BLD-Final | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Jim Sly
|
|
|
3283 garage key code Phone #: ###-#### Inspection requested via web by David Wipper
|
DOC - Permit Finaled | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Jim Sly
|
|
|
|
PubWorks Occupancy Approval | 3/28/2016 | 3/28/2016 | 3/28/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Aging Inspection | 1/28/2016 | 1/28/2016 | 1/29/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/27/2016 | 1/27/2016 | 1/29/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Wall cover | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Phil Shearer
|
|
|
fire rated soffit inspection Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Energy code compliance | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Wall cover | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | CANC |
Phil Shearer
|
|
|
fire rated soffit inspection Phone #: ###-#### >> Inspection requested via web by David Wipper Inspection cancelled from web by: David Wipper
|
BLD-Energy code compliance | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | CANC |
Phil Shearer
|
|
|
Phone #: ###-#### >> Inspection requested via web by David Wipper Inspection cancelled from web by: David Wipper
|
BLD-Framing/Rough-in | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Wall cover | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | CANC |
Tony Young
|
|
|
Please inspect the fire rated soffitts Phone #: ###-#### >> Inspection requested via web by David Wipper Inspection cancelled from web by: David Wipper
|
BLD-Wall cover | 8/26/2015 | 8/27/2015 | 8/27/2015 | A | PASS |
Tony Young
|
|
|
shear inspection Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Foundation | 7/20/2015 | 7/20/2015 | 7/20/2015 | P | DEFR |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Concrete stemwall already placed when on site. Work APPEARED to be done in compliance with approved plan, no atteched engineering on site. Contractor accepts all liability for in place work.
|
BLD-Footing | 7/16/2015 | 7/17/2015 | 7/17/2015 | A | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
PubWorks Subgrade Approval | 7/15/2015 | 7/15/2015 | 7/15/2015 | | DONE |
Jason C. Taylor
|
|
|
***ALL MAIN LEVEL FOUNDATIONS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 7/6/2015 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 7/2/2015 | | |
|
|
|
|
1st review completed | | | 7/2/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/2/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (LEG) Tisha | 5/26/2015 | | 7/2/2015 | | PASS |
Tisha Gallop
|
|
|
did not show up on task list because "completed" date was filled out
|
Routing - PLAN CHECK | 5/26/2015 | | 7/2/2015 | | PASS |
Tisha Gallop
|
|
|
|
Routing - FIRE | 5/26/2015 | | 6/1/2015 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for Fire Department Vehicle access. All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 (Defensible Space) and subject to Fire Department inspection.
|
Routing - MECHANICAL | 5/26/2015 | | 5/27/2015 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 5/26/2015 | | 5/27/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 3178 sq. ft., two story (first story 2368 sq. ft., second story 810 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 531 sq. ft. of covered patio/porch and a 836 sq. ft. attached garag
|
Plans ACCEPTED BY PLAN TECH | | | 5/26/2015 | | DONE |
|
|
|
|
Intake Approval | | | 5/26/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/26/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 5/26/2015 | | 5/26/2015 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 5/26/2015 | | 5/26/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 5/26/2015 | | 5/26/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | 5/26/2015 | | 5/26/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Application received | | | 5/15/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 15 2015 9:56AM
|