FIRE-Final Inspection | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 10/8/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/5/2015 | 10/6/2015 | 10/6/2015 | A | PART |
Troy Cobbley
|
|
|
A temporary for fire life safety is being given until the possibly related vanilla finsh with Sundance Construction has been finaled or verified that it is not associated with this project.
|
Temporary Occupancy | 10/6/2015 | 1/4/2016 | 10/6/2015 | | DONE |
Kristal Soland
|
|
|
|
BLD-Final | 10/5/2015 | 10/6/2015 | 10/5/2015 | A | DONE |
Jim Storey
|
|
|
Carry Phone #: ###-####
|
BLD-Final | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Cari Phone #: ###-####final ok pending fire
|
FIRE-Final Inspection | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | FAIL |
Troy Cobbley
|
|
|
Need insulation attached in more locations in Mech Room 125, exit signs and emergency lights still did not get repaired and there is still the possible issue with the vanilla finish permit
|
FIRE-Final Inspection | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide correct address, repair exit signs and emergency lights, repair insulation in Mech Room 125, provide inspection for the open vanilla finish permit (Sundance Const.), and provide verification of annual inspections for fire sprinkler and fire alarm systems.
|
Issue PAID IN FULL permit | | | 10/2/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/1/2015 | | DONE |
|
|
|
Carry with Caring Smiles called. Informed her that the permit would need to be picked and the two inspections that would need to be done. Told her that once the inspections are done that the sign off card comes back to us and we print off the Occupancy for that space.
|
Telephone call | | | 9/28/2015 | | DONE |
|
|
|
Left a message for Scott, out of the office, to touch bases if this space is still going to be occupied
|
Print Occupancy Form | | | 5/20/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/20/2015 | | DONE |
|
|
|
All requirements met
|
Telephone call | | | 5/20/2015 | | DONE |
|
|
|
Let message for Steve that permit is ready
|
Plan assigned to (CJW) | 5/15/2015 | | 5/19/2015 | | PASS |
Carl Westfall
|
|
|
(May 19 - 3 days)
|
Routing - PLAN CHECK | 5/15/2015 | | 5/19/2015 | | PASS |
Carl Westfall
|
|
|
|
1st review completed | | | 5/19/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2015 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2015 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/2015 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 10/18/2015 | | | |
|
|
|
|
Application received | | 5/15/2015 | | | |
|
|
|
|