BLD-Final | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 9/25/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 9/25/2015 | 9/25/2015 | 9/25/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Wall Bracing | 8/7/2015 | 8/10/2015 | 8/10/2015 | A | PASS |
Tony Young
|
|
|
Shear interior // Bob Phone #: ###-####
|
BLD-Energy code compliance | 8/4/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Tony Young
|
|
|
Insulation // Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 7/20/2015 | 7/21/2015 | 7/21/2015 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Foundation | 6/17/2015 | 6/19/2015 | 6/19/2015 | A | PART |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 6/17/2015 | 6/17/2015 | 6/17/2015 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, wip
|
PubWorks Subgrade Approval | 6/15/2015 | 6/15/2015 | 6/15/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 6/9/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/8/2015 | | |
|
|
|
|
1st review completed | | | 6/8/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/8/2015 | | DONE |
|
|
|
all requirments met
|
Plan assigned to (LEG) Tisha | 5/20/2015 | | 6/8/2015 | | DONE |
Tisha Gallop
|
|
|
6/8 L2
|
Routing - PLAN CHECK | 5/20/2015 | | 6/8/2015 | | PASS |
Tisha Gallop
|
|
|
|
Routing - FIRE | 5/20/2015 | 5/20/2015 | 6/1/2015 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated and approved for FD vehicle access.
|
Routing - MECHANICAL | 5/20/2015 | | 5/22/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/20/2015 | | 5/21/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing PW Grading-Hillside | 5/20/2015 | | 5/21/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Intake Approval | | | 5/20/2015 | | PASS |
|
|
|
|
Routing - Addressing | 5/20/2015 | | 5/20/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 5/20/2015 | | 5/20/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 5/20/2015 | | 5/20/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A, Permit for the construction of a new 2,417 sq. ft., two story (main level 2,288 sq. ft., upper level 1,129 sq. ft.) single family dwelling with 4 bedrooms, 2 bathrooms, approximately 457 sq. ft. of covered patio/porch and a 736 sq. ft. attached garage
|
Application received | | | 5/18/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 18 2015 10:27AM
|