BLD-Final | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
DOC - Permit Finaled | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 8/11/2015 | 8/12/2015 | 8/12/2015 | A | FAIL |
Mike Jordan
|
|
|
late morning if possible // Rob Phone #: ###-####. A mech. permit is required for the bathroom fan and the new dryer duct. Also needs to fireblock all furouts and fur downs.
|
Routing Walk-In (BLD) | 5/13/2015 | 5/13/2015 | 5/13/2015 | P | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 5/13/2015 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 5/13/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 5/13/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/13/2015 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 5/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/13/2015 | | DONE |
|
|
|
|
Application received | | 5/13/2015 | | | |
|
|
|
|