Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01548
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 380 N FIVE MILE RD
Project NameAir Filter Superstore
Customer NumberBLD15-01550 BLD15-01551
ePlanReviewYes
Description
**(AIR FILTER SUPERSTORE)** Permit for tenant improvement for a 2735 sq. ft. existing tenant space previously occupied by “EDDY’S BAKERY“ built in 1981 in ADA County and annexed into the City of Boise in 2003. There will be no change to the mercantile occupancy and no new work done under this permit. This unlimited area building is fully Fire Sprinklered with an approved Fire Alarm system and surrounded by public ways or yards not less than 60 feet. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: a separate permit is required prior to occupying this building. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 7/6/20157/9/2015 DONE
mailed in 7-10-15
BLD-Final6/25/20156/26/20156/26/2015APASS
DetailsMike Jordan
Ron Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  6/26/2015 DONE
FIRE-Final Inspection6/11/20156/12/20156/12/2015APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection6/11/20156/12/20156/12/2015ACANC
DetailsTroy Cobbley
Per Ron Phone #: ###-####
FIRE-Final Inspection6/9/20156/9/20156/9/2015PFAIL
DetailsTroy Cobbley
Life safety will be ok to passed when the building fire alarm system has been inspected/passed.
Issue PAID IN FULL permit  6/4/2015 DONE
DetailsChristina Prado
Print Occupancy Form  6/4/2015 DONE
DetailsChristina Prado
Permit Ready to Issue  6/3/2015 DONE
all requirements met
Plan assigned to (JG)5/11/20155/11/20155/21/2015 PASS
DetailsJavier Guzman
5/28 Pending Fire for 1st rev (Air Filter Superstore)
Routing - FIRE5/11/20155/11/20155/21/2015 PASS
DetailsScott Arellano
Attached comments to plans.
1st review completed  5/21/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  5/21/2015 DONE
Case Summary (BLD)  5/14/2015 DONE
Routing - PLAN CHECK5/11/2015 5/13/2015 PASS
DetailsJavier Guzman
Routing - Addressing5/11/2015 5/11/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/11/2015 5/11/2015 PASS
DetailsJennifer Bruner
Intake Approval  5/11/2015 PASS
Application received  5/8/2015 DONE
Application submitted via PDS Online on May 8 2015 4:17PM