Case Summary (BLD) | | | 6/1/2016 | | DONE |
|
|
|
|
Print Statement | | | 12/17/2015 | | DONE |
|
|
|
|
Third Notice | | 11/14/2015 | 12/10/2015 | | DONE |
|
|
|
|
Second Notice | | 10/22/2015 | 11/9/2015 | | DONE |
|
|
|
sent in mail
|
First Notice | | 10/3/2015 | 10/12/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/23/2015 | | DONE |
|
|
|
|
Zoning Approval | 9/22/2015 | 9/22/2015 | 9/22/2015 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 9/18/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Jim Storey
|
|
|
Lloyd Phone #: ###-#### pending zoning
|
FIRE-Final Inspection | 9/18/2015 | 9/21/2015 | 9/21/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
BLD-Final | 9/15/2015 | 9/16/2015 | 9/16/2015 | P | NR |
Jim Storey
|
|
|
Call 30 mins before to meet // Lloyd Phone #: ###-####
|
FIRE-Final Inspection | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | CANC |
Troy Cobbley
|
|
|
I spoke to Lloyd on the phone and we discussed the need for the issues with the fire sprinkler permit to be corrected and that there is an outstanding fire alarm permit for the hood suppression system that needs an inspection as well. He was going to follow up and rescheduled.
|
FIRE-Final Inspection | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | CANC |
Thomas Walsh
|
|
|
FLS inspection not conducted due to discrepancies noted with the fire sprinkler system (see FIR 15-00504) for details.
|
BLD-Final | 9/11/2015 | 9/14/2015 | 9/14/2015 | P | CANC |
Jim Storey
|
|
|
Llyod Phone #: ###-####// please call 30min prior
|
Print Occupancy Form | | | 7/28/2015 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Jim Storey
|
|
|
Llyod// please call 30 min Phone #: ###-#### ok to cover pending fire
|
Issue PAID IN FULL permit | | | 6/24/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/24/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/18/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 5/28/2015 | 5/28/2015 | 6/18/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Level 3 TI - ePlanReview - B&D Foods
|
Routing - PLAN CHECK | 6/18/2015 | | 6/18/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Rating | 6/18/2015 | | 6/18/2015 | | PASS |
Jennifer Bruner
|
|
|
per Jon Williams sewer connection fees are to by addressed by an MOU with B&D Foods.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/18/2015 | | DONE |
Christina Prado
|
|
|
Need GC, revised certificate of value & RP for issuance// RP met 6-23-15 KRS
|
Routing - PLAN CHECK | 5/28/2015 | | 6/11/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 6/11/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 5/28/2015 | 5/28/2015 | 6/5/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to plans
|
Routing PW Environmental | 5/28/2015 | | 6/2/2015 | | PASS |
Rick Christenson
|
|
|
1500 Gallon Exterior Grease Interceptor shown.
|
Routing - MECHANICAL | 5/28/2015 | | 6/1/2015 | | PASS |
Troy James
|
|
|
redlined drawings
|
Routing - PLUMBING | 5/28/2015 | | 6/1/2015 | | PASS |
Bill VanDegrift
|
|
|
Red line notes may require additional backflow protection.
|
Routing - Erosion and Sediment | 5/28/2015 | | 5/29/2015 | | PASS |
Evan Jenkins
|
|
|
(B&D FOODS) Minor construction within existing warehouse, adding (3) walls and ceiling structure to enclose a new kitchen area.
|
Routing PW Sewer Rating | 5/28/2015 | | 5/28/2015 | | FAIL |
Jennifer Bruner
|
|
|
Please coordinate with Jon Williams ###-#### regarding Sewer Rating.
|
Routing - Design Review | 5/28/2015 | | 5/28/2015 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - CZC15-00144
|
Routing - Addressing | 5/28/2015 | | 5/28/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 5/28/2015 | | 5/28/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Pending Assignment by JCB | 5/28/2015 | | 5/28/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 5/27/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see change marks on 518 check list. I still need Central District Health approval or a letter/email from them indicating that they do not need to review this project. This project will be routed as a major TI once it is approved.
|
Intake Approval | | | 5/27/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
|
Intake Approval | | | 5/26/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see change marks on 518 check list.
|
Application received | | | 5/19/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 19 2015 12:29PM
|