Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01529
StatusIssued
Name SEIDL HOME CO INC
Site Address 510 W PASO FINO DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of approximately 700 linear feet of retaining wall to prepare site for new single family dwelling that will be built under a separate permit, Bld15-01528. All work is to be done according to approved plan and Engineering.
*** A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/26/20174/26/20174/28/2017 PEND
DetailsTony Young
needs hillside pass
BLD-Aging Inspection4/25/20174/25/20174/28/2017 PEND
DetailsTony Young
BLD-Aging Inspection12/9/201612/9/201612/12/2016 PASS
DetailsTony Young
BLD-Final7/27/20167/28/20167/28/2016ADONE
DetailsTony Young
John Phone #: ###-####,, ok pending public works
BLD-Final7/19/20167/20/20167/20/2016PCANC
DetailsTony Young
John Phone #: ###-####
BLD-Aging Inspection3/9/20163/9/20163/10/2016 PEND
DetailsTony Young
BLD-Aging Inspection3/8/20163/8/20163/9/2016 PEND
DetailsTony Young
BLD-Conference1/15/20161/19/20161/19/2016APASS
DetailsTony Young
Phil Phone #: ###-####,, frame walk through,, just need trades mainly,, I did not look at any engineering
BLD-Foundation10/23/201510/26/201510/26/2015APART
DetailsTony Young
Phil-retaining wall Phone #: ###-####,, block retaing wall on packed soil,, verified drain and washed rock,, fabric tie back,, 2 coarses
BLD-Foundation7/6/20157/7/20157/7/2015APART
DetailsTony Young
Don Phone #: ###-####,, work in progress on wall
Routing PW Grading-Hillside6/29/2015 6/29/2015 PASS
DetailsJim Wyllie
Received footing subgrade approval from Geotechnical Engineer. Okay to schedule a footing inspection for the lower retaining wall. Jim Wyllie / ###-####
BLD-Footing6/25/20156/26/20156/26/2015APART
DetailsTony Young
pour at 10:30AM; Matt Phone #: ###-####,, soil report viewed on site,, next lower retaining wall footings are ok to pour
BLD-Foundation6/12/20156/15/20156/15/2015PPART
DetailsTony Young
Matt Phone #: ###-####,, upper wall
BLD-Foundation6/12/20156/15/20156/15/2015APART
DetailsTony Young
Matt// retaining wall inspection Phone #: ###-####,, upper retaing wall rebar ok,, work in progress
BLD-Other6/11/20156/12/20156/12/2015PPART
DetailsTony Young
Matt// retaining wall inspection Phone #: ###-####,, rebar work in progress
BLD-Footing6/3/20156/3/20156/3/2015PPART
DetailsJim Storey
John Phone #: ###-#### 50 % of ln ft
BLD-Footing6/1/20156/2/20156/3/2015PNR
DetailsMike Jordan
Matt Phone #: ###-####
BLD-Footing6/1/20156/1/20156/1/2015PNR
DetailsMike Jordan
John Phone #: ###-####. No one on site. No work to inspect.
PubWorks Subgrade Approval5/22/20155/22/20155/22/2015 DONE
DetailsJason C. Taylor

*UPPER RETAINING WALL**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Override - Parcel Holds  5/22/2015  
OVERRIDE  5/19/2015  
Override - Parcel Holds  5/19/2015  
Issue PAID IN FULL permit  5/19/2015 DONE
Plan assigned to (LEG) Tisha5/18/2015 5/19/2015 DONE
DetailsTisha Gallop
retaining walls only
Plan resubmittals received  5/19/2015 DONE
received one copy of sheet S-1.1, and S-1.2- put on Tisha's desk
Case Summary (BLD)  5/19/2015 DONE
1st review completed  5/19/2015 DONE
Routing - PLAN CHECK5/19/2015 5/19/2015 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  5/19/2015 DONE
Override - Parcel Holds  5/19/2015  
Permit Ready to Issue  5/19/2015 DONE
Routing Walk-In (Zoning)5/12/20155/12/20155/18/2015APASS
DetailsBrent Moore
Routing - Erosion and Sediment5/18/2015 5/18/2015 PASS
DetailsAndy J. Long
ESC plan and site map submitted and approved. Valid PD and RP designated. ESC plan covers construction of retaining walls and the new home.
Routing Walk-In (PW Hillside)5/7/20155/7/20155/12/2015PPASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Application received 5/7/2015