Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD15-01545
StatusFinaled
Name Jeff Hatch
Site Address 1422 N 10TH ST
Project NameLongfellow Elementary Modular
Customer Number 
ePlanReviewYes
Description
(LONGFELLOW ELEMENTARY - Modular Classroom # 38) Existing 1,176 s.f modular building to be relocated to Longfellow Elementary with stair and ramp access. Scope of work includes: engineered set, new ramp and stairs, and new accessible route to the building. NOTE: Plumbing fixture counts showing capacity in the existing building on the site are to be shown with BLD15-01658. This building is not fire sprinklered; however, will be tied into the adjacent “Multi-Purpose Buildings” alarm system. STATE TAG # 91877 A&B 7-22-91. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval8/4/20168/4/20168/4/2016 DONE
DetailsTiffany Lowery
Second Notice 9/25/20159/21/2015 DONE
This permit finaled on the web by Gabe Beal
Telephone call  9/21/2015 DONE
Sent an email to Gabe informing him that the fees on this permit is still due and that he'll have to send Rita an email requesting a refund because fees for BLD15-01658 were paid for by mistake. Informed him that it looks like somehow this permit was issued without the fees at time of issuance, so the fee amount that is showing is based off the value he gave of 81,720
First Notice 9/7/20159/15/2015 DONE
Mailed 9/16/15
BLD-Final8/27/20158/28/20158/28/2015APASS
DetailsTony Young
Gabe Phone #: ###-####,, ok for c of o
Permanent Occupancy  8/28/2015  
Print Statement  8/28/2015 DONE
Zoning Approval8/25/20158/25/20158/25/2015 PASS
DetailsTodd Tucker
Building complies with setback requirements.
BLD-Final8/20/20158/21/20158/21/2015PPART
DetailsTony Young
Gabe Phone #: ###-####,, final ok after others get signed off
FIRE-Final Inspection8/20/20158/21/20158/21/2015APASS
DetailsKatie Marron
Fire life safety pass.
Issue PAID IN FULL permit  7/22/2015 DONE
Print Occupancy Form  7/22/2015 DONE
OVERRIDE  6/24/2015  
Override - Parcel Holds  6/24/2015  
Override - Parcel Holds  6/24/2015  
Permit Ready to Issue  6/24/2015 DONE
do not issue unitl after the appeal perior ending June 29th @ 5:00pm otherwise need GC, GC Form and rev cert of val- i will batch stamp on the 30th -ALL REQUIRMENTS MET 7-22-15
Routing - PLANNING6/17/2015 6/23/2015 PASS
DetailsTodd Tucker
Approved in E-Plan. TLW
Routing - PUBLIC WORKS GRADING6/17/2015 6/23/2015 PASS
DetailsBrian Murphy
Approved in E-Plan. TLW
PLANS/APPL TAKEN TO FRONT DESK  6/23/2015 DONE
Plan assigned to (TLW)5/27/2015 6/23/2015 PASS
DetailsTim L. Woodard
Route to Impact Fee Review6/16/20156/19/20156/18/2015 PASS
DetailsCindy M. Gould
Plan resubmittals received  6/17/2015 DONE
Routing - PLAN CHECK6/17/2015 6/17/2015 PASS
DetailsTim L. Woodard
Routing - FIRE6/17/2015 6/17/2015 PASS
DetailsKatie Marron
Comments attached to case
1st review completed  6/16/2015 DONE
Routing PW Street Lights5/28/2015 6/16/2015 PASS
DetailsMike D Hedge
Approved in e-plan. TLW
Routing - ELECTRICAL5/27/2015 6/16/2015 PASS
DetailsJavier Guzman
Approved in E-Plan. TLW
Routing - PLAN CHECK5/27/2015 6/16/2015 PASS
DetailsTim L. Woodard
Routing PW Drainage5/28/2015 6/3/2015 FAIL
DetailsBrian Murphy
needs geo revised o and m swale elv ect
Routing - FIRE5/27/2015 6/1/2015 FAIL
DetailsScott Arellano
Emailed architect correction items. Attached plan review report to case.
Routing - PLANNING5/27/2015 6/1/2015 FAIL
DetailsLeon Letson
Applicant must complete CUP modification prior to permit.
Routing PW Solid Waste5/28/2015 5/29/2015 PASS
DetailsMegan Durrell
Routing - PLUMBING5/27/2015 5/28/2015 PASS
DetailsDaryl Spivey
Routing - Addressing5/27/2015 5/28/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/27/2015 5/28/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment5/27/2015 5/28/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(LONGFELLOW ELEMENTARY - Modular Classroom) Existing 1176 s.f modular building to be relocated to Longfellow Elementary with stair and ramp access.
Routing - MECHANICAL5/27/2015 5/28/2015 PASS
DetailsTroy James
no mechanical design to review
Intake Approval  5/27/2015 PASS
Pending Assignment by TLW5/27/2015 5/27/2015 DONE
DetailsTim L. Woodard
Application received  5/8/2015 DONE
Application submitted via PDS Online on May 8 2015 2:44PM