHECK | 5/26/2015 | | 6/3/2015 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 6/3/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/3/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/3/2015 | | DONE |
|
|
|
all requirements met
|
Routing - PLAN CHECK | 5/21/2015 | | 5/26/2015 | | FAIL |
Tisha Gallop
|
|
|
see attached e-mail for comments
|
Routing - PUBLIC WORKS | 5/26/2015 | | 5/26/2015 | | PASS |
Jennifer Bruner
|
|
|
|
1st review completed | | | 5/26/2015 | | FAIL |
|
|
|
|
Routing PW Grading-Hillside | 5/26/2015 | | 5/26/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 5/18/2015 | 5/7/2015 | 5/21/2015 | | PASS |
Scott Arellano
|
|
|
This structure is required to be fire sprinklered.
|
Routing - Erosion and Sediment | 5/15/2015 | | 5/18/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submiitted with BLD15-01528 (retaining wall permit) and covered by ESC15-00623. Approved.
|
Routing - MECHANICAL | 5/12/2015 | | 5/15/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/12/2015 | | 5/12/2015 | | PASS |
Brent Moore
|
|
|
CFH15-00022
|
Routing - Addressing | 5/7/2015 | | 5/12/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 5/12/2015 | | 5/12/2015 | | FAIL |
Jennifer Bruner
|
|
|
See PW Grading-Hillside
|
Routing PW Grading-Hillside | | | 5/12/2015 | | FAIL |
Jason C. Taylor
|
|
|
No geotechnical reports submitted with application. Called applicant for re-submittals. Jason Taylor ###-####.
|
Routing PW Sewer Rating | 5/12/2015 | | 5/12/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/7/2015 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/7/2015 | | DONE |
|
|
|
|
Intake Approval | | | 5/7/2015 | | PASS |
|
|
|
|
Application received | | 5/7/2015 | | | |
|
|
|
|