BLD-Aging Inspection | 4/26/2017 | 4/26/2017 | 4/28/2017 | | PEND |
Tony Young
|
|
|
needs hillside pass
|
BLD-Aging Inspection | 4/25/2017 | 4/25/2017 | 4/28/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/9/2016 | 12/9/2016 | 12/12/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | DONE |
Tony Young
|
|
|
John Phone #: ###-####,, ok pending public works
|
BLD-Final | 7/19/2016 | 7/20/2016 | 7/20/2016 | P | CANC |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Aging Inspection | 3/9/2016 | 3/9/2016 | 3/10/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/8/2016 | 3/8/2016 | 3/9/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 1/15/2016 | 1/19/2016 | 1/19/2016 | A | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####,, frame walk through,, just need trades mainly,, I did not look at any engineering
|
BLD-Foundation | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | PART |
Tony Young
|
|
|
Phil-retaining wall Phone #: ###-####,, block retaing wall on packed soil,, verified drain and washed rock,, fabric tie back,, 2 coarses
|
BLD-Foundation | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | PART |
Tony Young
|
|
|
Don Phone #: ###-####,, work in progress on wall
|
Routing PW Grading-Hillside | 6/29/2015 | | 6/29/2015 | | PASS |
Jim Wyllie
|
|
|
Received footing subgrade approval from Geotechnical Engineer. Okay to schedule a footing inspection for the lower retaining wall. Jim Wyllie / ###-####
|
BLD-Footing | 6/25/2015 | 6/26/2015 | 6/26/2015 | A | PART |
Tony Young
|
|
|
pour at 10:30AM; Matt Phone #: ###-####,, soil report viewed on site,, next lower retaining wall footings are ok to pour
|
BLD-Foundation | 6/12/2015 | 6/15/2015 | 6/15/2015 | P | PART |
Tony Young
|
|
|
Matt Phone #: ###-####,, upper wall
|
BLD-Foundation | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | PART |
Tony Young
|
|
|
Matt// retaining wall inspection Phone #: ###-####,, upper retaing wall rebar ok,, work in progress
|
BLD-Other | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | PART |
Tony Young
|
|
|
Matt// retaining wall inspection Phone #: ###-####,, rebar work in progress
|
BLD-Footing | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PART |
Jim Storey
|
|
|
John Phone #: ###-#### 50 % of ln ft
|
BLD-Footing | 6/1/2015 | 6/2/2015 | 6/3/2015 | P | NR |
Mike Jordan
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 6/1/2015 | 6/1/2015 | 6/1/2015 | P | NR |
Mike Jordan
|
|
|
John Phone #: ###-####. No one on site. No work to inspect.
|
PubWorks Subgrade Approval | 5/22/2015 | 5/22/2015 | 5/22/2015 | | DONE |
Jason C. Taylor
|
|
|
*UPPER RETAINING WALL**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Override - Parcel Holds | | | 5/22/2015 | | |
|
|
|
|
OVERRIDE | | | 5/19/2015 | | |
|
|
|
|
Override - Parcel Holds | | | 5/19/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/19/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 5/18/2015 | | 5/19/2015 | | DONE |
Tisha Gallop
|
|
|
retaining walls only
|
Plan resubmittals received | | | 5/19/2015 | | DONE |
|
|
|
received one copy of sheet S-1.1, and S-1.2- put on Tisha's desk
|
Case Summary (BLD) | | | 5/19/2015 | | DONE |
|
|
|
|
1st review completed | | | 5/19/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/19/2015 | | 5/19/2015 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/19/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 5/19/2015 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 5/12/2015 | 5/12/2015 | 5/18/2015 | A | PASS |
Brent Moore
|
|
|
|
Routing - Erosion and Sediment | 5/18/2015 | | 5/18/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan and site map submitted and approved. Valid PD and RP designated. ESC plan covers construction of retaining walls and the new home.
|
Routing Walk-In (PW Hillside) | 5/7/2015 | 5/7/2015 | 5/12/2015 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Application received | | 5/7/2015 | | | |
|
|
|
|