First Notice | 5/17/2016 | 5/17/2016 | 6/10/2016 | | DONE |
Mike Jordan
|
|
|
Mailed 6-13-16
|
BLD-Final | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Mike Jordan
|
|
|
call for access; Jason Phone #: ###-####
|
DOC - Permit Finaled | 5/17/2016 | 5/17/2016 | 5/17/2016 | P | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | 4/4/2016 | 4/4/2016 | 4/4/2016 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Address is on the free standing sign
|
BLD-Framing/Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | PASS |
Mike Jordan
|
|
|
Call for access - Jason Phone #: ###-####
|
Print Occupancy Form | | | 3/18/2016 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | PART |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Framing ok. Needs to foam all penetrations in top plates. Correction notice posted.
|
BLD-Wall Bracing | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-#### OK to cover Ext.
|
BLD-Wall Bracing | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | NR |
Mike Jordan
|
|
|
Travis Phone #: ###-####. No one on site. called travis and left message noting that I was on my way. Waited at jobsite for approx. 45. min. No one on site except for stucco crew. Noted sheet rock cannot see the entirely assembly (WP 1330) I noted to travis that some sheetrock will need to removed to see aseembly. Will need to reschedule.
|
BLD-Wall Bracing | 11/13/2015 | 11/16/2015 | 11/16/2015 | A | NH |
Mike Jordan
|
|
|
Travis Phone #: ###-####. No access to jobsite. No one here, gate locked. RESCHEDULED A PM INSPECTION.
|
BLD-Wall Bracing | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | NR |
Mike Jordan
|
|
|
Travis Phone #: ###-####. New details for exterior 1hr. walls not yet submitted and approved. Called to advise travis on what he needs to do.
|
BLD-Wall Bracing | 11/5/2015 | 11/9/2015 | 11/9/2015 | A | FAIL |
Mike Jordan
|
|
|
Travis Phone #: ###-####. Detail procided by architect only provides 1hr. from the exterior side, 1hr. is required from both sides of exterior wall. Plan design shows that the parapet is to be constructed 2x framing to provide the required 1hr. construction on either side. in place construction used jack truss to provide parapet construction. Called travis to advise him of non compliance. Also spoke with plan review (Tim W. ) to discuss the non compliance. Architect and contractor to resubmit to plan review to show design change and details of an approved assembly to show compliance with the approved plans.
|
BLD-Wall Bracing | 11/4/2015 | 11/5/2015 | 11/4/2015 | A | CANC |
Mike Jordan
|
|
|
Travis Phone #: ###-#### **CANCELED by contractor***
|
BLD-Wall Bracing | 10/29/2015 | 11/2/2015 | 11/2/2015 | A | FAIL |
Mike Jordan
|
|
|
Travis Phone #: ###-####.. North and south wall shaer walls ok. Did note however that east and west walls are one construction to to proximity to property lines. Contractor to provide 1hr. construction on east and west walls per approved plan. Provide approved detail from architect showing the paprpet rating as well as soffitt? A correction notice was issued
|
BLD-Energy code compliance | 10/1/2015 | 10/1/2015 | 10/2/2015 | P | PART |
Jim Sly
|
|
|
Rob Phone #: ###-#### Foundation Insulation OK
|
BLD-Footing | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | CANC |
Mike Jordan
|
|
|
Travis Phone #: ###-####
|
BLD-Footing | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Mike Jordan
|
|
|
Travis Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/1/2015 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 9/1/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/31/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 8/31/2015 | | DONE |
Christina Prado
|
|
|
Need GC, RP & Revised certificate of value for issuance
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/27/2015 | | 8/30/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 6/4/2015 | | 8/30/2015 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete. TLW
|
Routing - Erosion and Sediment | 8/28/2015 | | 8/28/2015 | | PASS |
Andy J. Long
|
|
|
Plan designer submitted interim PD and will take course in October. ESC site map and narrative approved. Need to designate valid Responsble Person.
