BLD-Aging Inspection | 5/25/2016 | 5/25/2016 | 5/26/2016 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 5/24/2016 | 5/24/2016 | 5/26/2016 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 1/8/2016 | 1/8/2016 | 1/11/2016 | P | PASS |
Dave Hannah
|
|
|
Paul Phone #: ###-####
|
BLD-Final | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | PART |
Dave Hannah
|
|
|
Paul Phone #: ###-#### ok for temp occ needs to fix drinking fountians/ada they ext out more than 4inches
|
FIRE-Final Inspection | 12/9/2015 | 12/10/2015 | 12/10/2015 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete. Life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 12/7/2015 | 12/7/2015 | 12/8/2015 | P | CANC |
Jim Page
|
|
|
Spoke to contractor and informed him that fire alarms need to completed before life fire safety inspection can be done. Paul informed me that he was going to cancel this inspection for a later date, inspection was still on my schedule, canceling inspection request, contractor will reschedule for a later date.
|
BLD-Ceiling Grid Inspection | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | PASS |
Dave Hannah
|
|
|
Paul Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/9/2015 | 11/10/2015 | 11/12/2015 | A | PART |
Dave Hannah
|
|
|
Paul Phone #: ###-#### offices ok to cover
|
BLD-Framing/Rough-in | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | PASS |
Dave Hannah
|
|
|
Paul Phone #: ###-#### second floor ok to cover
|
CHANGE STATUS TO (ISS) | | | 10/6/2015 | | DONE |
|
|
|
plan mod fees paid
|
BLD-Framing/Rough-in | 9/21/2015 | 9/22/2015 | 9/22/2015 | P | PART |
Jim Storey
|
|
|
Paul// partial inspection Phone #: ###-#### first floor infil and wall ok to cover.
|
OVERRIDE | | | 9/22/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 9/17/2015 | 9/17/2015 | 9/22/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan Mod - ePlanReview - Idaho Central Credit Union
|
Routing - PLAN CHECK | 9/17/2015 | | 9/22/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/22/2015 | | DONE |
|
|
|
PLAN MOD--- DO NOT REISSUE
|
Route to Impact Fee Review | 9/17/2015 | 9/20/2015 | 9/21/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 9/17/2015 | 9/17/2015 | 9/21/2015 | | PASS |
Scott Arellano
|
|
|
No revisions to report required.
|
Plan Modification Accepted | | | 9/17/2015 | | DONE |
|
|
|
plan modification requested; architectural plan, mechanical plan, electrical plan
|
BLD-Framing/Rough-in | 8/27/2015 | 8/28/2015 | 8/28/2015 | A | PASS |
Dave Hannah
|
|
|
Mike-would like late AM if possible Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/23/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (PND) | | | 6/23/2015 | | DONE |
|
|
|
Issue by mistake need revised value and GC form DO NOT REISSUE
|
(F) Reprint permit | | | 6/23/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/23/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/23/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/22/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 6/5/2015 | 6/5/2015 | 6/22/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Level 3 TI - ePlanReview - Idaho Central Credit Union
|
Routing - PLAN CHECK | 6/5/2015 | | 6/22/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 6/22/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/22/2015 | | DONE |
|
|
|
Needs; G.C. Form, Revised Certificate of Value, Responsible Person
|
Routing PW Drainage | 6/5/2015 | | 6/15/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 6/5/2015 | 6/5/2015 | 6/8/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to plans
|
Routing - PLUMBING | 6/5/2015 | | 6/8/2015 | | PASS |
Bill VanDegrift
|
|
|
hub drain and trap primer per plans and ISPC
|
Routing - Erosion and Sediment | 6/5/2015 | | 6/8/2015 | | PASS |
Evan Jenkins
|
|
|
IDAHO CENTRAL CREDIT UNION: The exterior work consists of installing new composite metal panels, installing new standing seam metal roof, replace existing glazing with new glazing to match existing glazing, paint exterior cmu, replace existing parking lot lighting, and rework the east parking lot and parking lot landscaping. Interior TI work consist of demolition of existing improvements including walls doors, windows, ceilings window sills, mechanical, electrical, lighting. New interior work shall include new walls doors, windows, ceilings window sills, mechanical, electrical, lighting and fire sprinkler system rework. Additionally the TI will include the infilling of two existing opening in the first and second floor atrium.
|
Routing - Design Review | 6/5/2015 | | 6/8/2015 | | PASS |
Josh Wilson
|
|
|
Ok per DRH15-00133
|
Routing - Addressing | 6/5/2015 | | 6/5/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/5/2015 | | 6/5/2015 | | PASS |
Beverly Mountain
|
|
|
|
Pending Assignment by JCB | 6/4/2015 | | 6/5/2015 | | DONE |
Jason Blais
|
|
|
|
Routing PW Street Lights | 6/5/2015 | | 6/5/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Intake Approval | | | 6/2/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Westfall and plan review fees paid.
|
Plan Reviewer's activity | | | 5/19/2015 | | PASS |
|
|
|
Plan intake approved after 2nd review
|
Intake Approval | | | 5/18/2015 | | FAIL |
|
|
|
Please consider the circled items on the plan intake checklist and provide the requested information.
|
Application received | | | 5/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2015 1:54PM
|