|
Routing Off Site - STRUCTURAL | 8/21/2015 | | 8/28/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 8/24/2015 | | 8/24/2015 | | FAIL |
Evan Jenkins
|
|
|
Plan Designer certification Expired. Obtain Interim PD Certification by paying the $10 fee, plus bring in verification you are registered for the next PD Cert Course for 4th ESC Review and Approval per our conversations. Evan Jenkins 794.3958
|
Routing - Erosion and Sediment | 8/18/2015 | | 8/18/2015 | | FAIL |
Evan Jenkins
|
|
|
Plan Designer certification Expired. Obtain Interim PD Certification by paying the $10 fee, plus bring in verification you are registered for the next PD Cert Course for 3rd ESC Review and Approval per our conversations. Evan Jenkins 794.3958
|
Routing Off Site - STRUCTURAL | 7/27/2015 | | 8/17/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 7/27/2015 | 7/27/2015 | 8/4/2015 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - Erosion and Sediment | 7/27/2015 | | 7/28/2015 | | FAIL |
Evan Jenkins
|
|
|
Due to size, exceeding 600 SF (4,920+)SF, Full Erosion Control Narrative is Required to be submitted with your Erosion Control Site Map Per BCC 8-17. Evan Jenkins 794.3958
|
Plan resubmittals received | | | 7/27/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 7/1/2015 | 7/4/2015 | 7/2/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 7/1/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/4/2015 | | 7/1/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 6/4/2015 | | 7/1/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing Off Site - STRUCTURAL | 6/4/2015 | | 6/30/2015 | | FAIL |
Tim L. Woodard
|
|
|
Refer to Changemarks in E-Plan Review. TLW
|
Routing - PLANNING Land Div | 6/4/2015 | | 6/10/2015 | | PASS |
Dave Abo
|
|
|
Parcel B of ROS 6906.
|
Routing - PLUMBING | 6/4/2015 | | 6/8/2015 | | PASS |
Daryl Spivey
|
|
|
per pland and ISPC
|
Routing - Design Review | 6/4/2015 | | 6/8/2015 | | PASS |
|
|
|
Ok per DRH15-00023
|
Routing - FIRE | 6/4/2015 | | 6/8/2015 | | FAIL |
Scott Arellano
|
|
|
Comments attached to plans and emailed to architect.
|
Routing PW Drainage | 6/4/2015 | | 6/5/2015 | | PASS |
Brian Murphy
|
|
|
pad phase 2 prvious city approval
|
Routing PW Sewer Rating | 6/4/2015 | | 6/4/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 6/4/2015 | | 6/4/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/4/2015 | | 6/4/2015 | | PASS |
Jennifer Bruner
|
|
|
In West Boise Sewer District, call ###-####
|
Routing - Erosion and Sediment | 6/4/2015 | | 6/4/2015 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative Required For Approval per BCC 8-17. Site Map looks good, but require a Narrative. Evan Jenkins 794.3958
|
Intake Approval | | | 6/4/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 6/4/2015 | | 6/4/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 5/18/2015 | | FAIL |
|
|
|
Ward,
A complete prescreen wasn't able to be conducted because the checklist was not availible; however, here are some items that stood out without having the checklist as a guide: 1) #502 Checklist, 2) Envelope Compliance needs to be 2012 IECC, 3) Provide the additional Special Inspections forms not just the cover sheet, 4) Planning Approvals, 5) Verification of legal lot form, 6) Drainage Calculations, 7) Cival sheets(Grading and Drainage Plans), 8) Soils report, 9) ESC Narritive, 10) Rotate and reupload all verticle plan sheets, 11) Mechanical Compliance Report is illedgible (Fix sheet and reupload), 12) Slab edge insulation must extend to top of slab, 13) Roof insulation must extend to verticle edge of envelope, and anything else that is on the checklist.
Best regards,
Tim
|
Application received | | | 5/13/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 13 2015 4:31PM
|